ENTSO-E Reference Data

Comprehensive reference codes from the official ENTSO-E Codelist Version 92 (January 2025) for the Transparency Platform and electricity market data exchange.

1059 codes found

Allocation Mode Types

3 codes
A01Order by price with
pro rata The allocation method is by price with eventual pro rata.
Allocation Mode Types
A02Order by price with
first come - first served The allocation method is by price with eventual use of first come first served.
Allocation Mode Types
A03First come - First
served The allocation method is first come first served.
Allocation Mode Types

AnalogType

42 codes
A01Flow
This is the computed flow for the monitored element in the constraint situation ("N situation", "N-1 situation" ...) after the capacity calculation. The flow is expressed in A, %, or MW.
AnalogType
A02Permanent admissible The permanent load of transmission system elements which is allowed for an
transmission limit unlimited period and which does not cause physical damage to the transmission (PATL) system elements as long as the defined threshold is respected.
AnalogType
A03Flow reliability margin This is the flow reliability margin for a given critical network element. The amount of
MW or A that is reserved for this critical network element and shall not be used for the computed outage situation, in order to secure the power network.
AnalogType
A04Spanning margin
value This is the margin that is taken into account when spanning (fall -back process) is applied. Spanning marginal value is an historical based parameter which specifies the amount of MW that reduces the RAM when spanning is applied. – Page 5 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
AnalogType
A05Long term allocation
margin This is the amount of MW that is added to the capacity of the critical network element in order to automatically include the long term allocation domain into the flow based domain.
AnalogType
A06Final adjustment
margin value This is the margin that is manually added or subtracted to the capacity of the critical network element. A negative value for final adjustment value simulates the effect of an additional margin due to complex remedial actions (RA) which cannot be modeled and so calculated in the flow based parameter calculation. A positive value for FAV as a consequence of the verification phase of the flow based domain, leading to the need to reduce the margin on one or more CBs for system security reasons.
AnalogType
A07Transitory admissible The temporary overload of transmission system elements which is allowed for a
transmission limit limited period and which does not cause physical damage to the transmission system (TATL) elements as long as the defined duration and thresholds are respected.
AnalogType
A08Long admissible flow
This is the value, expressed in A or MW, that the overload flow in a network element shall not exceed for a duration no longer than the long duration. The long duration value depends on the TSO network operating rules.
AnalogType
A09Negative Final
adjustment margin value This is the margin that is manually added to the capacity of the critical network element in order to simulate the effect of an additional margin due to complex remedial actions (RA) which cannot be modeled and so calculated in the flow based parameter calculation.
AnalogType
A10Minimum voltage level This is the minimum voltage that can be supported by a network element without
involving a risk for the security of supply.
AnalogType
A11Maximum voltage
level This is the maximum voltage that can be supported by a network element without involving a risk for the security of supply.
AnalogType
A12TATL after automatic
AnalogType
RAThe Transitory admissible transmission limit (TATL) which is allowed after a curative
Remedial Action (RA) has been applied.
AnalogType
A13TATL after curative
AnalogType
A14Computed Voltage
This is the computed voltage for a given monitored element.
AnalogType
A15Zero-Balance flow
This is the amount of power affected by a contingency that reflects a situation with a scheduled exchange of zero.
AnalogType
A16Available margin after This is the available flow margin adjusted for the consideration of remedial actions in
remedial actions capacity calculation.
AnalogType
A17Loss Factor
This is the loss factor for an asset.
AnalogType
A18Adjustment for
minimum RAM This is the adjustment applied to the capacity of a branch to have a minimum RAM (Remaining Available Margin) available for commercial exchanges.
AnalogType
A19Tap changer
The position of a Tap changer.
AnalogType
A20Regulator mode
A measurement type indicating the control mode of a regulator, i.e. from voltage regulation to fixed MVAR regulation.
AnalogType
A21Regulator set-point
The set-point of a regulator. A regulator can be a tap changer, a synchronous machine, a SVC or a shunt.
AnalogType
A22Reference Flow
This is the amount of power affected by a contingency that reflects a situation with scheduled exchanges from a reference situation.
AnalogType
A23CO2 emission
This is the CO2 emission from one or several assets.
AnalogType
A24Maximum admissible
current (Imax) The maximum admissible current of a critical network element or a critical network element and contingency.
AnalogType
A25Individual value
adjustment (IVA) Individual value adjustment resulting from TSO validation process. – Page 6 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
AnalogType
A26Linear flow
approximation (F0) The linear approximation of a flow in the reference net position in a situation without any cross-zonal exchanges.
AnalogType
A27Flow without
Flow per critical network element and contingency without commercial exchanges commercial within a capacity calculation region. exchanges (F0_Wce)
AnalogType
A28Flow without
commercial exchanges between areas (F0_all) Flow per critical network element and contingency without commercial exchanges between bidding zones within the same or different synchronous areas.
AnalogType
A29Flow due to noncostly remedial
actions (F_nrao) Expected flow change due to non-costly remedial actions.
AnalogType
A30Flow after long-term
nominations (F_LTN) Flow after consideration of long-term nominations.
AnalogType
A31Coordinated value
adjustment (CVA) Coordinated value adjustment resulting from coordinated validation process.
AnalogType
A32Minimum remaining
available margin as ratio of maximum allowable power flow (Ramr) Percentage of the maximum allowable power flow that needs to be available as minimum Remaining Available Margin.
AnalogType
A33Flows from already
Flows resulting from previously allocated cross -zonal capacities. allocated cross-zonal capacities (Faac)
AnalogType
A34Flow from remedial
action (FRA) Flow for increasing the Remaining Available Margin due to remedial action.
AnalogType
A35Assumed external
exchanges Flow resulting from assumed commercial exchanges outside the region (F_uaf).
AnalogType
A36Minimum remaining
available margin target Target capacity for exchanges by deducing the exchanges not related to the region.
AnalogType
A37Average voltage
Average voltage on two connecting nodes of a critical network element resulting from AC load flow calculation with applied reactive power constraints (U).
AnalogType
A38Average power factor Average power factor on two connecting nodes of a critical network element resulting
from AC load flow calculation (cos phi).
AnalogType
A39Lower ramp rate
The maximum rate that the output can be lowered by.
AnalogType
A40Raise ramp rate
The maximum rate that the output can be raised by.
AnalogType
A41Negative reference
flow The amount of power negatively affected by a contingency that reflects a situation with scheduled exchanges from a reference situation.
AnalogType

AssetType

89 codes
A01Tie line
A high voltage line used for cross border energy interconnections.
AssetType
A02Line
A specific electric line within a country.
AssetType
A03Resource Object
A resource that can either produce or consume energy.
AssetType
A04Generation
A resource that can produce energy.
AssetType
A05Load
A resource that can consume energy.
AssetType
A06Phase Shift
Transformer An electrical device for controlling the power flow through specific lines in a power transmission network.
AssetType
A07Circuit Breaker
An electrical switch designed to protect an electrical circuit from damage caused by overcurrent/overload or short circuit.
AssetType
A08Busbar
A specific element within a substation to connect grid elements for energy distribution purposes.
AssetType
A09Capacitor
A transmission element designed to inject reactive power into the transmission network.
AssetType
A10Inductor
A transmission element designed to compensate reactive power in the transmission network.
AssetType
A11Power plant
connection All the network equipment that link the generating unit to the grid.
AssetType
A12FACTS
Flexible Alternating Current Transmission System
AssetType
A13Production unit
A production unit is a composition of one or several generation units.
AssetType
A14Internal tie line
An internal tie line is a line between two scheduling areas within the same bidding zone.
AssetType
B01Biomass
A resource using biomass for energy.
AssetType
B02Fossil Brown
coal/Lignite A resource using Fossil Brown coal/Lignite for energy.
AssetType
B03Fossil Coal-derived
gas A resource using Fossil Coal-derived gas for energy.
AssetType
B04Fossil Gas
A resource using Fossil Gas for energy.
AssetType
B05Fossil Hard coal
A resource using Fossil Hard coal for energy.
AssetType
B06Fossil Oil
A resource using Fossil Oil for energy.
AssetType
B07Fossil Oil shale
A resource using Fossil Oil shale for energy.
AssetType
B08Fossil Peat
A resource using Fossil Peat for energy.
AssetType
B09Geothermal
A resource using Geothermal for energy.
AssetType
B10Hydro-electric pure
Unit in which moving water energy is converted to electricity using flowing water to pumped storage head generate electricity with a large dam and reservoirs. Pure pumped storage plants installation store water in an upper reservoir with no natural inflows.
AssetType
B11Hydro Run-of-river
head installation
AssetType
B12Hydro-electric storage Unit in which moving water energy is converted to electricity using flowing water to
head installation generate electricity with a large dam and reservoirs. Unit in which moving water energy is converted to electricity using flowing water to generate electricity in the absence of a large dam and reservoirs. – Page 8 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
AssetType
B13Marine unspecified
Unit in which marine energy is converted to electricity with equipment/devices not specified.
AssetType
B14Nuclear unspecified
A unit in which the heat source is a nuclear reactor of type that is not specified in other nuclear types.
AssetType
B15Other renewable
A resource using Other renewable for energy.
AssetType
B16Solar unspecified
Unit in which solar energy is converted to electricity with equipment/devices not specified.
AssetType
B17Waste
A resource using Waste for energy.
AssetType
B18Wind Offshore
Unit in which wind energy is converted to electricity using wind farms constructed in bodies of water, usually in the ocean.
AssetType
B19Wind Onshore
Unit in which wind energy is converted to electricity using wind farms constructed on land.
AssetType
B20Other unspecified
Other unspecified technology.
AssetType
B21AC Link
Overhead line or cable which is used to transmit electrical power via Alternative Current.
AssetType
B22DC Link
Overhead line or cable which is used to transmit electrical power via Direct Current.
AssetType
B23Substation
An assembly of equipment in an electric power system through which electric energy is passed for transmission, transformation, distribution or switching.
AssetType
B24Transformer
Electrical device that transfers energy from one voltage level to another voltage level.
AssetType
B25Energy storage
A resource that stores energy. It could be gas, electricity, etc.
AssetType
B26Demand Side
Response A resource that change its electricity consumption patterns in response to a signal or incentive.
AssetType
B27Dispatchable hydro
resource A resource referring to dispatchable hydro generation.
AssetType
B28Solar photovoltaic
Unit in which solar energy is converted to electricity using a technology based on the photoelectric effect.
AssetType
B29Solar concentration
Unit in which solar energy is converted to electricity using mirrors to concentrate the sun's energy to drive traditional steam turbines or engines.
AssetType
B30Wind unspecified
Unit in which wind energy is converted to electricity with equipment/devices not specified.
AssetType
B31Hydro-electric
unspecified Unit in which moving water energy is converted to electricity with equipment/devices not specified.
AssetType
B32Hydro-electric mixed Unit in which moving water energy is converted to electricity using flowing water to
pumped storage head generate electricity with a large dam and reservoirs. Mixed pumped storage plants installation use a combination of pumped storage and conventional hydroelectric plants with an upper reservoir that is replenished in part by natural inflows from a stream or river.
AssetType
B33Marine tidal
Unit in which marine energy from tides is converted to electricity.
AssetType
B34Marine wave
Unit in which marine energy from waves is converted to electricity.
AssetType
B35Marine currents
Unit in which marine energy from currents is converted to electricity.
AssetType
B36Marine pressure
Unit in which marine energy from pressure is converted to electricity.
AssetType
B37Thermal unspecified
Unit in which heat energy is converted to electricity with equipment/devices not specified in other thermal types. – Page 9 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
AssetType
B38Thermal combined
Unit in which heat energy is converted to electricity called Combined Cycle Gas cycle gas turbine with Turbine. The power is generated by the single or multiple gas turbine(s) in heat recovery combination with the steam turbine(s). The unit might be equipped with waste heat recovery (e.g. to district heating network).
AssetType
B39Thermal steam turbine Unit in which heat energy is converted to electricity. The power is generated with the
with back-pressure steam that is expanded in the back-pressure steam turbine with or without heat turbine (open cycle) output (e.g. to district heating network).
AssetType
B40Thermal steam turbine Unit in which heat energy is converted to electricity. The power is generated with the
with condensation steam that is expanded in the condensation steam turbine with or without heat output turbine (closed cycle) (e.g. to district heating network).
AssetType
B41Thermal gas turbine
with heat recovery Unit in which heat energy is converted to electricity called Simple Cycle Gas Turbine. The power is generated by the gas turbine and the flue gas waste heat is recovered (e.g. to district heating network).
AssetType
B42Thermal internal
combustion engine An internal combustion engine is a heat engine in which the combustion of a fuel occurs with an oxidizer (usually air) in a combustion chamber that is an integral part of the working fluid flow circuit (e.g. reciprocating engine). The unit might be equipped with waste heat recovery (e.g. to district heating network).
AssetType
B43Thermal micro-turbine Unit in which heat energy is converted to electricity called Simple Cycle Gas Turbine.
The power is generated by the gas turbine (capacity less than 500kWe). The unit might be equipped with waste heat recovery (e.g. to district heating network).
AssetType
B44Thermal Stirling
engine A Stirling engine is a heat engine that is operated by the cyclic compression and expansion of air or other gas (the working fluid) at different temperatures, resulting in a net conversion of heat energy to mechanical work.
AssetType
B45Thermal fuel cell
A fuel cell is an electrochemical cell that converts the chemical energy of a fuel (e.g. hydrogen) and an oxidizing agent (e.g. oxygen) into electricity through a pair of redox reactions.
AssetType
B46Thermal steam engine A steam engine is a heat engine that performs mechanical work using steam as its
working fluid. The steam engine uses the force produced by steam pressure to push a piston back and forth inside a cylinder.
AssetType
B47Thermal organic
Rankine cycle
AssetType
B48Thermal gas turbine
Unit in which heat energy is converted to electricity called Simple Cycle Gas Turbine. without heat recovery The power is generated by the gas turbine and there is no flue gas waste heat recovery.
AssetType
B49Nuclear heavy water
reactor A unit in which the heat source is a pressurized heavy -water reactor (PHWR) that is a nuclear reactor that uses heavy water (deuterium oxide D2O) as its coolant and neutron moderator.
AssetType
B50Nuclear light water
reactor A unit in which the heat source is a light-water reactor (LWR) that is a type of thermal-neutron reactor that uses normal water, as both its coolant and neutron moderator � furthermore a solid form of fissile elements is used as fuel.
AssetType
B51Nuclear breeder
A unit in which the heat source is a nuclear reactor that generates more fissile material than it consumes.
AssetType
B52Nuclear graphite
reactor A unit in which the heat source is a graphite -moderated reactor that is a nuclear reactor that uses carbon as a neutron moderator, which allows natural uranium to be used as nuclear fuel.
AssetType
B53Temporary energy
storage A resource that is temporarily connected to the grid and that may store energy when connected, such as an electric vehicle. The Organic Rankine Cycle (ORC) is named for its use of an organic, high molecular mass fluid with a liquid-vapor phase change, or boiling point, occurring at a lower temperature than the water-steam phase change. The fluid allows Rankine cycle heat recovery from lower temperature sources such as biomass combustion, industrial waste heat, geothermal heat, solar ponds etc. The low -temperature heat is converted into useful work, that can itself be converted into electricity. – Page 10 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
AssetType
B54Permanent energy
storage A resource that is permanently connected to the grid and that may store energy when connected, such as a pumped hydro.
AssetType
B55Electric vehicle
battery A resource using electric vehicle batteries, commercial and private. The reason for separating vehicle batteries and non-vehicle batteries is that the vehicle batteries not necessarily is connected to the charger.
AssetType
B56Heat pump specified
A heat pump is a device that uses work to transfer heat from a cool space to a warm space by transferring thermal energy using a refrigeration cycle
AssetType
B57Heat pump electrical
A heat pump is a device that uses electricity to transfer heat from a cool space to a warm space by transferring thermal energy using a refrigeration cycle.
AssetType
B58Heat pump absorption A heat pump is a device that uses absorption technology to transfer heat from a cool
space to a warm space by transferring thermal energy using a refrigeration cycle.
AssetType
B59Auxiliary power unit
A technology that provides energy as a backup.
AssetType
B60Water electrolysis
unspecified Unspecified water electrolysis.
AssetType
B61Water electrolysis low Unspecified water electrolysis at low temperature as in an Alkaline or Proto -Exchange
temperature Membrane (PEM) fuel cell. unspecified
AssetType
B62Water electrolysis low Main product water electrolysis at low temperature as in an Alkaline or Proto temperature main
Exchange Membrane (PEM) fuel cell. product
AssetType
B63Water electrolysis
high temperature unspecified
AssetType
B64Steam methane
Unspecified methane reforming. reforming unspecified
AssetType
B65Steam methane
Main product methane reforming without Carbon Capture and Sequestration reforming without (CCS)/Carbon Capture and Use (CCU). CCS/CCU unspecified
AssetType
B66Steam methane
Unspecified methane reforming with Carbon Capture and Sequestration reforming with (CCS)/Carbon Capture and Use (CCU). CCS/CCU unspecified
AssetType
B67Steam methane
reforming with CCS/CCU main product Main product methane reforming with Carbon Capture and Sequestration (CCS)/Carbon Capture and Use (CCU).
AssetType
B68Partial oxidation
unspecified Unspecified partial oxidation.
AssetType
B69Autothermal reforming Unspecified autothermal reforming.
unspecified
AssetType
B70Methanol reforming
unspecified Unspecified methanol reforming.
AssetType
B71Ammonia reforming
unspecified Unspecified ammonia reforming.
AssetType
B72Ammonia gasification Unspecified gasification.
AssetType
B73Chlor-alkali
electrolysis unspecified Unspecified water electrolysis at high temperature as in a Solid Oxide Electrolysis Cell (SOEC) fuel cell. Unspecified alkali electrolysis. – Page 11 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
AssetType
B74Chlor-alkali
electrolysis byproduct Alkali electrolysis product.
AssetType
B75ACDC converter
ACDC converters are electrical circuits that transform alternating current (AC) into direct current (DC) and vice versa.
AssetType

Auction Types

7 codes
A01Implicit
The auction is an implicit auction.
Auction Types
A02Explicit
The auction is an explicit auction.
Auction Types
A03Rule Based
The auction is a rule based auction.
Auction Types
A04Mixed
The auction is partially implicit and partially explicit.
Auction Types
A05Explicit/split
The auction concerns two explicit auctions on a split border.
Auction Types
A06Shadow auction
An explicit auction carried out in the case of the failure of an implicit auction.
Auction Types
A07Flow-based
The allocation is an implicit auction using flow -based capacity calculation.
Auction Types

Business Types

199 codes
A01Production
The nature of the business being described is production details.
Business Types
A02Internal trade
The nature of the business being described is internal trade details.
Business Types
A03External trade explicit The nature of the business being described is external trade details between two
capacity areas with limited capacity requiring a capacity agreement identification.
Business Types
A04Consumption
The nature of the business being described is consumption details.
Business Types
A05External trade total
The nature of the business being described is external trade total.
Business Types
A06External trade without The nature of the business being described is external trade details between two
explicit capacity areas without requiring capacity allocation information. – Page 12 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Business Types
A07Net Production /
Consumption Net production/consumption - where signed values will be used. With the following rules: In area=Out area, In party=Out party, + means production and - means consumption.
Business Types
A08Net internal trade
Net internal trade - where the direction from out party (seller) to in party (buyer) is positive and the opposite direction is negative (with minus signs).
Business Types
A09IPP (Independent
Power Producer) A time series concerning the production schedule from an IPP.
Business Types
A10Tertiary control
A time series concerning tertiary reserve.
Business Types
A11Primary control
A time series concerning primary reserve.
Business Types
A12Secondary control
A time series concerning secondary reserve.
Business Types
A13Load profile
A time series concerning a load profile as calculated by a metered data aggregator.
Business Types
A14Aggregated energy
data A time series concerning adjusted metered readings received from a metered data collector and aggregated and validated by a metered data aggregator.
Business Types
A15Losses
A time series concerning losses that have been calculated for a tieline or an area.
Business Types
A16Transits (CBT)
A time series concerning inter area transit flows determined for CBT requirements.
Business Types
A17Settlement deviation
A time series concerning the imbalance energy calculated by an imbalance settlement responsible.
Business Types
A18Technical constraint
deviation A time series defining the imbalance between schedules accepted by the system operator due to technical constraints and schedules declared by the balance responsible party.
Business Types
A19Balance energy
deviation A time series defining the imbalance between the schedule of a balance responsible party that has been corrected by the system operator after using balance energy bids and the schedule that was accepted by the system operator due to technical constraints.
Business Types
A20Imbalance volume
A time series defining the imbalance between the actual meter readings and the schedule of the balance responsible party corrected by the system operator after using balance energy bids.
Business Types
A21Unintended energy
A timeseries concerning the volume of an unintended cross -border exchange of energy.
Business Types
A22Frequency control
A time series concerning primary and secondary reserve.
Business Types
A23Balance management A time series concerning energy balancing services.
Business Types
A24Total trade
A time series concerning the total of both the internal and external trades.
Business Types
A25General Capacity
Information A time series providing the total capacity available on a TSO border.
Business Types
A26Available transfer
capacity (ATC) Available transfer capacity for cross-border exchanges.
Business Types
A27Net transfer capacity
(NTC) Net transfer capacity for cross-border exchanges.
Business Types
A28Control Area Program A time series providing the total exchanges between two TSOs (including the
commercial transactions, the compensation program and the losses compensation program). Note this definition might change when UCTE brings forward its coding requirements.
Business Types
A29Already allocated
capacity (AAC) The already allocated capacity is the total amount of allocated transmission rights. – Page 13 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Business Types
A30Internal inter area
trade A trade that occurs between internal areas within a market balance area.
Business Types
A31Offered Capacity
The time series provides the offered capacity.
Business Types
A32Capacity transfer
notification The time series provides information concerning the notification of the transfer of capacity to another market participant.
Business Types
A33Authorised AAC
The time series in question provides the amount of transmission capacity rights to be nominated.
Business Types
A34Capacity rights
The time series in question provides the capacity rights allocated for a given border.
Business Types
A35Minimum authorised
Business Types
AACThe time series in question provides the maximum amount of transmission capacity
rights to be nominated.
Business Types
A36Maximum authorised
Business Types
A37Installed generation
The time series in question provides the installed generation.
Business Types
A38Available generation
The time series in question provides the available generation.
Business Types
A40Interconnection Trade The Time series in question provides the designation of the ITR that may nominate
Responsible the capacity in question. Designation
Business Types
A41Released AAC
The already allocated capacity (AAC) that has been released for resale.
Business Types
A42Requested capacity
(with price) The time series in question provides information concerning the requested capacity including price information.
Business Types
A43Requested capacity
(without price) The time series in question provides information concerning the requested capacity but excludes price information.
Business Types
A44Compensation
program Compensation of unintentional deviation is performed by exporting to / importing from the interconnected system during the compensation period by means of schedules as calculated during the accounting of unintentional deviations.
Business Types
A45Schedule activated
reserves The cross border or internal reserves that are to be activated through schedule nomination.
Business Types
A46System Operator
redispatching The cross border redispatching between System Operators that are to be activated through schedule nomination.
Business Types
A47Market capacity price The price of the capacity offered on a given market.
Business Types
A48Market capacity price The difference between the price of capacity in a Market Balance Area receiving the
differential capacity (In Area) and the price of capacity in a Market Balance Area providing the capacity (Out Area), i.e. In Area Price - Out Area price.
Business Types
A49Inflow
The volume of water that flows into a reservoir in a given interval.
Business Types
A50Water extraction
The volume of water that can be extracted from a reservoir in a given interval.
Business Types
A51Turbined water
The volume of water that can be turbined in a plant in a given interval.
Business Types
A52Water spillage
The volume of water that is not turbined going through the spillway in a given interval.
Business Types
A53Planned maintenance Maintenance has been planned for the object in question with a forecast ending date.
Business Types
A54Unplanned outage
An unplanned outage has occurred on the object in question.
Business Types
A55Use it Or Sell it
(UIOSI) pricing The time series provides information on the capacity resold in the "use it or sell it" process and its corresponding price. – Page 14 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
Business Types
A56Compensation for
auction cancellation where capacity is for resale The time series provides information on the compensation of the capacity for resale following an auction cancellation.
Business Types
A57Resale pricing
For each Physical Transmission Rights holder, this document contains the resold capacity and its corresponding price.
Business Types
A58Curtailed capacity
compensation The time series provides information to compensate a party when curtailment is applied on the capacity obtained in a previous auction, resale or transfer.
Business Types
A59Use it Or Sell it
The time series provides information on the compensation for the capacity following (UIOSI) compensation an auction cancellation.
Business Types
A60Minimum possible
The time series provides a schedule of minimum possible values for a Resource Object. The nature of the flow could be defined by the attribute Direction.
Business Types
A61Maximum available
The time series provides a schedule of maximum available values for a Resource Object. The nature of the flow could be defined by the attribute Direction.
Business Types
A62Spot price
The time series provides the market spot prices from an auction.
Business Types
A63Minimum ATC
The Available Transmission Capacity that must be guaranteed because of regulatory constraints.
Business Types
A64Meter Measurement
data The data as provided for a meter measurement source.
Business Types
A65Accounting Point
Relevant data The metered data that is to be considered relevant for accounting purposes.
Business Types
A66Energy flow
Energy flow information.
Business Types
A67Power plant energy
Schedule Energy flow scheduled for a power plant.
Business Types
A68Compensation
Requirements for the compensation period The time series provides the compensation requirements for a given compensation period.
Business Types
A69Market coupling
results The time series provides the results of a market coupling auction.
Business Types
A70Production,
unavailable Production capacity that normally would be available, but due to maintenance or similar is temporarily unavailable.
Business Types
A71Supplementary
available generation The supplementary generation that is available.
Business Types
A72Interruptible
consumption The consumption that may be interrupted on request.
Business Types
A73Summarised Market
Balance Area Schedule A time series providing the total exchanges based on commercial transactions between two Market Balance Areas.
Business Types
A74Load Frequency
Control Program Schedule A time series providing the schedule information for the Load Frequency Control Program.
Business Types
A75Timeframe
A time series providing the total exchanges of Timeframe Independent Schedules Independent Schedule between two System Operators.
Business Types
A76Consumption
curtailment A time series providing the amount of voluntary consumption curtailed by the energy supplier of an end-consumer. – Page 15 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Business Types
A77Production,
dispatchable The nature of the business being described is dispatchable production details, i.e. generation output that can be changed by a request (activation order) of the TSO according with the applicable Market Rules.
Business Types
A78Consumption,
dispatchable The nature of the business being described is dispatchable consumption details, i.e. consumption output that can be changed by a request (activation order) of the TSO according with the applicable Market Rules.
Business Types
A79Production, nondispatchable
The nature of the business being described is non-dispatchable production details, i.e. generation output that cannot be modified by an activation order.
Business Types
A80Consumption, nondispatchable
The nature of the business being described is non-dispatchable consumption details, i.e. consumption output that cannot be modified by an activation order.
Business Types
A81Total Transfer
Capacity (TTC) The Total Transfer Capacity is the maximum exchange program between two areas compatible with operational security standards applicable at each system if future network conditions, generation and load patterns were perfectly known in advance.
Business Types
A82Mutual Emergency
Assistance Service (MEAS) The cross border Mutual Emergency Assistance Service between System Operators that are to be activated through schedule nomination.
Business Types
A83Auction cancelation
The time series covers auction cancellation right.
Business Types
A84Nomination
curtailment The time series covers nomination curtailment rights
Business Types
A85Internal redispatch
Redispatch to relieve Market Balance Area internal congestion.
Business Types
A86Control area balance
energy A sum of secondary, tertiary control as well as other energy that was used to balance a control area.
Business Types
A87Balancing energy
price Price of energy used to balance.
Business Types
A88Economised
secondary reserve The activated secondary reserve that had been economised due to pooled reserve management.
Business Types
A89Spinning reserve
The extra generating capacity that is available by increasing the production of generators that are already connected to the power system.
Business Types
A90Solar
The business being described concerns solar power.
Business Types
A91positive forecast
margin The business being described concerns a positive forecast margin.
Business Types
A92Negative forecast
margin The business being described concerns a negative forecast margin.
Business Types
A93Wind generation
The business being described concerns wind generation.
Business Types
A94Solar generation
The business being described concerns solar generation.
Business Types
A95Frequency
containment reserve The business being described concerns frequency containment reserve.
Business Types
A96Automatic frequency
restoration reserve The business being described concerns automatic frequency restoration reserve.
Business Types
A97Manual frequency
restoration reserve The business being described concerns manual frequency restoration reserve.
Business Types
A98Replacement reserve The business being described concerns replacement reserve.
Business Types
A99Financial information
The business being described concerns financial information.
Business Types
B01Interconnector
network evolution The business being described concerns interconnector network evolution. – Page 16 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
Business Types
B02Interconnector
network dismantling The business being described concerns interconnector network dismantling.
Business Types
B03Counter trade
The business being described concerns counter trades.
Business Types
B04Congestion costs
The business being described concerns congestion costs.
Business Types
B05Capacity allocated
(including price) The business being described concerns capacity allocation and includes price information.
Business Types
B06DC link constraint
The business being described concerns DC link constraints.
Business Types
B07Auction revenue
The business being described concerns auction revenue.
Business Types
B08Total nominated
capacity The business being described concerns the total nominated capacity.
Business Types
B09Net position
The business being described concerns net position.
Business Types
B10Congestion income
The business being described concerns congestion income.
Business Types
B11Production unit
The business being described concerns a production unit.
Business Types
B12Rounded market
coupling results Rounded outputs of the market coupling to be sent to TSOs and Market Participants.
Business Types
B13Allocation Revenue
The time series provides information on the revenue generated by the allocations.
Business Types
B14Production deviation
A time series concerning the imbalance energy between the metered production and the schedules calculated by an imbalance settlement responsible.
Business Types
B15Consumption
deviation A time series concerning the imbalance energy between metered consumption and the forecasted consumption calculated by an imbalance settlement responsible.
Business Types
B16Transmission asset
The business being described concerns a transmission asset.
Business Types
B17Consumption unit
The business being described concerns a consumption unit.
Business Types
B18In-feed ATC
Available Transfer Capacity at the in-feed side of a DC tieline.
Business Types
B19Out-feed ATC
Available Transfer Capacity at the out -feed side of a DC tieline.
Business Types
B20Balance up regulation A time series concerning balance regulation market prices for up regulation.
price
Business Types
B21Balance down
regulation price A time series concerning balance regulation market prices for down regulation.
Business Types
B22Main direction
A time series concerning the direction of balance regulations.
Business Types
B23Consumption
imbalance price A time series concerning imbalance prices for consumption.
Business Types
B24Production sales
imbalance price A time series concerning imbalance prices for production sales.
Business Types
B25Production purchase
imbalance price A time series concerning imbalance prices for production purchase.
Business Types
B26Average balance price A time series concerning the average prices between Market Balance Areas.
between MBAs
Business Types
B27Pumped
A time series concerning the electricity consumption related to pumping.
Business Types
B28Large installation
consumption A time series concerning consumption from large installation.
Business Types
B29Metering Grid Area
(MGA) imbalance A time series concerning imbalance between reported consumption, production and exchange in a Metering Grid Area. – Page 17 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Business Types
B30HVDC Link settings
The time series in question provides HVDC Link settings.
Business Types
B31Transmission
Reliability Margin (TRM) A time series concerning Transmission Reliability Margin (TRM).
Business Types
B32Imbalance component This information is used to provide to a pool manager the combined imbalance of all
for a pool the pool participants.
Business Types
B33Area Control error
(ACE) The sum of the instantaneous difference between the actual and the set -point value of the measured total power value and Control Program including Virtual Tie -Lines for the power interchange of a LFC Area or a LFC Block and the frequency bias given by the product of the K-Factor of the LFC Area or the LFC Block and the Frequency Deviation.
Business Types
B34Area Control Error
after Imbalance Netting A time series concerning the Area Control Error after applying the imbalance netting energy correction.
Business Types
B35Implicit and explicit
trade total The sum of cross border schedules based on implicit and explicit trades including long term, yearly, monthly, weekly, daily processes.
Business Types
B36Production units own
consumption The consumption of one or more production units.
Business Types
B37Constraint situation
The timeseries describes the constraint situation for a given TimeInterval. A constraint situation can be: - composed of a list of network elements in outage associated for each outage to a list of network elements on which remedial actions have been car ried out accordingly to contingency process - or it can be an external constraint.
Business Types
B38Initial domain
The timeseries describe the full flow based domain for a given TimeInterval. Critical network elements are displayed in details and their impact on the market is quantified.
Business Types
B39Flow based domain
The timeseries describe the full flow based domain for a given TimeInterval adjusted adjusted to long term to the latest update of the schedules. schedules Critical network elements are displayed in details and their impact on the market is quantified.
Business Types
B40Network element
constraint
Business Types
B41Calculation opposition The timeSeries describes a party who is opposed to the calculation result and
(Red Flag) imposes its transfer capacity value.
Business Types
B42Base case
proportional shift key The GSK or LSK are proportional to the base case generation or load.
Business Types
B43Proportional to
participation factors shift key The GSK or LSK are proportional to the participation factors.
Business Types
B44Proportional to the
remaining capacity shift key The GSK is proportional to the remaining available capacity.
Business Types
B45Merit order shift key
The GSK is proportional to a merit order list.
Business Types
B46Wind speed
The TimeSeries provides information on the wind speed.
Business Types
B47Wind direction
The TimeSeries provides information on the wind direction.
Business Types
B48Solar irradiance
The TimeSeries provides information on the power per unit area produced by the sun in the form of electromagnetic radiation.
Business Types
B49Air temperature
The TimeSeries provides information on the air temperature. The timeSeries describes limiting elements which are overloaded. – Page 18 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Business Types
B50Cloudiness
The TimeSeries provides information on the cloudiness, i.e. the level of coverage of the sky with clouds.
Business Types
B51Air humidity
The TimeSeries provides information on the level of humidity of the air.
Business Types
B52Atmospheric pressure The TimeSeries provides information on the atmospheric pressure.
Business Types
B53Precipitation
Business Types
B54Network constraint
The TimeSeries describes the network elements, that constraints the market, to be situation that taken into account to simulate a network constraint during the network load flow constraints the market studies. The network situation includes the contingencies, the remedial actions, the monitored network elements and the potential additional constraints.
Business Types
B55Contingency
The TimeSeries describes the network elements part of the contingency to be simulated for a given TimeInterval.
Business Types
B56Remedial Action
The TimeSeries describes a set of remedial actions for a given TimeInterval.
Business Types
B57Monitored Network
Element The TimeSeries describes the network elements to be monitored during the network load flow studies.
Business Types
B58Busbar
The TimeSeries describes the network elements that composed a busbar.
Business Types
B59Network Element
The TimeSeries describes network elements.
Business Types
SPSThe TimeSeries describes the network elements managed by a Special Protection
System (automation).
Business Types
B61Aggregated netted
external market schedule The aggregated netted external market schedules for a given border.
Business Types
B62Aggregated netted
external TSO schedule The aggregated netted external TSO schedules for a given border.
Business Types
B63Aggregated netted
external schedule The aggregated netted external schedules for a given border.
Business Types
B64Netted area AC
position The AC position for a given area.
Business Types
B65Netted area position
The netted aggregation of all AC external schedules of an area plus the aggregated External Netted Schedules of related HVDC links of an area.
Business Types
B66Interconnection shift
key The shift key series describes the amount of power to be shifted from a border area.
Business Types
B67DC flow with losses
DC flow with losses refers to the values at the importing end of the DC line.
Business Types
B68DC flow without
losses DC flow without losses refers to the values at the exporting end of the DC line.
Business Types
B69minimum value of
netted area position That value which a netted area position must not fall below for a given area.
Business Types
B70maximum value of
netted area position That value which a netted area position must not exceed for a given optimisation area.
Business Types
B71maximum value of DC That value which a balanced DC flow must not exceed for a given DC line on
flow exporting end. When aligning DC flows CGMA algorithm will respect this constraint.
Business Types
B72minimum value of DC That value which a balanced DC flow must not fall below for a given DC line on
exporting end. Currently this business type is only included for consistency reasons. flow It is always set to 0. This constraint might, however, be used in future. When aligning DC flows the CGMA algorithm will respect this constraint. The TimeSeries provides information on the amount of rain, snow, etc. that falls on the ground. – Page 19 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Business Types
B73indicative AC flow
It is the hypothetical flow on the aggregate of all AC tie lines of an electrical border between two optimisation areas. It results from the adjustments to the preliminary netted area positions of all optimisation areas made by the CGMA algorithm. Indicative AC flows are an artefact of the CGMA algorithm, and do not correspond to physical flows
Business Types
B74Offer
The time series provides an offer to provide reserves.
Business Types
B75Need
The time series provides a requirement for reserves.
Business Types
B76Opportunity costs or
benefits The time series describes any opportunity costs or benefits.
Business Types
B77Financial
compensation or penalties The time series describes any financial compensation or penalties
Business Types
B78Global radiation
The total short-wave radiation from the Global radiation is the total short -wave radiation from the sky falling onto a horizontal surface on the ground. It includes both the direct solar radiation and the diffuse radiation resulting from reflected or scatt ered sunlight.
Business Types
B79Diffuse radiation
Radiation resulting from reflected or scattered sunlight.
Business Types
B80Direct solar radiation
Radiation resulting from direct sunlight
Business Types
B81Outage (OUT)
Outage process: Element is out of operation due to planned maintenance or due to an unplanned/forced outage. Outage may be used as a synonym for unavailability.
Business Types
B82Special switching
state (SSS) Outage Process: This state applies to grid elements which are in operation in an exceptional state (e.g. separated nodes operation).
Business Types
B83Testing (TEST)
Outage process: TESTING means any element status is possible - ON or OUT. This status applies either between first connection and final commissioning of the relevant asset, or directly following maintenance of the relevant asset.
Business Types
B84Auxiliary busbar
operation Outage process: Element is in operation but connected via auxiliary busbar
Business Types
B85Automatic reclosing
Outage process: Protection function Automatic reclosing is switched off for electric line
Business Types
B86Busbar protection
Protection function busbar protection is switched off
Business Types
B87Phase Shift Angle
The maximum phase shift angle allowed between two network elements.
Business Types
B88Base Case Network
Situation The TimeSeries describes the network elements to be taken into account to simulate a base case network situation during the network load flow studies, without any contingency.
Business Types
B89Inter-TSO assistance Cross border assistance schedule between TSOs not interconnected directly.
Business Types
B90FlexibleNeed
The business type indicates that the need is optional.
Business Types
B91GLSK Limitation
A constraint related to a GLSK maximum or minimum limitation in the production or/and consumption shift.
Business Types
B92Capacity ramping
limitation A constraint related to a ramping limitation on the capacity offered at a given border.
Business Types
B93interconnector
capacity The maximum capacity that can be exchanged on an interconnector, excluding external factor on both ends.
Business Types
B94Must Run
A time series concerning must run generation.
Business Types
B95Procured capacity
An accepted offer of balancing capacity.
Business Types
B96Used capacity
The used cross-zonal balancing capacity. – Page 20 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Business Types
B97Estimated costs
Estimated costs of the process.
Business Types
B98Estimated benefits
Estimated benefits of the process.
Business Types
B99Load Shedding
A time series concerning a load shedding used to avoid failure of the power system. C01 Remaining Capacity A time series concerning the remaining capacity. C02 Indicator of generation capacity adequacy Indicator of adequacy, it indicates if there is final generation remaining capacity after SMTA calculation. C03 Income from price divergence without congestions The time series describes income due to price divergence without congestion between bidding zones. C04 Push-button The cross-border Push-button service between System Operators. C05 Intertripping The cross-border Intertripping service between System Operators. C06 Emergency instruction The cross-border Emergency instruction service between System Operators. C07 Ramp management The schedule resulting from cross-border Ramp management service between System Operators. C08 Profile smoothing The schedule resulting from cross-border Profile smoothing service between System Operators. C09 Emergency reallocation deselection The schedule resulting from cross-border Emergency reallocation deselection service between System Operators. C10 SO-SO-trade The generic cross border trade between System Operators. C11 Production reduction A time series providing the volume of production reduced by an energy provider / producer / supplier. C12 Maximum power exchange The timeseries provides the maximum admissible power flow between two bidding zones respecting operational security limits taking into account N -1 criterion. C13 Maximum power exchange after remedial actions The timeseries provides the maximum admissible power flow between two bidding zones after remedial actions. C14 Network constraint situation that cannot limit the market The TimeSeries describes the network elements, that cannot limit the market, to be taken into account to simulate a network constraint during the network load flow studies. The network situation includes the contingencies, the remedial actions, the monitored network elements and the potential additional constraints. C15 Flat participation for Flat GSK factors of all generators or loads, independently of the size. all generators or loads C16 Proportional to installed capacity of generators Generators participate relative to their maximum (installed) capacity (MW). C17 Market price and total A time series concerning market price and total volume. volume C18 Import price A time series concerning import price (the volume-weighted price average of all accepted bids). C19 Capacity allocated (excluding price) The business being described concerns capacity allocation and excludes price information. C20 Common Grid Model Equipment The timeseries provides equipment related to the Common Grid Model (CGM). – Page 21 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description C21 Exchanged balancing The balancing reserve capacity exchanged between areas. reserve capacity C22 Shared balancing reserve capacity The balancing reserve capacity shared between areas. C23 Share of reserve capacity A time series concerning the share of reserve capacity. C24 Actual reserve capacity A timeseries concerning actual reserve capacity. C25 K-factor K-factor as stated in the SO GL Art. 2 (45). It is also known as Frequency Bias. C26 Frequency FCR-N is a reserve that is automatically activated in both directions around a set Containment Reserve- point when the frequency varies between 50.10 Hz and 49.90 Hz after an imbalance. Normal (FCR-N) FCR-D is a reserve that is automatically activated when the frequency falls below C27 Frequency Containment Reserve- 49.90 Hz or rises above 50.1 Hz after an imbalance. Disturbance (FCR-D) C28 Internal trade difference A time series concerning internal trade difference, within an area, such as a Bidding Zone or Scheduling Area. The internal trade difference is the difference between trades reported from an out party (seller) and an in party (buyer). C29 Small scale production Production from small scale production plants. C30 System price The system price is an unconstrained market clearing reference price. It is calculated without any congestion restrictions by setting capacities to infinity. C31 Wind gust An increase in the speed of the wind lasting for a short period. C32 Area imbalance A time series concerning imbalance between planned consumption, production and exchange in an Area. C33 Unintended energy price A timeseries concerning the price of the unintended cross -border exchange of energy. C34 Frequency containment process energy A timeseries containing the volume of energy resulting from the frequency containment process. C35 Frequency containment process energy price A timeseries containing the energy price from the frequency containment process. C36 Ramping period energy A timeseries containing the volume of energy exchanged as a result of ramping between different ANES values. C37 Ramping period energy price A timeseries containing the price of the energy exchanged as a result of ramping between different ANES values. C38 Frequency deviation A timeseries concerning the difference between the actual and the nominal frequency of a synchronous area. C39 Day-Ahead market price A timeseries concerning Day-Ahead market prices. C40 Conditional bid Standard product bid that is conditional on bids submitted outside of common platform. C41 Thermal limit The current causing a given network element to work outside of the range of safe operating temperatures. C42 Frequency Limit A constraint related to the containment of frequency deviations within a given area. – Page 22 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description C43 Voltage limit The maximum or minimum permissible voltage within normal operation state of a given network element. C44 Current limit The maximum permissible current within normal operation state of a given network element. C45 Short circuit current limit The maximum permissible short-circuit current within normal operation state of a given network element. C46 Dynamic stability limit A maximum permissible load ensuring the control of oscillations in the grid and avoiding the loss of synchronism. C47 Disconnection A timeseries describing disconnection of a TSO from a common platform. C48 Intended energy with positive price A timeseries concerning the amount of intended energy with prices higher than zero (and including zero). C49 Intended energy with negative price A timeseries concerning the amount of intended energy with prices lower than zero (excluding zero). C50 Decopuling A time series describing decoupling of an area. C51 Resource capacity unit A timeseries containing information about resource capacity units. C52 Resource entry capacity data A timeseries containing the resource capacity that can be allocated to an eligible resource capacity operator from another area. C53 Resource capacity obligation data A timeseries containing the resource capacity operator obligation to guarantee delivery. C54 Available energy A timeseries concerning the available energy. C55 Production curtailment A timeseries concerning the curtailment of production. C56 Rounding error A timeseries describing a rounding error. C57 Metered frequency The timeseries provides information about metered frequency. C58 Adjusted TTC to the nominal criteria The exchange program between two areas which guarantees that the Margin Available for Cross-Zonal Trade (MACZT) fulfils the nominal criteria at least on the most limiting Critical Network Element with Contingency (CNEC) which limits the transfer capacity. C59 Adjusted TTC to the nominal criteria with TSOs limitation The exchange program between two areas which allows the Margin Available for Cross-Zonal Trade (MACZT) on, at least, the most limiting Critical Network Element with Contingency (CNEC) to get closer to the nominal criteria fulfilment with a limited impact on the rest of the network. C60 Frequency deviation larger than standard deviation Total time in which the absolute value of the instantaneous frequency deviation was larger than the standard frequency deviation. C61 Frequency deviation larger than maximum deviation Total time in which the absolute value of the instantaneous frequency deviation was larger than the maximum instantaneous frequency deviation. C62 Frequency deviation not returned to 50% Number of events in which the absolute value of the instantaneous frequency deviation of the synchronous area exceeded 200 % of the standard frequency deviation as stated in SO GL (EU) regulation Art 131.1.a.vi. C63 Frequency deviation not returned to restoration range Number of events in which the absolute value of the instantaneous frequency deviation of the synchronous area exceeded 200 % of the standard frequency deviation. C64 Frequency deviation outside recovery range Number of events for which the absolute value of the instantaneous frequency deviation was outside of the frequency recovery range. – Page 23 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description C65 Frequency A time series describing measurement frequency. C66 Mean value A time series describing mean values. C67 Standard deviation A time series describing standard deviation. C68 Percentile A time series describing percentiles. C69 Measured frequency resolution A time series describing the resolution of a measured frequency. C70 Accuracy A time series describing measurement accuracy. C71 FRCE outside level 1 The number of time intervals in which the average value of the FRCE was outside the range Level 1 FRCE range as stated in SO GL. (EU) regulation Art 131.1.b.i. C72 FRCE outside level 2 The number of time intervals in which the average value of the FRCE was outside the range Level 2 FRCE range as stated in SO GL (EU) regulation. Art 131.1.b.i. C73 FRCE exceeded 60% The number of events for which the FRCE exceeded 60 % of the reserve capacity on of FRR capacity FRR as stated in SO GL (EU) regulation Art 131.1.b.ii. C74 FRCE exceeded The number of events for which the absolute value of the FRCE exceeded the steady state deviation maximum steady-state frequency deviation. C75 FRCE calculation and A time series describing how FRCE is calculated and its accuracy. accuracy descriptor C76 Forecasted capacity A time series describing forecasted capacity. C77 Minimum available capacity A time series describing minimum available capacity. C78 Average available capacity A time series describing average available capacity. C79 Maximum available capacity A time series describing maximum available capacity. C80 Frequency and accuracy descriptor A time series describing how system frequency and accuracy are determined. C81 Long-Term internal redispatch A time series describing long-term redispatch to relieve Scheduling Area internal congestion. C82 Other unavailability This is an unplanned unavailability. Not considered by market participants as a planned maintenance. C83 Faster than standard
Business Types
FATBids that can support a �Full Activation Time� (FAT) that is faster than standard
FAT. Fast activation can be done for bids with activation time shorter than the minimum requirement for the standard product. When circumstances call for it, the TSO can order activation of such bids on a shorter notice. C84 Faster than standard deactivation time Fast deactivation can be done for bids with activation time shorter than the minimum requirement for the standard product. When circumstances call for it, the TSO can order activation of such bids on a shorter notice. C85 Slower than standard Bids that can support a Full Activation Time (FAT) that is slower than standard FAT.
Business Types

CategoryType

3 codes
A01Base
The auction is for a base period.
CategoryType
A02Peak
The auction is for a peak period.
CategoryType
A03Off peak
The auction is for an off peak period.
CategoryType

ClassificationType

1 codes
A01Detail type
The Time Series content provides detailed information.
ClassificationType

CodingSchemeType

8 codes
EICThe coding scheme is the Energy Identification Coding Scheme (EIC), maintained by
ENTSO-E.
CodingSchemeType
CGMThe coding scheme used for Common Grid Model Exchange Standard (CGMES).
CodingSchemeType
A10Coding scheme which The coding schemes maintained by GS1.
are part of GS1 system NAD Andorra National coding scheme The National coding scheme of the country in question. NAL Albania National coding scheme The National coding scheme of the country in question. NAM Armenia National coding scheme The National coding scheme of the country in question. NAT Austria National coding scheme The National coding scheme of the country in question. NAZ Azerbaijan National coding scheme The National coding scheme of the country in question. NBA Bosnia and The National coding scheme of the country in question. Herzegovina National coding scheme NBE Belgium National coding scheme The National coding scheme of the country in question. NBG Bulgaria National coding scheme The National coding scheme of the country in question. NCH Switzerland National coding scheme The National coding scheme of the country in question. NCS Serbia and Montenegro National coding scheme The National coding scheme of the country in question. NCY Cyprus National coding scheme The National coding scheme of the country in question. NCZ Czech Republic National coding scheme The National coding scheme of the country in question. NDE Germany National coding scheme The National coding scheme of the country in question. NDK Denmark National coding scheme The National coding scheme of the country in question. NEE Estonia National coding scheme The National coding scheme of the country in question. – Page 26 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description NES Spain National coding The National coding scheme of the country in question. scheme
CodingSchemeType
NFIFinland National
coding scheme The National coding scheme of the country in question. NFR France National coding scheme The National coding scheme of the country in question. NGB United Kingdom National coding scheme The National coding scheme of the country in question. NGE Georgia National coding scheme The National coding scheme of the country in question.
CodingSchemeType
NGIGibraltar National
coding scheme The National coding scheme of the country in question. NGR Greece National coding scheme The National coding scheme of the country in question. NHR Croatia National coding scheme The National coding scheme of the country in question. NHU Hungary National coding scheme The National coding scheme of the country in question.
CodingSchemeType
NIEIreland National
coding scheme The National coding scheme of the country in question.
CodingSchemeType
NITItaly National coding
scheme The National coding scheme of the country in question. NKG Kyrgyzstan National coding scheme The National coding scheme of the country in question. NKZ Kazakhstan National coding scheme The National coding scheme of the country in question.
CodingSchemeType
NLILiechtenstein National The National coding scheme of the country in question.
coding scheme NLT Lithuania National coding scheme The National coding scheme of the country in question. NLU Luxembourg National The National coding scheme of the country in question. coding scheme NLV Latvia National coding The National coding scheme of the country in question. scheme NMA Morocco National coding scheme The National coding scheme of the country in question. NMD Moldavia National coding scheme The National coding scheme of the country in question. NMK Macedonia National coding scheme The National coding scheme of the country in question. NNL Netherlands National coding scheme The National coding scheme of the country in question. NNN Nordic Regional coding scheme The coding scheme of the Nordic region which covers Denmark, Finland, Norway and Sweden. – Page 27 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description NNO Norway National coding scheme The National coding scheme of the country in question. NPL Poland National coding scheme The National coding scheme of the country in question. NPT Portugal National coding scheme The National coding scheme of the country in question. NRO Romania National coding scheme The National coding scheme of the country in question. NRU Russian Federation National coding scheme The National coding scheme of the country in question. NSE Sweden National coding scheme The National coding scheme of the country in question.
CodingSchemeType

CoordinateSystemType

3 codes
A01ED50
ED 50 (European Datum 1950) is a geodetic datum which was defined after World War II for the international connection of geodetic networks.
CoordinateSystemType
A02OSGB36
Ordinance Survey Great Britain 1936. The Ordinance Survey (OS) devised the national grid reference system, and it is heavily used in their survey data, and in maps (whether published by the Ordinance Survey or commercial map producers) based on those surveys.
CoordinateSystemType
A03WGS84
The World Geodetic System version 1984. for use in cartography, geodesy, and navigation including by GPS. It comprises a standard coordinate system for the earth, a standard spheroidal reference surface (the datum or reference ellipsoid) for raw altitude data, and a gravitational equipotential surface (the geoid) that defines the nominal sea level.
CoordinateSystemType

Contract Types

15 codes
A01Daily contract
The condition under which capacity is allocated and handled is by daily auction or a daily transmission allocation procedure.
Contract Types
A02Weekly contract
The condition under which capacity is allocated and handled is by weekly auction or a weekly transmission allocation procedure.
Contract Types
A03Monthly contract
The condition under which capacity is allocated and handled is by monthly auction or a monthly transmission allocation procedure.
Contract Types
A04Yearly contract
The condition under which capacity is allocated and handled is by yearly auction or a yearly transmission allocation procedure.
Contract Types
A05Total contract
This is the sum of all capacity contract types for the period covered.
Contract Types
A06Long term contract
The condition under which capacity is allocated and handled is by long term trade agreements according to European regulations (EU Directive 1228/2003).
Contract Types
A07Intraday contract
The condition under which the capacity is allocated and handled is through an intraday auction and allocation process.
Contract Types
A08Quarter yearly
contract The condition under which capacity is allocated and handled is by quarter yearly auction or a quarter yearly transmission allocation procedure.
Contract Types
A09Semestrial contract
The condition under which capacity is allocated and handled is by half yearly auction or a half yearly transmission allocation procedure.
Contract Types
A10Multiple year contract The condition under which capacity is allocated and handled is by multiple year
auctions.
Contract Types
A11Intraday balancing
mechanism contract The condition under which the capacity is allocated and handled is through intraday energy balancing services.
Contract Types
A12Historical contract
A Contract established before the EU directive that are valid until the term of the contract.
Contract Types
A13Hourly contract
The condition under which capacity is allocated and handled is by hourly auctions.
Contract Types
A14First intraday auction The first intraday auction contract (IDA1).
contract
Contract Types
A15Second intraday
auction contract
Contract Types

CurrencyType

1 codes
ISKThe Legal tender of Iceland.
Icelandic krona LEK Albanian lek The Legal tender of Albania.
CurrencyType

CurveType

4 codes
A01Sequential fixed size
block The curve is made of successive Intervals of time (Blocks) of constant duration (size), where the size of the Blocks is equal to the Resolution of the Period.
CurveType
A02Point
The curve is made of successive instants of time (Points). – Page 30 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
CurveType
A03Variable sized Block
The curve is made of successive Intervals of time (Blocks) of variable duration (size), where the end date and end time of each Block are equal to the start date and start time of the next Interval. For the last Block the end date and end time of the last Interval would be equal to EndDateTime of TimeInterval.
CurveType
A04Overlapping
breakpoint The curve is made of successive Intervals of time of variable duration (size), where the end date and end time of each interval are equal to the start date and start time of the next Interval.
CurveType

DirectionType

3 codes
UPUp signifies that the available power can be used by the Purchasing area to increase
energy.
DirectionType
DOWNDown signifies that the available power can be used by the Purchasing area to
decrease energy.
DirectionType
A03UP and DOWN
Up and Down signifies that the UP and Down values are equal.
DirectionType

FuelType

54 codes
A01Unspecified
Fuel that cannot be associated with any of available fuel codes.
FuelType
A02Renewable solid
unspecified Fuel produced in a solid form from renewable resources that cannot be associated with any of available renewable solid fuel codes.
FuelType
A03Renewable solid
municipal waste Solid waste of biological material produced by households, hospitals and the tertiary sector (in general all waste that resembles household waste).
FuelType
A04Renewable solid
industrial and commercial waste Solid waste generated by businesses, production units, bureaus and offices.
FuelType
A05Renewable solid wood Solid wood energy resource.
– Page 32 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
FuelType
A06Renewable solid
animal fats Solid animal fats energy resource.
FuelType
A07Renewable solid
biomass from agriculture Solid by-products and residues from agriculture.
FuelType
A08Renewable liquid
unspecified Fuel produced in form of liquid from renewable resources that cannot be associated with any of available renewable liquid fuel codes.
FuelType
A09Renewable liquid
municipal biodegradable waste Liquid municipal waste capable of undergoing anaerobic or aerobic decomposition.
FuelType
A10Renewable liquid
black liquor Alkaline-spent liquor obtained from the digesters during the production of sulphate or soda pulp.
FuelType
A11Renewable liquid pure Oil produced from plants, mainly from rapeseed and sunflower crops.
plant oil
FuelType
A12Renewable liquid
waste plant oil Oil produced from plants that is no longer usable for its originally intended purpose.
FuelType
A13Renewable liquid
refined vegetable oil Oil produced from plants and transformed into fuel by refining process (hydrocracking or hydrogenation).
FuelType
A14Renewable gaseous
unspecified Fuel produced in form of gas from renewable resources that cannot be associated with any of available renewable gaseous fuel codes.
FuelType
A15Renewable gaseous
landfill gas Gas produced by digestion of land filled waste.
FuelType
A16Renewable gaseous
sewage gas Gas produced from the anaerobic fermentation of sewage sludge.
FuelType
A17Renewable gaseous
agricultural gas Gas produced from agricultural processes.
FuelType
A18Renewable gaseous
gas from organic waste digestion Gas produced by anaerobic digestion process from organic waste.
FuelType
A19Renewable gaseous
process gas Gas produced by an industrial process as a consequence.
FuelType
A20Renewable gaseous
other biogenic sources Gas produced by form of biogenic resource transformation that cannot be associated with any of available renewable gaseous fuel codes that use biogenic energy resource.
FuelType
A21Renewable heating
and cooling solar Sunlight energy source.
FuelType
A22Renewable heating
and cooling geothermal Geothermal energy source.
FuelType
A23Renewable heating
and cooling aerothermal Thermal energy obtained from air.
FuelType
A24Renewable heating
and cooling hydrothermal Thermal energy obtained from large body of water.
FuelType
A25Renewable heating
and cooling process heat Thermal energy obtained from process heat. – Page 33 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
FuelType
A26Renewable
mechanical unspecified Energy from renewable resource transformed into mechanical energy that cannot be associated with any of available renewable mechanical fuel codes.
FuelType
A27Renewable
mechanical wind Kinetic energy of wind transformed into mechanical energy.
FuelType
A28Renewable
Falling or flowing water energy or energy derived from tidal movement, wave motion mechanical hydro and or ocean current. marine
FuelType
A29Fossil unspecified
Unspecified fossil energy source.
FuelType
A30Fossil solid
unspecified Unspecified fossil solid energy source.
FuelType
A31Fossil solid hard coal Hard coal solid fossil energy source. This includes Anthracite, Bituminous coal,
Coking coal, Coke-oven coke and Lignite coke.
FuelType
A32Fossil solid brown
coal Brown coal solid fossil energy source. This includes Sub -bituminous coal, Lignite, Brown coal briquette and Peat briquette.
FuelType
A33Fossil solid peat
Solid fossil peat energy source.
FuelType
A34Fossil solid municipal Solid fossil municipal waste energy source.
waste
FuelType
A35Fossil solid industrial Solid fossil industrial and commercial waste energy source.
and commercial waste
FuelType
A36Fossil liquid
unspecified
FuelType
A37Fossil liquid crude oil Liquid crude oil fossil energy source. This includes shale oil or other types.
FuelType
A38Fossil liquid natural
gas liquids (NGL) Liquid natural gas liquids (NGL) fossil energy source.
FuelType
A39Fossil liquid
petroleum products Liquid petroleum products energy source. This includes Ethane,Naphtha, Aviation gasoline , Motor gasoline, Aviation turbine fuel,Other kerosene,Gas/diesel oil , Fuel oil, low sulphur ,Fuel oil, high sulphur ,Liquid Petroleum Gas , Orimulsion , Bitumen ,Lubricants ,Petroleum coke , Refinery Feedstock.
FuelType
A40Fossil gaseous
unspecified Unspecified fossil gaseous energy source.
FuelType
A41Fossil gaseous
natural gas Fossil gaseous natural gas energy source.
FuelType
A42Fossil gaseous coalderived gas
Fossil gaseous coal-derived gas energy source. This includes Blast furnace gas,Coke-oven gas or other types.
FuelType
A43Fossil gaseous
petroleum products Fossil gaseous petroleum products energy source. This includes Propane, Butane, Refinery gas, Chemical waste gas or other types.
FuelType
A44Fossil gaseous
municipal gas plant Fossil gaseous municipal gas plant energy source.
FuelType
A45Fossil gaseous
process gas Fossil gaseous process gas energy source. This includes Carbon monoxide, Methane , Hydrogen (fossil sourced) ,Phosphor gas ,Oxy gas and other types.
FuelType
A46Fossil heat
unspecified Unspecified fossil heat energy source.
FuelType
A47Fossil heat process
heat Fossil process heat energy source. Unspecified fossil liquid energy source. – Page 34 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
FuelType
A48Nuclear solid
radioactive fuel Solid Nuclear radioactive energy source. This includes UOX, AGR, MOX or other types.
FuelType
A49Gas synthesis
unspecified Unspecified gas synthesis energy source.
FuelType
A50Gas synthesis furnace Gas synthesis from furnace gas energy source.
gas
FuelType
A51Waste heat and cold
unspecified Unspecified Waste heat and cold energy source.
FuelType
A52Waste heat and cold
By-product in industrial installation Waste heat and cold from by-product in industrial installation energy source.
FuelType
A53Waste heat and cold
By-product in power generation Waste heat and cold from by-product in power generation energy source.
FuelType
A54Waste heat and cold
By-product in tertiary sector Waste heat and cold from by-product in tertiary sector energy source.
FuelType

HVDCModeType

2 codes
A01Setpoint schedule
The code for the "power setpoint" mode of operation of the HVDC link.
HVDCModeType
A02Proportional external
signal The code for the "Proportional external signal" mode of operation of the HVDC link.
HVDCModeType

IndicatorType

1 codes
YESA positive indication.
IndicatorType

Document Types

149 codes
A01Balance responsible
schedule A schedule which has been prepared by a balance responsible party providing planned schedule information.
Document Types
A02Allocated capacity
schedule A schedule which has been prepared by a capacity allocator providing allocated capacity.
Document Types
A03Balance area schedule A schedule that provides the planned schedule information for a balance area.
Document Types
A04System Operator area
schedule A compilation of all external schedules concerning two System Operator areas or a connector concerning two System Operator of all balance responsible parties.
Document Types
A05Control block area
schedule A compilation of all the exchange programs of all control areas for one control block with all neighbouring control areas of a neighbouring control block.
Document Types
A06Coordination center
area schedule A compilation of the exchange programs of all exchange blocks divided into UCTE south and north.
Document Types
A07Intermediate
confirmation report An intermediate confirmation report that may be produced between final cutoffs.
Document Types
A08Final confirmation
report A final confirmation report that is produced after a final cutoff.
Document Types
A09Finalised schedule
A compilation of a set of schedules that have been finalized after a given cutoff.
Document Types
A10Regulation data report
A compilation of the time series employed on a given day to ensure the balance of the system.
Document Types
A11Aggregated energy
data report A compilation of the time series of all the meter readings or their equivalent for a given period.
Document Types
A12Imbalance report
The report containing the complete situation of a given period for a party and including the schedules, regulation data and actual or calculated readings.
Document Types
A13Interconnection
Capacity Document for cross-border capacity exchanges.
Document Types
A14Resource Provider
Resource Schedule A document providing the schedules for resource objects submitted by a resource provider.
Document Types
A15Acquiring System
Operator Reserve Schedule A document providing reserve purchases submitted by an Acquiring System Operator.
Document Types
A16Anomaly Report
A document providing anomaly information for the receiving party to correct.
Document Types
A17Acknowledgement
Document A document providing acknowledgement information.
Document Types
A18Confirmation report
A document providing confirmation information.
Document Types
A19Capacity for Resale
A document providing information about capacity for resale.
Document Types
A20Approved Capacity
Transfer A document to approve a capacity transfer. – Page 36 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Document Types
A21Capacity transfer
notification A document notifying a capacity transfer.
Document Types
A22Transmission rights
portfolio A document providing the portfolio of the transmission capacity rights of a market participant.
Document Types
A23Allocations
A document providing the capacity allocations for a border.
Document Types
A24Bid document
A document providing bid information.
Document Types
A25Allocation result
document A document providing the allocation results of an auction.
Document Types
A26Capacity document
A document providing capacity information.
Document Types
A27Rights document
A document providing transmission capacity rights information.
Document Types
A28Generation availability
schedule This document contains information related to energy availability.
Document Types
A30Cross border schedule This document contains the cross border schedules for all the borders of a given
country where energy is exchanged.
Document Types
A31Agreed capacity
The capacity agreed between parties.
Document Types
A32Proposed capacity
The capacity proposed for agreement between parties.
Document Types
A33System vertical load
The sum of all flows out of the transmission grid via directly connected transformers and lines to distribution grids and end consumers as known by the System Operator.
Document Types
A34Escalation document
A document which requesting the escalation of a situation.
Document Types
A35Trouble shooting
document A document providing trouble shooting information for the resolution of a problem.
Document Types
A36Deactivation document A document providing deactivation information.
Document Types
A37Reserve tender
document The document that is used for the tendering for reserves within the ERRP process.
Document Types
A38Reserve Allocation
Result Document The document used to provide the results of a Reserve auction.
Document Types
A39SATCR activation
The document is used to provide the activation of reserves through the SATCR process.
Document Types
A40DATCR activation
The document is used to provide the activation of reserves through the DATCR process.
Document Types
A41Activation response
The document is used to provide a response to a request to activate reserves.
Document Types
A42Tender reduction
The document is used to provide information concerning the reduction of a previously submitted tender.
Document Types
A43MOL Document
The document is used to provide Merit Order List information.
Document Types
A44Price Document
The document is used to provide market price information.
Document Types
A45Measurement Value
Document The document is used to provide measurement information from measurement devices.
Document Types
A46SOAM Document
The document is used to provide system operator accounting data for matching.
Document Types
A47SOVA Document
The document is used to provide system operator validated accounting data.
Document Types
A48CCVA Document
The document is used to provide coordination center validated accounting data.
Document Types
A49Daily settlement
document The document is used to provide daily settlement information. – Page 37 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Document Types
A50Weekly settlement
document
Document Types
A51Capacity Auction
The document is used to provide capacity auction specification information. Specification Document
Document Types
A52Market Coupling
Results Document The document is used to provide the results of a market coupling auction.
Document Types
A53Outage publication
Document The document is used to provide the outage information for publication.
Document Types
A54Forced generation
outage Document A document providing information on forced generation outages.
Document Types
A55Summarised Market
Schedule A compilation of all external schedules concerning two Market Balance Areas of all balance responsible parties.
Document Types
A56Compensation Program A schedule that provides the schedule information for the compensation of
Schedule unintended deviation.
Document Types
A57Load Frequency
Control Program Schedule
Document Types
A58Timeframe Independent A compilation of all external Timeframe Independent Schedules concerning two
Schedule System Operators.
Document Types
A59Information request
Document Types
A60status request for a
A status request concerning the position of an object independently of any ongoing position independently processes. from a specific process
Document Types
A61Estimated Net Transfer The estimated net transfer capacity for a given border.
Capacity
Document Types
A62Compensation rights
The capacity rights that have been allocated as compensation.
Document Types
A63Redispatch notice
A notice to confirm the actions agreed between System Operators to resolve a congestion situation through redispatch.
Document Types
A64Tender reduction
response A response to a tender reduction request that provides corrections to the initial document.
Document Types
A65System total load
Total load', including losses without power used for energy storage, is equal to generation deducted with exports, added with imports and deducted with power used for energy storage.
Document Types
A66Final MOL
A document providing the information concerning the situation of the MOL at the end of an activation period.
Document Types
A67Resource Provider
A document providing the schedules for production/consumption for resource Schedule for objects submitted by a resource provider. production/consumption
Document Types
A68Installed generation per A document providing the installed generation per generation type.
type
Document Types
A69Wind and solar forecast A document providing the forecast of wind and solar generation.
Document Types
A70Load forecast margin
A document providing the load forecast margin for a period.
Document Types
A71Generation forecast
A document providing the generation forecast for a period.
Document Types
A72Reservoir filling
information A document providing information concerning the filling of reservoirs. The document is used to provide weekly settlement information. A schedule that provides the schedule information for the Load Frequency Control Program of a Control Area or a Control Block. An information request being made concerning some specific information. – Page 38 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Document Types
A73Actual generation
A document providing the actual generation for a period.
Document Types
A74Wind and solar
generation A document providing the generation of wind and solar energy for a period.
Document Types
A75Actual generation per
type A document providing the actual generation per generation type for a period.
Document Types
A76Load unavailability
A document providing the unavailability of units providing load on the network.
Document Types
A77Production
unavailability A document providing the unavailability of production units providing energy to the network.
Document Types
A78Transmission
unavailability A document providing the unavailability of transmission capacity on the network.
Document Types
A79Offshore grid
infrastructure unavailability A document providing the unavailability of an offshore grid infrastructure to the network.
Document Types
A80Generation
unavailability A document providing the unavailability of generation units providing energy to the network.
Document Types
A81Contracted reserves
A document providing the reserves contracted for a period.
Document Types
A82Accepted offers
A document providing the offers of reserves that have been accepted for a period.
Document Types
A83Activated balancing
quantities A document providing the quantities of reserves that have been activated for balancing.
Document Types
A84Activated balancing
prices A document providing the prices of the reserves that have been activated for balancing.
Document Types
A85Imbalance prices
A document providing the prices of reserves due to imbalance for a period.
Document Types
A86Imbalance volume
A document providing the volume of the imbalance for a period.
Document Types
A87Financial situation
A document providing the financial situation for reserves.
Document Types
A88Cross border balancing A document providing the cross border balancing requirements for a period.
Document Types
A89Contracted reserve
prices A document providing the price of reserves contracted for a period.
Document Types
A90Interconnection
network expansion A document providing information on the expansion of the interconnection network.
Document Types
A91Counter trade notice
A document providing information on counter trades for a period.
Document Types
A92Congestion costs
A document providing the cost of congestion for a period.
Document Types
A93DC link capacity
A document providing the DC links for a period.
Document Types
A94Non EU allocations
A document providing allocations made to non EU member states.
Document Types
A95Configuration document A document providing configuration information.
Document Types
A96Redispatch activation
document A document enabling the activation of a redispatch notice.
Document Types
A97Detailed activation
history document A document enabling a detailed history of activations.
Document Types
A98Aggregated activation
history document A document enabling an aggregated history of activations.
Document Types
A99HVDC Link constraints A document providing the information concerning the maximum and minimum active
power flow through each link can limited. – Page 39 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Document Types
B01HVDC Configuration
A document providing the information concerning the power set point. The mode in which the HVDC is managed.
Document Types
B02HVDC Schedule
A document providing the information for operating DC links.
Document Types
B03EIC code request
A document providing the information requesting a new EIC code.
Document Types
B04EIC code information
A document providing EIC information in a central registry exchange or information to an EIC participant.
Document Types
B05EIC code publication
A document providing EIC publication information in a web site publication of a limited set of information.
Document Types
B06Critical network
element determination A document providing all the elements necessary for the capacity coordinator to determine the transfer capacity and the associated critical network elements.
Document Types
B07Critical network
element publication A document providing all the elements necessary for the market information aggregator and TSOs to know the critical network elements which limit the transfer capacity.
Document Types
B08Flow based domain
A document providing the capacity domain and its limits available for the TSO.
Document Types
B09Flow based domain
publication A document providing the capacity domain and its limits available for the market.
Document Types
B10Flow based domain
market impact publication A document providing the capacity domain and its impacts on the market to be published.
Document Types
B11Anonymized flow based A document providing all the relevant flow based parameters in case of flow based
parameters publication capacity allocation.
Document Types
B12Critical network
A document providing the critical network elements and its impacts on the market to element market impact be published. publication
Document Types
B13Weather document
An estimation or prediction in advance of the weather by analysis of meteorological data and the results of what actually happened with the weather.
Document Types
B14Energy prognosis
document A document to provide the prognosis of energy production/load for a given period.
Document Types
B15Network constraint
document A document providing the network constraint situations used for the load flow studies. A network constraint situation includes contingencies, monitored elements and remedial actions.
Document Types
B16Aggregated netted
external market schedule document A document used to report aggregated netted external market schedules for a given border.
Document Types
B17Aggregated netted
A document used to report aggregated netted external TSO schedules for a given external TSO schedule border. document
Document Types
B18Reporting status
market document A document used to report the status of aggregated netted external market schedules, aggregated netted external TSO schedules and compensation program schedules on a given border.
Document Types
B19Reporting information
market document A document used to report the information concerning aggregated netted external schedules, aggregated netted external market schedules, aggregated netted external TSO schedules, compensation program schedules, netted area position schedules and netted area AC position schedules to an interested party.
Document Types
B20Status request for a
reporting information market document A document requesting the provision of a reporting information document. – Page 40 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Document Types
B21Reserve need
document Used by a TSO to send its reserve needs.
Document Types
B22Generation and load
shift keys document A document providing the values of the generation and load shift keys to be used on network model.
Document Types
B23Offers to be activated
A document containing the outcome of the process, with the list of offers that are to be activated by the TSO concerned and the results for its reserve needs.
Document Types
B24Clearing price
A document containing the outcome of the process, with the clearing prices for a period.
Document Types
B25Security analysis report A document providing a report on a performed security analysis.
Document Types
B26Aggregated netted
external schedule document
Document Types
B27External TSO schedule A document used to report external TSO schedules for a given border or
interconnector.
Document Types
B28Move of scheduled
production A document indication a move of scheduled production.
Document Types
B29PS&LC results
document A document providing Pole Splitting & Loss Calculation results.
Document Types
B30Notification data market A document used to notify data to any information receiver.
document
Document Types
B31Additional Constraint
document A document describing additional constraints for a capacity calculation process.
Document Types
B32Operational state
document A document used for exchanging operational states for grid assets.
Document Types
B33Published offered
capacity A document providing the most recent values of offered capacity.
Document Types
B34Market result document Published prices and volumes
Document Types
B35Area Configuration
document A document containing the definition of areas.
Document Types
B36Area Composition
document A document containing the relations between areas, i.e which Metering Grid Areas a Bidding Zone composed of.
Document Types
B37Connected Areas
document A document containing which other areas an area is connected to i.e. which Metering Grid Areas a Metering Grid Area is connected to.
Document Types
B38Settlement document
A document providing settlement information.
Document Types
B39Imbalance prognosis
document A document to provide the prognosis of energy imbalances for a given period.
Document Types
B40Complete set of bids
Submission of complete set of bids. If there are existing bids, they should be replaced.
Document Types
B41Merged MOL notice
A notice providing information on the MOL merging process.
Document Types
B42K-factor document
A document providing K-factor values.
Document Types
B43Settlement coordination A document providing settlement information for coordination between different
document parties.
Document Types
B44Financial settlement
document A document used to report aggregated netted external schedules for a given border. A document providing financial settlement information. – Page 41 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Document Types
B45Bid availability
document A document providing the detailed reasons for changing the availability or volume of a bid.
Document Types
B46Resource capacity unit A document providing information about resource capacity units.
document
Document Types
B47Other market
information A document providing other market information.
Document Types
B48Permission document
A document that contains detailed information about permissions.
Document Types
B49Requested capacity
A document providing requested capacity (e.g. ATC, CZCL) value.
Document Types
B50Voltage control
activation document A document providing the number of generating units to activate for voltage control, by means of their operation in synchronous condenser mode.
Document Types
B51Transmission inventory A document providing a transmission inventory.
document
Document Types

Market Product Types

11 codes
A01Standard balancing
product A harmonised balancing product defined by all TSOs for the exchange of balancing services.
Market Product Types
A02Specific balancing
product A product different from a standard product.
Market Product Types
A03Product from
From the EBGL Article 2 (19), means an iterative process that uses at least integrated scheduling integrated scheduling process bids that contain commercial data, complex technical process data of individual power generating facilities or demand facilities and explicitly includes the start-up characteristics, the latest control area adequacy analysis and the operational security limits as an input to the process.
Market Product Types
A04Local balancing
product A balancing product that is neither standard nor specific. This type may be applicable only in the interim period until standard and specific products have been defined within the given scheduling area.
Market Product Types
A05Standard mFRR
product eligible for scheduled activation Standard mFRR product eligible for scheduled activation.
Market Product Types
A06Standard mFRR
product eligible for direct activation Standard mFRR product eligible for direct activation.
Market Product Types
A07Standard mFRR
product eligible for direct and scheduled activation Standard mFRR product eligible for direct as well as scheduled activation.
Market Product Types
A08Market wide resource This is a market-wide resource capacity mechanism where all resource capacity
capacity mechanism required to ensure security of supply receives payment. These mechanisms are open for participation to all capacity resources contributing to adequacy. – Page 42 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Market Product Types
A09Strategic reserve
resource capacity mechanism This is a market resource capacity mechanism that is kept outside of the electricity market and only used if the market participants do not offer enough generation to meet short-term demand.
Market Product Types
A10Other resource
capacity mechanism This is any other kind of market resource capacity mechanism.
Market Product Types
A11Fast activation
product The fast activation product shall be considered as a fall -back solution for situations where coordination with all parties is no longer possible due to insufficient time and the regular product could not be properly applied.
Market Product Types

ObjectAggregationType

15 codes
A01Area
The object being described concerns an area.
ObjectAggregationType
A02Metering point
The object being described concerns a metering point.
ObjectAggregationType
A03Party
The object being described concerns a party.
ObjectAggregationType
A04Agreement
Identification The object being described concerns an agreement identification.
ObjectAggregationType
A05Accounting point
The object being described concerns an accounting point.
ObjectAggregationType
A06Resource Object
The object being described concerns a resource object.
ObjectAggregationType
A07Tieline
The object being described concerns a tieline.
ObjectAggregationType
A08Resource type
The object being described concerns a resource type.
ObjectAggregationType
A09DC link
The object being described concerns a DC link.
ObjectAggregationType
A10AC link
The object being described concerns an AC link.
ObjectAggregationType
A11Merchant line
The object being described concerns a merchant line.
ObjectAggregationType
A12Bidding zone
The largest geographical area within which market participants are able to exchange energy without capacity allocation.
ObjectAggregationType
A13Virtual bidding zone
A non-geographical bidding zone to be able to apply extra constraints to Bidding Zones.
ObjectAggregationType
A14Metering grid area
A physical area where consumption, production and exchange can be measured. It is delimited by the placement of meters for continuous measurement for input to, and withdrawal from the area.
ObjectAggregationType
A15Scheduling area
An area within which the TSOs' obligations regarding scheduling apply due to operational or organisational needs.
ObjectAggregationType

PaymentTermsType

2 codes
A01Pay as bid
The amount to be paid shall correspond to the amount bid.
PaymentTermsType
A02Pay as cleared
The amount to be paid shall correspond to the amount calculated for clearing.
PaymentTermsType

PriceCategoryType

7 codes
A01Category 1
A category one price calculation is to be applied.
PriceCategoryType
A02Category 2
A category two price calculation is to be applied.
PriceCategoryType
A03Category 3
A category three price calculation is to be applied.
PriceCategoryType
A04Excess balance
The category concerns excess balance.
PriceCategoryType
A05Insufficient balance
A category concerns insufficient balance.
PriceCategoryType
A06Average bid price
The average bid price for a given product.
PriceCategoryType
A07Single marginal bid
price The downwards activated bid price or the upwards activated bid price for activated balancing reserves.
PriceCategoryType

PriceComponentType

2 codes
A01Scarcity
A scarcity component to be used in nationally defined scarcity situations.
PriceComponentType
A02Incentive
An incentive component to be used to fulfil nationally defined boundary conditions.
PriceComponentType

PriceDirectionType

1 codes
A01Expenditure.
Expenditure, i.e. the Impacted Area System Operator pays to the internal Market Parties.
PriceDirectionType

Process Types

74 codes
A01Day ahead
The information provided concerns a day ahead process.
Process Types
A02Intra day incremental The information provided concerns an intra day schedule.
Process Types
A03Inter-area transit
The information provided concerns an inter area transit schedule. The rules governing this process are market dependent
Process Types
A04System operation
closure The information provided concerns the closure of a given period of both scheduled and regulation information.
Process Types
A05Metered data
aggregation The information provided concerns the aggregation process of metered information.
Process Types
A06Imbalance settlement The information provided concerns the imbalance settlement for a given period for a
balance responsible party or parties.
Process Types
A07Capacity allocation
Process Types
A08Central reconciliation The process carried out to finalise the imbalance settlement based on actual metered
values against provisional values from profiled metering points.
Process Types
A09Released capacity
allocation The process concerns the notification of capacity rights that are being released.
Process Types
A10Proposed capacity
allocation The process concerns the proposed capacity to be allocated for a given border.
Process Types
A11Agreed capacity
allocation The process concerns the capacity that has been agreed for allocation for a border.
Process Types
A12Long term
The process concerns scheduling all schedules except daily and intraday contracts.
Process Types
A13Post scheduling
adjustment The process concerns the adjustments made to previous schedules after the period of execution.
Process Types
A14Forecast
The data contained in the document are to be handled in short, medium, long term forecasting process. The information provided concerns the capacity allocation process. – Page 45 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Process Types
A15Capacity
determination The process of determining the capacity for use.
Process Types
A16Realised
The process for the treatment of realised data as opposed to forecast data.
Process Types
A17Schedule day
The process concerns the day ahead, intraday and eventually ex -post scheduling in a single document. The schedule will be transferred within the total position including historic information.
Process Types
A18Intraday total
This process concerns an intraday schedule which contains the accumulated day ahead and intraday current position.
Process Types
A19Intraday accumulated This process concerns a single intraday schedule process where only intraday
evolutions occur through version changes.
Process Types
A20SOMA process
System Operator meter alignment process.
Process Types
A21SOVM process
System Operator validated measurement process.
Process Types
A22RGCE accounting
process The document provides ENTSO-E Regional Group Continental Europe accounting process information.
Process Types
A23CCSR RGCE
Settlement The process concerns the control center settlement report for the whole of the ENTSO-E Regional Group Continental Europe.
Process Types
A24CBSR Settlement
The process concerns the control block settlement report.
Process Types
A25CASR Settlement
The process concerns the control area settlement report.
Process Types
A26Outage information
The process concerns TSO publication of outages on its power system.
Process Types
A27Reserve resource
process The process being described is for general reserve resources.
Process Types
A28Primary reserve
process The process being described is for primary reserves.
Process Types
A29Secondary reserve
process The process being described is for secondary reserves.
Process Types
A30Tertiary reserve
process The process being described is for tertiary reserves.
Process Types
A31Week ahead
The process being described is for the week ahead.
Process Types
A32Month ahead
The process being described is for the month ahead.
Process Types
A33Year ahead
The process being described is for the year ahead.
Process Types
A34Contracted
The process being described is for contracted information.
Process Types
A35Network information
The process being described is for network information.
Process Types
A36Creation
The process being described is for the creation of information.
Process Types
A37Modification
The process being described is for the modification of information.
Process Types
A38Deactivation process
The process being described is for deactivation of information.
Process Types
A39Synchronisation
process The process being described is for the synchronisation of information.
Process Types
A40Intraday process
The process being described is for intraday process.
Process Types
A41Redispatch process
The process being described is for redispatch activation.
Process Types
A42Activation history
process The process being described is for the provision of an activation history. – Page 46 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
Process Types
A43Flow based domain
constraint day-ahead The information provided concerns the flow-based process in day ahead.
Process Types
A44Flow based domain
constraint intraday The information provided concerns the flow-based process in intraday.
Process Types
A45Two days ahead
Two days ahead.
Process Types
A46Replacement reserve A process being described is for replacement reserves (RR) to restore or support the
required level of frequency restoration reserves.
Process Types
A47Manual frequency
restoration reserve A process being described is for manual frequency restoration reserves (mFRR).
Process Types
A48Day-ahead capacity
determination The process run at the day-ahead timeframe to determine the capacity for use.
Process Types
A49Intraday capacity
determination The process run at the intraday timeframe to determine the capacity for use.
Process Types
A50Long term capacity
determination The process run at the long term timeframe to determine the capacity for use.
Process Types
A51Automatic frequency
restoration reserve A process being described is for automatic frequency restoration reserves (aFRR).
Process Types
A52Frequency
containment reserve A process being described is for frequency containment reserves (FCR).
Process Types
A53Common Grid Model
(CGM) merging process The process for merging individual grid models to form the common grid model.
Process Types
A54Coordinated security
analysis The process being described is used for coordinated security analysis.
Process Types
A55Exchange of master
data A process for exchanging master data.
Process Types
A56Frequency restoration The process being described is for general frequency restoration reserve.
reserve
Process Types
A57FSKAR settlement
The information provided concerns the Financial Settlement of K?f, ACE and ramping period settlement for a given period.
Process Types
A58mFRR capacity
market Processes related to the Reserve option market to assure that there are enough available reserves for the manual FRR market.
Process Types
A59Internal trade
reporting The process related to internal trade reporting.
Process Types
A60Scheduled activation
mFRR mFRR being subject to scheduled activation.
Process Types
A61Direct activation
mFRR mFRR being subject to direct activation.
Process Types
A62Registration
A process related to the registration and management of object information.
Process Types
A63Imbalance Netting
The process described is for imbalance netting.
Process Types
A64Criteria application for The process describes criteria application for instantaneous frequency.
instantaneous frequency
Process Types
A65Criteria application for The process describes criteria application for frequency restoration.
frequency restoration – Page 47 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Process Types
A66Cost sharing
The process describes the cost sharing process for costly remedial actions.
Process Types
A67Central selection
aFRR aFRR subject to central selection of bids for activation.
Process Types
A68Local selection aFRR aFRR subject to local selection of bids for activation.
Process Types
A69Common grid model
alignment The process for aligning bidding zone net positions.
Process Types
A70Pan-European
verification function The process for verifying bidding zone net positions.
Process Types
A71Outage planning
coordination The process being described is used for outage planning coordination.
Process Types
A72Short term adequacy
The process being described is used for short term adequacy calculations.
Process Types
A73Coordinated capacity The process being described is used for coordinated capacity calculation.
calculation
Process Types
A74Access to metered
data Access to meter readings of electricity consumption from or electricity feed into the grid.
Process Types

QualityType

5 codes
A01Adjusted
The contents of the object have been adjusted.
QualityType
A02Not available
The contents of the object are not available.
QualityType
A03Estimated
The contents of the object are estimated. The code is typically used when measured values are missing and an estimate is made based on historical data.
QualityType
A04As provided
The contents of the object are as provided.
QualityType
A05Incomplete
The contents of the object are calculated based on incomplete data.
QualityType

Reason Codes

160 codes
A01Message fully
accepted
Reason Codes
A02Message fully rejected No part of the message has been accepted for application processing, e.g. Global
position incomplete.
Reason Codes
A03Message contains
errors at the time series level
Reason Codes
A04Time interval incorrect The schedule time interval is not within the contractual agreement or the period does
not agree with the schedule time interval.
Reason Codes
A05Sender without valid
contract The sender has no current valid contract with the TSO. The message consequently will be fully rejected.
Reason Codes
A06Schedule accepted
The schedule of the recipient as presented has been completely accepted.
Reason Codes
A07Schedule partially
accepted The schedule of the recipient as presented has been partially accepted. It is necessary to look at the time series level to determine the changes (time series rejected, modified, etc.).
Reason Codes
A08Schedule rejected
The schedule of the recipient as presented has been totally rejected. The cause could be the non presentation of a counter part for the involved trades.
Reason Codes
A09Time series not
matching Time series mismatches.
Reason Codes
A10Credit limit exceeded The contractual credit limit has been exceeded and as such the message has been
rejected.
Reason Codes
A20Time series fully
rejected
Reason Codes
A21Time series accepted The time series has been accepted but some time interval quantities have been
with specific time rectified or zeroed out. interval errors
Reason Codes
A22In party/Out party
invalid There is no contract for the parties indicated or the rules for cross border nominations are not being respected. The time series has been rejected.
Reason Codes
A23Area invalid
The area is unknown or not allowed. The time series has been rejected.
Reason Codes
A24This code is no longer applicable.
Reason Codes
A25This code is no longer applicable.
Reason Codes
A26Default time series
applied The time series has been rejected and replaced with a default time series profile. This reason code may not be used in conjunction with A30.
Reason Codes
A27Cross border capacity The cross border capacity has been exceeded. The time series has been rejected or
exceeded adjusted.
Reason Codes
A28Counterpart time
series missing The message has been fully accepted for application processing. Part of the message contents, i.e. certain time series, has been accepted for application processing. It is necessary to look at the time series level to determine the time series that have been rejected. The time series is excluded from the global position. The time series has been fully rejected. In the case of a confirmation report, this reason code is used in conjunction with either A26 or A30. This provides an indication that the time series has not got a counterpart time series. In the case of an Intermediate Confirmation Report this is advising the recipient that the time series may be rejected at nomination closure if the counterpart time se ries is not received. In the case of a Final Confirmation Report this is informing the recipient that the time series has been rejected because the counterpart time series has not been forthcoming. – Page 49 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Reason Codes
A29Counterpart time
series quantity differences The time series has been rejected as it does not match that of the counterpart who is considered by market rules to be correct.
Reason Codes
A30Imposed Time series
from nominated party's time series (party identified in reason text) The nominated party's time series has replaced the current time series. This reason code may not be used in conjunction with A26.
Reason Codes
A41Resolution
inconsistency The resolution is not coherent with the time interval, or resolution not valid.
Reason Codes
A42Quantity
inconsistency The quantity is not coherent. For example a time period with the same version number but different quantities or an non permitted number of digits after the decimal point, etc.
Reason Codes
A43Quantity increased
The quantity has been increased in order to satisfy minimum constraints.
Reason Codes
A44Quantity decreased
The quantity has been decreased in order to satisfy congestion constraints.
Reason Codes
A45Default quantity
applied The default quantity has been applied as the current quantity does not satisfy contractual obligations.
Reason Codes
A46Quantities must not
be signed values The quantity proposed is illegal since signed values are only permitted in specific circumstances.
Reason Codes
A47This code is no longer applicable.
Reason Codes
A48Modification reason
In an intraday transmission, the reason for the modification is as follows (in the reason text).
Reason Codes
A49Position inconsistency A position is missing or too many.
Reason Codes
A50Senders time series
version conflict
Reason Codes
A51Message identification The message identification is already in the receiving system. Or a higher version
or version conflict already exists. Message rejected.
Reason Codes
A52Time series missing
from new version of message A time series is not contained in a new version of the message. Message rejected.
Reason Codes
A53Receiving party
incorrect The receiving party is incorrect. Message rejected.
Reason Codes
A54Global position not in The message does not balance out to zero. Market rules might require that the
balance message is rejected.
Reason Codes
A55Time series
identification conflict The identification of the time series is duplicated or incorrect. Time series will be rejected.
Reason Codes
A56Corresponding Time
series not netted All corresponding time series must be netted. Time series rejected.
Reason Codes
A57Deadline limit
exceeded/Gate not open The deadline for receiving schedule messages has passed. Message or time series rejected.
Reason Codes
A58One to one
nomination inconsistency There is a one to one nomination inconstancy with the in/out parties or areas. Time series rejected.
Reason Codes
A59Not compliant to local The level in which this is identified is not in compliance with local market rules. The
market rules level in question has been rejected. There is an error in the sender time series version, i.e. it could be superior to the message version or is inconsistent with the existing data. The time series has been rejected. – Page 50 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
Reason Codes
A60Inter-area transit
schedule exceeds nominated schedule The inter-area transit schedule exceeds the nominated schedule for the same time interval. The inter-area transit schedule is rejected.
Reason Codes
A61Currency invalid
The currency is not in compliance with ISO 4217.
Reason Codes
A62Invalid business type
The business type does not belong to the valid set of business types for the process in question.
Reason Codes
A63Time Series modified The time series has been modified.
Reason Codes
A64Resource Object
Invalid The Resource Object defined in the document is not valid.
Reason Codes
A65Reserve object
Technical limits exceeded Reserve objects aggregated values are not within technical/prequalified limits
Reason Codes
A66Planned reserves do
not correspond with contractual data Planned reserves do not correspond with contractual data.
Reason Codes
A67Limit Data is not
available Limit Data is not available.
Reason Codes
A68Reserve Object not
qualified for reserve type Reserve Object is not qualified for reserve type.
Reason Codes
A69Mandatory attributes
missing Mandatory attributes missing.
Reason Codes
A70Curtailment
The capacity in question has been curtailed.
Reason Codes
A71Linked bid rejected
The bid in question has been rejected because an associated bid has been due to associated bid unsuccessful. unsuccessful
Reason Codes
A72Original bid divided to The original bid quantity has been divided to enable it to be accepted.
permit acceptance
Reason Codes
A73Bid accepted
The bid in question has been accepted.
Reason Codes
A74Auction Status
The information in the Reason Text provides auction status information.
Reason Codes
A75Right status
information The information in the Reason Text provides status information concerning the transmission rights in question.
Reason Codes
A76Agreement
identification inconsistency There is an inconsistency between the contract type and the agreement identification.
Reason Codes
A77Dependency matrix
not respected There is an inconsistency between the document contents and the dependency matrix.
Reason Codes
A78Sender identification
and/or role invalid The identification of the sender or the sender/role combination is invalid.
Reason Codes
A79Process type invalid
The process type does not figure in the list of valid process types for this document.
Reason Codes
A80Domain invalid
The domain does not figure in the list of valid domains for this document and process.
Reason Codes
A81Matching period
invalid The period is not within the expected limits.
Reason Codes
A82In/Out area
inconsistent with domain The in and out area does not figure within the domain specified. – Page 51 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Reason Codes
A83Disagree with
matching results
Reason Codes
A84Confirmation ignored The report has been ignored since a higher version has been received.
due to higher version already received
Reason Codes
A85Confirmation without
adjustment (time series have been matched without change) The report has been successfully matched without any changes.
Reason Codes
A86Confirmation with
adjustment (time series have been modified) The report has been matched but required adjustment.
Reason Codes
A87For action (only in
The report in question is only for action in an intermediate stage. intermediate confirmation - time series need mutual agreement and action)
Reason Codes
A88Time series matched
The time series has been successfully matched.
Reason Codes
A89Time series ignored
(note: this can only apply to time series that are set to zero see matching principles) The time series has been ignored and not matched since it does not figure in a counterparty transmission. All are correctly equal to zero.
Reason Codes
A90Modification proposal The document is a proposal for change before finalization.
(intermediate confirmation)
Reason Codes
A91Expected document
not received
Reason Codes
A92Not possible to send The document that is due cannot be transmitted within the required timeframe. An
document on time, but estimated time of transmission is provided. estimated delivery time is provided
Reason Codes
A93Not possible to send
document on time, and furthermore no expected time of return to normal situation The document that is due cannot be transmitted within the required timeframe. The time of transmission of the document is unknown.
Reason Codes
A94Document cannot be
processed by receiving system The receiving system cannot process that document in question.
Reason Codes
A95Complementary
information Additional text is provided in order to further explain a condition, for example to provide details of an outage.
Reason Codes
A96Technical constraint
A technical constraint has been applied.
Reason Codes
A97Force majeure
curtailment Curtailment due to Force Majeure. A code that enables the identification of the curtailment reason for settlement purposes.
Reason Codes
A98Network security
curtailment Curtailment due to network security reasons A code that enables the identification of the curtailment reason for settlement purposes.
Reason Codes
A99Auction cancelled
The auction has been cancelled. The matching results provided are not consistent. The document that is expected has not been received within the expected timeframe. – Page 52 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Reason Codes
B01Incomplete document The document is incomplete and cannot be processed.
Reason Codes
B02Accounting Point (tie- The document is incomplete as a time series for an accounting point is missing.
line) Time Series missing
Reason Codes
B03Meter data Time
series missing The document is incomplete as a time series for meter data is missing.
Reason Codes
B04Estimated values not
allowed in first transmission The document is in its initial form and estimated values are not allowed.
Reason Codes
B05No quantity values
allowed for a quality that is not available No quantity values are allowed for a quality that is not available.
Reason Codes
B06Time series accepted Time series accepted.
Reason Codes
B07Auction without bids
being entered
Reason Codes
B08Data not yet available It is not possible to perform the necessary action since the required data for this
action is not yet available.
Reason Codes
B09Bid not accepted
Reason Codes
B10Initiator area problem The problem concerns the initiator area.
Reason Codes
B11Cooperating area
problem
Reason Codes
B12Communication status The status within the system indicates that the communication capability is currently
currently active active.
Reason Codes
B13Communication status The status within the system indicates that the communication capability is currently
currently inactive inactive.
Reason Codes
B14Communication status The status within the system indicates that the communication capability is currently
currently restricted restricted.
Reason Codes
B15Problem associated
with both areas
Reason Codes
B16Tender unavailable in A tender that has been requested is no longer available in the MOL.
MOL list
Reason Codes
B17Price based on
The price is based on a preliminary exchange rate. preliminary exchange rate
Reason Codes
B18Failure
A failure has occurred.
Reason Codes
B19Foreseen
maintenance Maintenance is foreseen.
Reason Codes
B20Shutdown
A shutdown has occurred.
Reason Codes
B21Official exchange rate The official exchange rate has been approved.
approved
Reason Codes
B22System regulation
Reason Codes
B23Frequency regulation The information provided regards a regulation for frequency purposes.
Reason Codes
B24Load flow overload
The auction has terminated without any bids being submitted. The ReasonText may provide the identification of the auction in question. The bid in question has not been accepted. The problem concerns the cooperating area. The problem concerns both areas. The information provided regards a regulation for system purposes. Situation in the grid, where loading of a certain grid element, e.g. overhead line, is above defined technical limits. – Page 53 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Reason Codes
B25Voltage level
adjustment A TSO activity to maintain an acceptable voltage profile throughout the network. This is achieved by balancing of the respective reactive power requirements of the network and the customers.
Reason Codes
B26Emergency situation
curtailment Curtailment due to emergency situation. A code that enables the identification of the curtailment reason for settlement purposes.
Reason Codes
B27Calculation process
failed The calculation has not been performed.
Reason Codes
B28No capacity constraint The market position is such as no capacity constraint is applied to limit the cross
impact on the market border exchanges.
Reason Codes
B29Special Condition
Special condition need to be fulfilled.
Reason Codes
B30Unverified
Missing or not validated data.
Reason Codes
B31Verified
Data has successfully passed the verification process.
Reason Codes
B32CGM inconsistency
Describes an element which was not found in the CGM.
Reason Codes
B33Network dictionary
inconsistency Describes an element which was not found in the network dictionary.
Reason Codes
B34Capacity reduced by
Reason Codes
TSODescribes a capacity that was reduced by a TSO.
Reason Codes
B35Overload
Describes an N-k or N state overload.
Reason Codes
B36GLSK limitation
Describes a situation in which there is not enough power adjustment in the GLSK file to cover the capacity.
Reason Codes
B37Voltage constraint
Describes an N-k or N state voltage violation.
Reason Codes
B38Angle constraint
Describes an N-k or N state angle violation.
Reason Codes
B39Stability
Describes a situation in which the dynamic behaviour of the network violated.
Reason Codes
B40Loadflow divergence
Describes a network situation in which the provided capacity values are part of a load flow divergence situation.
Reason Codes
B41Exclusion for SoS
reasons This is the adjustment applied to the capacity of a branch to have a minimum RAM (Remaining Available Margin) available for commercial exchanges.
Reason Codes
B42Constraint by the
market A constraint due to market restrictions.
Reason Codes
B43Ordinary
The contingency is ordinary (methodology for coordinating operational security analysis, article 6).
Reason Codes
B44Exceptional
The contingency is exceptional (methodology for coordinating operational security analysis, article 6).
Reason Codes
B45Out of range
The contingency is out of range (methodology for coordinating operational security analysis, article 6).
Reason Codes
B46Internal congestion
A temporary congestion within a bidding zone or scheduling area.
Reason Codes
B47Operational security
constraints Operational security constraints identified by TSOs.
Reason Codes
B48Estimated value
Describes a situation where a calculation process has failed and extrapolated or interpolated values will be applied.
Reason Codes
B49Balancing
Activated for balancing purposes.
Reason Codes
B50Values shared
Values of this time series are also valid for counter -party.
Reason Codes
B51Outside price limits
The offered price is not within the valid limits. – Page 54 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
Reason Codes
B52Previous timeframe
data In case of processing issue, sent data are based on the previous timeframe.
Reason Codes
B53MOL merging
succesful The merging of the Merit Order List has been successfully processed.
Reason Codes
B54MOL merging failed
The merging of the Merit Order List has failed.
Reason Codes
B55Because of
redispatching Because of redispatching according to Article 2(26) of Commission Regulation (EU) 543/2013
Reason Codes
B56Because of
countertrading Because of countertrading according to Article 2(13) of Commission Regulation (EU) 543/2013
Reason Codes
B57Because of other
remedial action Not available because of any remedial action.
Reason Codes
B58Insufficiency of
reserves The reserve capacity is not sufficient.
Reason Codes
B59Unavailability of
The unit providing the reserve is subject to technical unavailability. reserve providing unit
Reason Codes
B60Unavailability of
automatic protection systems
Reason Codes
B61Physical cable or
Limitation due to physical cable or converter restrictions. converter restrictions
Reason Codes
B62Constraints in
controller systems Limitation due to constraints in controller systems.
Reason Codes
B63Adjusted because of
expected violation of operational security The capacity is adjusted because of an expected violation of operational security limits of physical transmission assets.
Reason Codes
B64Adjusted because
already considered remedial actions are assessed as not sufficient The capacity is adjusted because the remedial actions were assessed as not sufficient or ineffective to avoid the expected violation of operational security limit(s).
Reason Codes
B65Time series partially
accepted The time series is partially accepted.
Reason Codes
B66Demand fully netted
Demand was fully netted against other demand(s).
Reason Codes
B67Bid activated in same One or several bids were activated in the same direction within the same
direction uncongested area as the demand.
Reason Codes
B68Optimization in
progress
Reason Codes
B69Wrong energy market The given energy market timeframe is invalid or wrong.
timeframe
Reason Codes
B70Message partially
accepted The detailed transactions of the received document are partially accepted. It is necessary to look at the detailed (transaction) level to determine if the transaction is accepted, rejected etc.
Reason Codes
B71(Explicit) Permission
from the customer Based on the regulation (EU) 2016/679 (GDPR) Article 6, Lawfulness of processing: The data subject has given consent to the processing of his or her personal data for one or more specific purposes. Unavailability of tools to detect predetermined system conditions that have a high probability of causing unusual stress on the power system, for which pre -planned remedial action is considered necessary or for which automatic protective actions may be triggered such as special protection schemes or automatic load shedding. The activation optimisation framework is being executed. – Page 55 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
Reason Codes
B72In execution of a
contract with the customer (Execution of contract) Based on the regulation (EU) 2016/679 (GDPR) Article 6, Lawfulness of processing: Processing is necessary for the performance of a contract to which the data subject is party or in order to take steps at the request of the data subject prior to entering in to a contract.
Reason Codes
B73Legal obligations
Based on the regulation (EU) 2016/679 (GDPR) Article 6, Lawfulness of processing: Processing is necessary for compliance with a legal obligation to which the controller is subject.
Reason Codes
B74In protection of vital
interests of the customer Based on the regulation (EU) 2016/679 (GDPR) Article 6, Lawfulness of processing: Processing is necessary in order to protect the vital interests of the data subject or of another natural person.
Reason Codes
B75In order to perform a
duty of common (national) interest Based on the regulation (EU) 2016/679 (GDPR) Article 6, Lawfulness of processing: Processing is necessary for the performance of a task carried out in the public interest or in the exercise of official authority vested in the controller.
Reason Codes
B76Justified interest of
the dataprocessee Based on the regulation (EU) 2016/679 (GDPR) Article 6, Lawfulness of processing: Processing is necessary for the purposes of the legitimate interests pursued by the controller or by a third party, except where such interests are overridden by the interests or fundamental rights and freedoms of the data subject which require protection of personal data, in particular where the data subject is a child
Reason Codes
B77Fulfilment of purpose The purpose of the object or action has been fulfilled.
Reason Codes
B78Reach of end
timestamp The object or action has reached its end timestamp.
Reason Codes
B79Revocation
Revocation of the action or object.
Reason Codes

RightsType

5 codes
A01Use It Or Lose It
Any rights not nominated shall be lost.
RightsType
A02Use It Or Sell It
Any rights that are not nominated shall be sold.
RightsType
A03Allocation curtailment Rights acquired may be curtailed.
possible
RightsType
A04Nomination
curtailment possible Rights acquired may be curtailed at nomination.
RightsType
A05Resale possible
Acquired rights may be resold.
RightsType

RoleType

58 codes
A01Trade responsible
party Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A02Consumption
responsible party Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A03Combined power
exchange (not to be used) This role is no longer in the ENTSO-E Harmonised Role Model Document.
RoleType
A04System operator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A05Imbalance settlement Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
responsible
RoleType
A06Production
responsible party
RoleType
A07Transmission capacity Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
allocator
RoleType
A08Balance responsible
party Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A09Metered data
aggregator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A10Billing agent
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A11Market operator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A12Energy supplier
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A13Consumer
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A14Control area operator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A15Control block operator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A16Coordination centre
operator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A17Grid access provider
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A18Grid operator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A19Meter administrator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A20Party connected to
grid Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A21Producer
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A22Profile maintenance
party Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A23Meter operator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A24Metered data collector Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A25Metered data
responsible Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A26Metering point
administrator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. – Page 57 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
RoleType
A27Resource Provider
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A28Scheduling
coordinator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A29Capacity Trader
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A30Interconnection Trade Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
Responsible
RoleType
A31Nomination Validator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
RoleType
A32Market information
aggregator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. A party that collects information from different sources and assembles it to provide a summary of the market.
RoleType
A33Information receiver
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. A party, not necessarily a market participant, which receives information about the market.
RoleType
A34Reserve Allocator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. A party that informs the market of reserve requirements, receives tenders against the requirements and in compliance with the prequalification criteria, determines what tenders meet requirements and assigns tenders.
RoleType
A35MOL Responsible
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. A party that Informs the market of reserve requirements, receives tenders against the requirements and in compliance with the prequalification criteria, determines what tenders meet requirements and assigns tenders.
RoleType
A36Capacity Coordinator A party, acting on behalf of the SOs involved, responsible for establishing a
coordinated Offered Capacity and/or NTC and/or ATC between several Scheduling Areas.
RoleType
A37Reconciliation
Accountable Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. A party that is financially accountable for the reconciled volume of energy products for a profiled local metering point.
RoleType
A38Reconciliation
Responsible A party that is responsible for reconciling, within a metering grid area, the volumes used in the imbalance settlement process for profiled metering points and the actual metered quantities.
RoleType
A39Data provider
A party that is responsible for providing information to a central authority.
RoleType
A40Local Issuing Office
(LIO) A party that is responsible for operating a Local Issuing Office (LIO).
RoleType
A41Central Issuing Office A party that is responsible for operating a Central Issuing Office (CIO).
(CIO)
RoleType
A42EIC Participant
A party that participates in the EIC environment.
RoleType
A43Weather analyser
A party that analyses the current and forecast weather situation and establishes a prognosis of its impact on the renewable energy environment as well as the overall load.
RoleType
A44Regional Security
Coordinator (RSC) The RSC as defined in the System Operation guideline.
RoleType
A45Energy Service
Company (ESCO) A party offering energy-related services to the Party Connected to Grid, but not directly active in the energy value chain or the physical infrastructure itself. The ESCO may provide insight services as well as energy management services.
RoleType
A46Balancing Service
Provider A party with reserve-providing units or reserve-providing groups able to provide balancing services to LFC Operators.
RoleType
A47Energy trader
A party that is selling or buying energy. – Page 58 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description A party that is responsible for the Load Frequency Control of its LFC Area or LFC Block.
RoleType
A48LFC Operator
RoleType
A49Transmission System The Transmission System Operator (TSO) is responsible for the transport of
electricity on the extra high-voltage and high-voltage interconnected system. This is a Operator (TSO) market participant and not a role in Harmonised Role Model.
RoleType
A50Distribution System
Operator (DSO) Distribution System Operator (DSO) is responsible for transport of electricity on high voltage (optionally), medium-voltage and low-voltage distribution systems. This is a market participant and not a role in Harmonised Role Model.
RoleType
A51Resource Capacity
Mechanism Operator Resource capacity mechanism operator is the party responsible to operate the resource capacity mechanism in a member state. It can either be the TSO or an independent party.
RoleType
A52Resource aggregator
A party that aggregates resources for usage by a service provider for energy market services.
RoleType
A53Cost sharing
calculator A party responsible for the mapping of the costs between areas and parties.
RoleType
A54Settlement
responsible A party responsible for settling the costs.
RoleType
A55Coordinated Capacity Coordinated Capacity Calculator is the entity or entities with the task of calculating
Calculator transmission capacity, at regional level or above.
RoleType
A56Flexibility service
provider
RoleType
A57Data access provider A party responsible for facilitating access to data.
RoleType
A58Metered data
administrator A party responsible for storing and distributing validated measured data.
RoleType

StatusType

77 codes
A01Intermediate
The document is in a non finalized state.
StatusType
A02Final
The document is in a definitive state.
StatusType
A03Deactivated
The object being reported has been deactivated.
StatusType
A04Reactivated
The object being reported has been reactivated.
StatusType
A05Active
The object being reported is currently active.
StatusType
A06Available
The volumes (one or more) are available.
StatusType
A07Activated
The quantities in the time series have been activated. – Page 59 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
StatusType
A08In process
The quantities in the time series are in the process of activation (an activation request has been made).
StatusType
A09Cancelled
The tender indicated in the time series has been completely cancelled. In this case the resources are no longer available to all Acquiring System Operators
StatusType
A10Ordered
The quantities in the time series are to be activated.
StatusType
A11Unavailable
The volumes (one or more) are unavailable.
StatusType
A12RGCE agreed
The information has been agreed within the ENTSO-E Regional Group Continental Europe process.
StatusType
A13Withdrawn
The information or action has been withdrawn by the submitter.
StatusType
A14Creation
The action requested to be carried out is the creation of a new object.
StatusType
A15Update
The action requested to be carried out is the update an existing object.
StatusType
A16Deactivation
The action requested to be carried out is to deactivate an existing object.
StatusType
A17Reactivation
The action requested to be carried out is to reactivate a previously deactivated object.
StatusType
A18Preventive
The remedial action is applied to prevent an outage.
StatusType
A19Curative
The remedial action is applied after an outage has occurred, in order to maintain the operational security.
StatusType
A20Automatic
The remedial action being described is applied by an automation when an outage occurs.
StatusType
A21Open
The action being described consists of disconnecting the network element to the transmission network.
StatusType
A22Close
The action being described consists of connecting the network element to the transmission network.
StatusType
A23Stop
The action being described consists of stopping the production or consumption connected to a network element.
StatusType
A24Start
The action being described consists of starting the production or consumption connected to a network element.
StatusType
A25Relative
The quantity being described is a relative value to an initial state.
StatusType
A26Absolute
The quantity being described is an absolute value.
StatusType
A27Curative or preventive The remedial action can be applied to prevent an outage or after an outage has
occurred in order to maintain the operational security.
StatusType
A28Unshared bid
Used to indicate that the bid cannot be shared.
StatusType
A29Pre Processed
to be process
StatusType
A30Substituted
Substituted pre-processing data.
StatusType
A31Modified
Modified pre-processing data by RSC or CGMA platform.
StatusType
A32Result
Result
StatusType
A33Not satisfied
The need described in the time series cannot be satisfied.
StatusType
A34Rejected
The document rejected by one or more parties.
StatusType
A35Preliminary
Indicative information only for initial planning purposes.
StatusType
A36Planned
Is planned. – Page 60 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
StatusType
A37Confirmed
The status is confirmed.
StatusType
A38Shall Be Used
The object defined in the series shall be used.
StatusType
A39Could Be Used
The object defined in the series could be used.
StatusType
A40Proposed
The status of the information is proposed.
StatusType
A41Individual Network
Data The network data provided in the document or series concerns the the unique TSO area describes by the document or series.
StatusType
A42Common Network
Data The network data provided in the document or series concerns the whole area describes by the document or series.
StatusType
A43Setpoint schedule
The code for the power setpoint mode of operation of the HVDC link.
StatusType
A44Proportional external
signal The code for the proportional external signal mode of operation of the HVDC link.
StatusType
A45AC emulation
The code for the AC emulation mode of operation of the HVDC link.
StatusType
A46Importing element
An importing network element in which the flow measurement enters.
StatusType
A47Exporting element
An exporting network element from which the flow measurement comes out.
StatusType
A48To be optimized
Describes an element which needs to be optimized by an optimization process.
StatusType
A49To be monitored
Describes an element which needs to be monitored by an optimization process.
StatusType
A50To be included in
capacity calculation Describes an element which needs to be taken into account in a capacity calculation process.
StatusType
A51Relative to previous
point in time The quantity being described is a relative value to a previous point in time.
StatusType
A52For flow optimization
Describes an element which needs to be optimized by a flow optimization process.
StatusType
A53For voltage
optimization Describes an element which needs to be optimized by a voltage optimization process.
StatusType
A54Presolved
Describes an active constraint that limits the exchanges. It is part of the presolved domain.
StatusType
A55Not available if linked Bid not available if linked bid activated.
bid activated
StatusType
A56Not available if linked Bid not available if linked bid rejected.
bid rejected
StatusType
A57Not available for DA if Bid not available for direct activation if linked bid subject to direct activation.
linked bid subject to
StatusType
A58Not available for DA if Bid not available for direct activation if linked bid subject to scheduled activation.
linked bid subject to
StatusType
A59Not available if linked Bid not available if linked bid subject to scheduled activation.
bid subject to SA
StatusType
A60Not available if linked Bid not available if linked bid subject to direct activation.
bid subject to DA
StatusType
A61Primary market
A value is traded for the first time.
StatusType
A62Secondary market
A value is traded for the second or next times between two parties.
StatusType
A63Interesting
Describes an asset which is considered as interesting. – Page 61 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
StatusType
A64Relevant
Describes an asset which is considered as relevant.
StatusType
A65Conditionally
available Bid available as long as none of the conditions associated with the linked bids materialise.
StatusType
A66Conditionally
unavailable Bid unavailable as long as none of the conditions associated with the linked bids materialise.
StatusType
A67Available if linked bid Bid available if linked bid activated.
activated
StatusType
A68Available if linked bid Bid available if linked bid rejected.
rejected
StatusType
A69Available if linked bid Bid available if linked bid subject to scheduled activation.
subject to SA
StatusType
A70Available if linked bid Bid available if linked bid subject to direct activation.
subject to DA
StatusType
A71Available for DA if
linked bid subject to
StatusType
DABid available for direct activation if linked bid subject to direct activation.
StatusType
A72Available for DA if
linked bid subject to
StatusType
SABid available for direct activation if linked bid subject to scheduled activation.
StatusType
A73Delta
Describes a status representing a difference between two values.
StatusType
A74Validated
The object or action was validated.
StatusType
A75Invalid
The object or action was invalid.
StatusType

TarifTypeType

6 codes
A01Winter HT
Winter HT tariff.
TarifTypeType
A02Winter HHT
Winter HHT tariff.
TarifTypeType
A03Winter NT
Winter NT tariff.
TarifTypeType
A04Summer HT
Summer HT tariff.
TarifTypeType
A05Summer HHT1
Summer HHT1 tariff.
TarifTypeType
A06Summer HHT2
Summer HHT2 tariff.
TarifTypeType

TimeframeType

45 codes
A01Real time
The information provided concerns real time timeframe.
TimeframeType
A02Intraday
The information provided concerns an intra day timeframe.
TimeframeType
A03Hour-1
The information provided concerns 1 hour ahead for given delivery hour.
TimeframeType
A04Hour-2
The information provided concerns 2 hours ahead for given delivery hour.
TimeframeType
A05Hour-3
The information provided concerns 3 hours ahead for given delivery hour.
TimeframeType
A06Hour-4
The information provided concerns 4 hours ahead for given delivery hour.
TimeframeType
A07Hour-5
The information provided concerns 5 hours ahead for given delivery hour.
TimeframeType
A08Hour-6
The information provided concerns 6 hours ahead for given delivery hour.
TimeframeType
A09Hour-7
The information provided concerns 7 hours ahead for given delivery hour.
TimeframeType
A10Hour-8
The information provided concerns 8 hours ahead for given delivery hour.
TimeframeType
A11Hour-9
The information provided concerns 9 hours ahead for given delivery hour.
TimeframeType
A12Hour-10
The information provided concerns 10 hours ahead for given delivery hour.
TimeframeType
A13Hour-11
The information provided concerns 11 hours ahead for given delivery hour.
TimeframeType
A14Hour-12
The information provided concerns 12 hours ahead for given delivery hour.
TimeframeType
A15Hour-13
The information provided concerns 13 hours ahead for given delivery hour.
TimeframeType
A16Hour-14
The information provided concerns 14 hours ahead for given delivery hour.
TimeframeType
A17Hour-15
The information provided concerns 15 hours ahead for given delivery hour.
TimeframeType
A18Hour-16
The information provided concerns 16 hours ahead for given delivery hour.
TimeframeType
A19Hour-17
The information provided concerns 17 hours ahead for given delivery hour.
TimeframeType
A20Hour-18
The information provided concerns 18 hours ahead for given delivery hour.
TimeframeType
A21Hour-19
The information provided concerns 19 hours ahead for given delivery hour.
TimeframeType
A22Hour-20
The information provided concerns 20 hours ahead for given delivery hour.
TimeframeType
A23Hour-21
The information provided concerns 21 hours ahead for given delivery hour.
TimeframeType
A24Hour-22
The information provided concerns 22 hours ahead for given delivery hour.
TimeframeType
A25Hour-23
The information provided concerns 23 hours ahead for given delivery hour.
TimeframeType
A26Hour-24
The information provided concerns 24 hours ahead for given delivery hour.
TimeframeType
A27Hour-25
The information provided concerns 25 hours ahead for given delivery hour.
TimeframeType
A28Hour-26
The information provided concerns 26 hours ahead for given delivery hour.
TimeframeType
A29Hour-27
The information provided concerns 27 hours ahead for given delivery hour.
TimeframeType
A30Hour-28
The information provided concerns 28 hours ahead for given delivery hour. – Page 63 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
TimeframeType
A31Hour-29
The information provided concerns 29 hours ahead for given delivery hour.
TimeframeType
A32Hour-30
The information provided concerns 30 hours ahead for given delivery hour.
TimeframeType
A33Hour-31
The information provided concerns 31 hours ahead for given delivery hour.
TimeframeType
A34Day ahead
The information provided concerns day ahead timeframe.
TimeframeType
A35Day-2
The information provided concerns two days ahead timeframe.
TimeframeType
A36Day-3
The information provided concerns three days ahead timeframe.
TimeframeType
A37Day-4
The information provided concerns four days ahead timeframe.
TimeframeType
A38Day-5
The information provided concerns five days ahead timeframe.
TimeframeType
A39Day-6
The information provided concerns six days ahead timeframe.
TimeframeType
A40Day-7
The information provided concerns seven days ahead timeframe.
TimeframeType
A41Week ahead
The information provided concerns next week ahead timeframe.
TimeframeType
A42Week-0
The information provided concerns current week timeframe.
TimeframeType
A43Week+1
The information provided concerns previous week timeframe.
TimeframeType
A44Month ahead
The information provided concerns month ahead timeframe.
TimeframeType
A45Year ahead
The information provided concerns year ahead timeframe.
TimeframeType

UnitOfMeasureType

5 codes
A59OKTA unit
A unit of measurement of the cloudiness expressed in OKTA or OCTA, i.e. A unit of count defining the number of eighth-parts as a measure of the celestial dome cloud coverage.
UnitOfMeasureType
A90gigawatt
GW unit as per UN/CEFACT recommendation 20. – Page 64 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code
UnitOfMeasureType
A97European Network of
Transmission System Operators for Electricity Title hectopascal Description A unit of measurement of the pressure expressed in hectopascal. AMP ampere The unit of electrical current in the International system of Units (SI) equivalent to one Coulomb per second. C62 One A unit for dimensionless quantities, also called quantities of dimension one. CEL Celsius A unit of measurement of temperature expressed in degree Celsius. D54 watt per square meter A unit of measurement of the density of heat flow rate expressed in watt per square meter.
UnitOfMeasureType
DDdegree (unit of angle) A unit of measurement of angles expressed in a 0 to 360 degree gradient.
UnitOfMeasureType
E08Megawatt per Hertz
A unit of energy expressed as the load change in million watts that will cause a frequency shift of one hertz. GWH gigawatt hour GWh unit as per UN/CEFACT recommendation 20. HMQ cubic hectometres A unit of volume equal to one million cubic metres. HTZ Hertz HTZ unit as per UN/CEFACT recommendation 20. KEL K (Kelvin) Temperature unit refer ISO 80000-5 (Quantities and units, Part 5: Thermodynamics). KMT kilometre km unit as per UN/CEFACT recommendation 20. KVR kilovolt ampere reactive A unit of electrical reactive power represented by a current of one thousand amperes flowing due to a potential difference of one thousand volts where the sine of the phase angle between them is 1. The unity power factor is expressed in thousands of a volt ampere reactive. KVT kilovolt kV unit as per UN/CEFACT recommendation 20. KWH kilowatt hour A total amount of electrical energy transferred or consumed in one hour. KWT kilowatt A unit of bulk power flow, which can be defined as the rate of energy transfer /consumption when a current of 1000 amperes flows due to a potential of 1000 volts at unity power factor expressed in thousands of a watt. MAH megavolt ampere reactive hours Total amount of reactive power across a power system. MAR megavolt ampere reactive A unit of electrical reactive power represented by a current of one thousand amperes flowing due to a potential difference of one thousand volts where the sine of the phase angle between them is 1. MAW megawatt A unit of bulk power flow, which can be defined as the rate of energy transfer /consumption when a current of 1000 amperes flows due to a potential of 1000 volts at unity power factor expressed in millions of a watt. MIN minute A period of time equal to sixty seconds. MMT millimeter A unit of measurement of length expressed in millimeter. MQS cubic metres per second The volume flow rate of cubic metre per second. MTQ cubic metre A Cubic metre. MTR metre The length of a metre. MTS meter per second A unit of measurement of the speed expressed in m/s. MTZ millihertz A unit of frequency equal to 0.001 cycle per second. MVA megavolt-ampere MVA unit as per UN/CEFACT recommendation 20. MWH megawatt hours The total amount of bulk energy transferred or consumed. – Page 65 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code
UnitOfMeasureType

UnitSymbol

2 codes
DDdegree (unit of angle) A unit of measurement of angles expressed in a 0 to 360 degree gradient.
GKH grams per kilowatt hour It represents the mass rate of emissions per unit of work accomplished. HTZ Hertz HTZ unit as per UN/CEFACT recommendation 20 KVT kV The symbol of kV MAR MVAr The symbol of MVAr MAW MW The symbol of MW MVA megavolt-ampere MVA unit as per UN/CEFACT recommendation 20 OHM Ohm The symbol of Ohm Unit
UnitSymbol
P1A unit of proportion equal to 0.01.
Percent 318 319 2.37 DocumentType enumeration 320 321 The DocumentTypeList is only used in XML instances using deprecated ENTSO -E schema; otherwise for XML instances based CIM, the codelist is MessageTypeList. 322 323 Therefore, you are kindly advised to refer to the MessageType enumeration, which includes the same enumeration codes. – Page 66 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e
UnitSymbol