Allocation Mode Types
3 codesA01Order by price with
pro rata The allocation method is by price with eventual pro rata.
A02Order by price with
first come - first served The allocation method is by price with eventual use of first come first served.
A03First come - First
served The allocation method is first come first served.
AnalogType
42 codesA01Flow
This is the computed flow for the monitored element in the constraint situation ("N situation", "N-1 situation" ...) after the capacity calculation. The flow is expressed in A, %, or MW.
A02Permanent admissible The permanent load of transmission system elements which is allowed for an
transmission limit unlimited period and which does not cause physical damage to the transmission (PATL) system elements as long as the defined threshold is respected.
A03Flow reliability margin This is the flow reliability margin for a given critical network element. The amount of
MW or A that is reserved for this critical network element and shall not be used for the computed outage situation, in order to secure the power network.
A04Spanning margin
value This is the margin that is taken into account when spanning (fall -back process) is applied. Spanning marginal value is an historical based parameter which specifies the amount of MW that reduces the RAM when spanning is applied. – Page 5 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
A05Long term allocation
margin This is the amount of MW that is added to the capacity of the critical network element in order to automatically include the long term allocation domain into the flow based domain.
A06Final adjustment
margin value This is the margin that is manually added or subtracted to the capacity of the critical network element. A negative value for final adjustment value simulates the effect of an additional margin due to complex remedial actions (RA) which cannot be modeled and so calculated in the flow based parameter calculation. A positive value for FAV as a consequence of the verification phase of the flow based domain, leading to the need to reduce the margin on one or more CBs for system security reasons.
A07Transitory admissible The temporary overload of transmission system elements which is allowed for a
transmission limit limited period and which does not cause physical damage to the transmission system (TATL) elements as long as the defined duration and thresholds are respected.
A08Long admissible flow
This is the value, expressed in A or MW, that the overload flow in a network element shall not exceed for a duration no longer than the long duration. The long duration value depends on the TSO network operating rules.
A09Negative Final
adjustment margin value This is the margin that is manually added to the capacity of the critical network element in order to simulate the effect of an additional margin due to complex remedial actions (RA) which cannot be modeled and so calculated in the flow based parameter calculation.
A10Minimum voltage level This is the minimum voltage that can be supported by a network element without
involving a risk for the security of supply.
A11Maximum voltage
level This is the maximum voltage that can be supported by a network element without involving a risk for the security of supply.
A12TATL after automatic
RAThe Transitory admissible transmission limit (TATL) which is allowed after a curative
Remedial Action (RA) has been applied.
A13TATL after curative
A14Computed Voltage
This is the computed voltage for a given monitored element.
A15Zero-Balance flow
This is the amount of power affected by a contingency that reflects a situation with a scheduled exchange of zero.
A16Available margin after This is the available flow margin adjusted for the consideration of remedial actions in
remedial actions capacity calculation.
A17Loss Factor
This is the loss factor for an asset.
A18Adjustment for
minimum RAM This is the adjustment applied to the capacity of a branch to have a minimum RAM (Remaining Available Margin) available for commercial exchanges.
A19Tap changer
The position of a Tap changer.
A20Regulator mode
A measurement type indicating the control mode of a regulator, i.e. from voltage regulation to fixed MVAR regulation.
A21Regulator set-point
The set-point of a regulator. A regulator can be a tap changer, a synchronous machine, a SVC or a shunt.
A22Reference Flow
This is the amount of power affected by a contingency that reflects a situation with scheduled exchanges from a reference situation.
A23CO2 emission
This is the CO2 emission from one or several assets.
A24Maximum admissible
current (Imax) The maximum admissible current of a critical network element or a critical network element and contingency.
A25Individual value
adjustment (IVA) Individual value adjustment resulting from TSO validation process. – Page 6 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A26Linear flow
approximation (F0) The linear approximation of a flow in the reference net position in a situation without any cross-zonal exchanges.
A27Flow without
Flow per critical network element and contingency without commercial exchanges commercial within a capacity calculation region. exchanges (F0_Wce)
A28Flow without
commercial exchanges between areas (F0_all) Flow per critical network element and contingency without commercial exchanges between bidding zones within the same or different synchronous areas.
A29Flow due to noncostly remedial
actions (F_nrao) Expected flow change due to non-costly remedial actions.
A30Flow after long-term
nominations (F_LTN) Flow after consideration of long-term nominations.
A31Coordinated value
adjustment (CVA) Coordinated value adjustment resulting from coordinated validation process.
A32Minimum remaining
available margin as ratio of maximum allowable power flow (Ramr) Percentage of the maximum allowable power flow that needs to be available as minimum Remaining Available Margin.
A33Flows from already
Flows resulting from previously allocated cross -zonal capacities. allocated cross-zonal capacities (Faac)
A34Flow from remedial
action (FRA) Flow for increasing the Remaining Available Margin due to remedial action.
A35Assumed external
exchanges Flow resulting from assumed commercial exchanges outside the region (F_uaf).
A36Minimum remaining
available margin target Target capacity for exchanges by deducing the exchanges not related to the region.
A37Average voltage
Average voltage on two connecting nodes of a critical network element resulting from AC load flow calculation with applied reactive power constraints (U).
A38Average power factor Average power factor on two connecting nodes of a critical network element resulting
from AC load flow calculation (cos phi).
A39Lower ramp rate
The maximum rate that the output can be lowered by.
A40Raise ramp rate
The maximum rate that the output can be raised by.
A41Negative reference
flow The amount of power negatively affected by a contingency that reflects a situation with scheduled exchanges from a reference situation.
AssetType
89 codesA01Tie line
A high voltage line used for cross border energy interconnections.
A02Line
A specific electric line within a country.
A03Resource Object
A resource that can either produce or consume energy.
A04Generation
A resource that can produce energy.
A05Load
A resource that can consume energy.
A06Phase Shift
Transformer An electrical device for controlling the power flow through specific lines in a power transmission network.
A07Circuit Breaker
An electrical switch designed to protect an electrical circuit from damage caused by overcurrent/overload or short circuit.
A08Busbar
A specific element within a substation to connect grid elements for energy distribution purposes.
A09Capacitor
A transmission element designed to inject reactive power into the transmission network.
A10Inductor
A transmission element designed to compensate reactive power in the transmission network.
A11Power plant
connection All the network equipment that link the generating unit to the grid.
A12FACTS
Flexible Alternating Current Transmission System
A13Production unit
A production unit is a composition of one or several generation units.
A14Internal tie line
An internal tie line is a line between two scheduling areas within the same bidding zone.
B01Biomass
A resource using biomass for energy.
B02Fossil Brown
coal/Lignite A resource using Fossil Brown coal/Lignite for energy.
B03Fossil Coal-derived
gas A resource using Fossil Coal-derived gas for energy.
B04Fossil Gas
A resource using Fossil Gas for energy.
B05Fossil Hard coal
A resource using Fossil Hard coal for energy.
B06Fossil Oil
A resource using Fossil Oil for energy.
B07Fossil Oil shale
A resource using Fossil Oil shale for energy.
B08Fossil Peat
A resource using Fossil Peat for energy.
B09Geothermal
A resource using Geothermal for energy.
B10Hydro-electric pure
Unit in which moving water energy is converted to electricity using flowing water to pumped storage head generate electricity with a large dam and reservoirs. Pure pumped storage plants installation store water in an upper reservoir with no natural inflows.
B11Hydro Run-of-river
head installation
B12Hydro-electric storage Unit in which moving water energy is converted to electricity using flowing water to
head installation generate electricity with a large dam and reservoirs. Unit in which moving water energy is converted to electricity using flowing water to generate electricity in the absence of a large dam and reservoirs. – Page 8 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B13Marine unspecified
Unit in which marine energy is converted to electricity with equipment/devices not specified.
B14Nuclear unspecified
A unit in which the heat source is a nuclear reactor of type that is not specified in other nuclear types.
B15Other renewable
A resource using Other renewable for energy.
B16Solar unspecified
Unit in which solar energy is converted to electricity with equipment/devices not specified.
B17Waste
A resource using Waste for energy.
B18Wind Offshore
Unit in which wind energy is converted to electricity using wind farms constructed in bodies of water, usually in the ocean.
B19Wind Onshore
Unit in which wind energy is converted to electricity using wind farms constructed on land.
B20Other unspecified
Other unspecified technology.
B21AC Link
Overhead line or cable which is used to transmit electrical power via Alternative Current.
B22DC Link
Overhead line or cable which is used to transmit electrical power via Direct Current.
B23Substation
An assembly of equipment in an electric power system through which electric energy is passed for transmission, transformation, distribution or switching.
B24Transformer
Electrical device that transfers energy from one voltage level to another voltage level.
B25Energy storage
A resource that stores energy. It could be gas, electricity, etc.
B26Demand Side
Response A resource that change its electricity consumption patterns in response to a signal or incentive.
B27Dispatchable hydro
resource A resource referring to dispatchable hydro generation.
B28Solar photovoltaic
Unit in which solar energy is converted to electricity using a technology based on the photoelectric effect.
B29Solar concentration
Unit in which solar energy is converted to electricity using mirrors to concentrate the sun's energy to drive traditional steam turbines or engines.
B30Wind unspecified
Unit in which wind energy is converted to electricity with equipment/devices not specified.
B31Hydro-electric
unspecified Unit in which moving water energy is converted to electricity with equipment/devices not specified.
B32Hydro-electric mixed Unit in which moving water energy is converted to electricity using flowing water to
pumped storage head generate electricity with a large dam and reservoirs. Mixed pumped storage plants installation use a combination of pumped storage and conventional hydroelectric plants with an upper reservoir that is replenished in part by natural inflows from a stream or river.
B33Marine tidal
Unit in which marine energy from tides is converted to electricity.
B34Marine wave
Unit in which marine energy from waves is converted to electricity.
B35Marine currents
Unit in which marine energy from currents is converted to electricity.
B36Marine pressure
Unit in which marine energy from pressure is converted to electricity.
B37Thermal unspecified
Unit in which heat energy is converted to electricity with equipment/devices not specified in other thermal types. – Page 9 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B38Thermal combined
Unit in which heat energy is converted to electricity called Combined Cycle Gas cycle gas turbine with Turbine. The power is generated by the single or multiple gas turbine(s) in heat recovery combination with the steam turbine(s). The unit might be equipped with waste heat recovery (e.g. to district heating network).
B39Thermal steam turbine Unit in which heat energy is converted to electricity. The power is generated with the
with back-pressure steam that is expanded in the back-pressure steam turbine with or without heat turbine (open cycle) output (e.g. to district heating network).
B40Thermal steam turbine Unit in which heat energy is converted to electricity. The power is generated with the
with condensation steam that is expanded in the condensation steam turbine with or without heat output turbine (closed cycle) (e.g. to district heating network).
B41Thermal gas turbine
with heat recovery Unit in which heat energy is converted to electricity called Simple Cycle Gas Turbine. The power is generated by the gas turbine and the flue gas waste heat is recovered (e.g. to district heating network).
B42Thermal internal
combustion engine An internal combustion engine is a heat engine in which the combustion of a fuel occurs with an oxidizer (usually air) in a combustion chamber that is an integral part of the working fluid flow circuit (e.g. reciprocating engine). The unit might be equipped with waste heat recovery (e.g. to district heating network).
B43Thermal micro-turbine Unit in which heat energy is converted to electricity called Simple Cycle Gas Turbine.
The power is generated by the gas turbine (capacity less than 500kWe). The unit might be equipped with waste heat recovery (e.g. to district heating network).
B44Thermal Stirling
engine A Stirling engine is a heat engine that is operated by the cyclic compression and expansion of air or other gas (the working fluid) at different temperatures, resulting in a net conversion of heat energy to mechanical work.
B45Thermal fuel cell
A fuel cell is an electrochemical cell that converts the chemical energy of a fuel (e.g. hydrogen) and an oxidizing agent (e.g. oxygen) into electricity through a pair of redox reactions.
B46Thermal steam engine A steam engine is a heat engine that performs mechanical work using steam as its
working fluid. The steam engine uses the force produced by steam pressure to push a piston back and forth inside a cylinder.
B47Thermal organic
Rankine cycle
B48Thermal gas turbine
Unit in which heat energy is converted to electricity called Simple Cycle Gas Turbine. without heat recovery The power is generated by the gas turbine and there is no flue gas waste heat recovery.
B49Nuclear heavy water
reactor A unit in which the heat source is a pressurized heavy -water reactor (PHWR) that is a nuclear reactor that uses heavy water (deuterium oxide D2O) as its coolant and neutron moderator.
B50Nuclear light water
reactor A unit in which the heat source is a light-water reactor (LWR) that is a type of thermal-neutron reactor that uses normal water, as both its coolant and neutron moderator � furthermore a solid form of fissile elements is used as fuel.
B51Nuclear breeder
A unit in which the heat source is a nuclear reactor that generates more fissile material than it consumes.
B52Nuclear graphite
reactor A unit in which the heat source is a graphite -moderated reactor that is a nuclear reactor that uses carbon as a neutron moderator, which allows natural uranium to be used as nuclear fuel.
B53Temporary energy
storage A resource that is temporarily connected to the grid and that may store energy when connected, such as an electric vehicle. The Organic Rankine Cycle (ORC) is named for its use of an organic, high molecular mass fluid with a liquid-vapor phase change, or boiling point, occurring at a lower temperature than the water-steam phase change. The fluid allows Rankine cycle heat recovery from lower temperature sources such as biomass combustion, industrial waste heat, geothermal heat, solar ponds etc. The low -temperature heat is converted into useful work, that can itself be converted into electricity. – Page 10 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B54Permanent energy
storage A resource that is permanently connected to the grid and that may store energy when connected, such as a pumped hydro.
B55Electric vehicle
battery A resource using electric vehicle batteries, commercial and private. The reason for separating vehicle batteries and non-vehicle batteries is that the vehicle batteries not necessarily is connected to the charger.
B56Heat pump specified
A heat pump is a device that uses work to transfer heat from a cool space to a warm space by transferring thermal energy using a refrigeration cycle
B57Heat pump electrical
A heat pump is a device that uses electricity to transfer heat from a cool space to a warm space by transferring thermal energy using a refrigeration cycle.
B58Heat pump absorption A heat pump is a device that uses absorption technology to transfer heat from a cool
space to a warm space by transferring thermal energy using a refrigeration cycle.
B59Auxiliary power unit
A technology that provides energy as a backup.
B60Water electrolysis
unspecified Unspecified water electrolysis.
B61Water electrolysis low Unspecified water electrolysis at low temperature as in an Alkaline or Proto -Exchange
temperature Membrane (PEM) fuel cell. unspecified
B62Water electrolysis low Main product water electrolysis at low temperature as in an Alkaline or Proto temperature main
Exchange Membrane (PEM) fuel cell. product
B63Water electrolysis
high temperature unspecified
B64Steam methane
Unspecified methane reforming. reforming unspecified
B65Steam methane
Main product methane reforming without Carbon Capture and Sequestration reforming without (CCS)/Carbon Capture and Use (CCU). CCS/CCU unspecified
B66Steam methane
Unspecified methane reforming with Carbon Capture and Sequestration reforming with (CCS)/Carbon Capture and Use (CCU). CCS/CCU unspecified
B67Steam methane
reforming with CCS/CCU main product Main product methane reforming with Carbon Capture and Sequestration (CCS)/Carbon Capture and Use (CCU).
B68Partial oxidation
unspecified Unspecified partial oxidation.
B69Autothermal reforming Unspecified autothermal reforming.
unspecified
B70Methanol reforming
unspecified Unspecified methanol reforming.
B71Ammonia reforming
unspecified Unspecified ammonia reforming.
B72Ammonia gasification Unspecified gasification.
B73Chlor-alkali
electrolysis unspecified Unspecified water electrolysis at high temperature as in a Solid Oxide Electrolysis Cell (SOEC) fuel cell. Unspecified alkali electrolysis. – Page 11 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B74Chlor-alkali
electrolysis byproduct Alkali electrolysis product.
B75ACDC converter
ACDC converters are electrical circuits that transform alternating current (AC) into direct current (DC) and vice versa.
Auction Types
7 codesA01Implicit
The auction is an implicit auction.
A02Explicit
The auction is an explicit auction.
A03Rule Based
The auction is a rule based auction.
A04Mixed
The auction is partially implicit and partially explicit.
A05Explicit/split
The auction concerns two explicit auctions on a split border.
A06Shadow auction
An explicit auction carried out in the case of the failure of an implicit auction.
A07Flow-based
The allocation is an implicit auction using flow -based capacity calculation.
Business Types
199 codesA01Production
The nature of the business being described is production details.
A02Internal trade
The nature of the business being described is internal trade details.
A03External trade explicit The nature of the business being described is external trade details between two
capacity areas with limited capacity requiring a capacity agreement identification.
A04Consumption
The nature of the business being described is consumption details.
A05External trade total
The nature of the business being described is external trade total.
A06External trade without The nature of the business being described is external trade details between two
explicit capacity areas without requiring capacity allocation information. – Page 12 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A07Net Production /
Consumption Net production/consumption - where signed values will be used. With the following rules: In area=Out area, In party=Out party, + means production and - means consumption.
A08Net internal trade
Net internal trade - where the direction from out party (seller) to in party (buyer) is positive and the opposite direction is negative (with minus signs).
A09IPP (Independent
Power Producer) A time series concerning the production schedule from an IPP.
A10Tertiary control
A time series concerning tertiary reserve.
A11Primary control
A time series concerning primary reserve.
A12Secondary control
A time series concerning secondary reserve.
A13Load profile
A time series concerning a load profile as calculated by a metered data aggregator.
A14Aggregated energy
data A time series concerning adjusted metered readings received from a metered data collector and aggregated and validated by a metered data aggregator.
A15Losses
A time series concerning losses that have been calculated for a tieline or an area.
A16Transits (CBT)
A time series concerning inter area transit flows determined for CBT requirements.
A17Settlement deviation
A time series concerning the imbalance energy calculated by an imbalance settlement responsible.
A18Technical constraint
deviation A time series defining the imbalance between schedules accepted by the system operator due to technical constraints and schedules declared by the balance responsible party.
A19Balance energy
deviation A time series defining the imbalance between the schedule of a balance responsible party that has been corrected by the system operator after using balance energy bids and the schedule that was accepted by the system operator due to technical constraints.
A20Imbalance volume
A time series defining the imbalance between the actual meter readings and the schedule of the balance responsible party corrected by the system operator after using balance energy bids.
A21Unintended energy
A timeseries concerning the volume of an unintended cross -border exchange of energy.
A22Frequency control
A time series concerning primary and secondary reserve.
A23Balance management A time series concerning energy balancing services.
A24Total trade
A time series concerning the total of both the internal and external trades.
A25General Capacity
Information A time series providing the total capacity available on a TSO border.
A26Available transfer
capacity (ATC) Available transfer capacity for cross-border exchanges.
A27Net transfer capacity
(NTC) Net transfer capacity for cross-border exchanges.
A28Control Area Program A time series providing the total exchanges between two TSOs (including the
commercial transactions, the compensation program and the losses compensation program). Note this definition might change when UCTE brings forward its coding requirements.
A29Already allocated
capacity (AAC) The already allocated capacity is the total amount of allocated transmission rights. – Page 13 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A30Internal inter area
trade A trade that occurs between internal areas within a market balance area.
A31Offered Capacity
The time series provides the offered capacity.
A32Capacity transfer
notification The time series provides information concerning the notification of the transfer of capacity to another market participant.
A33Authorised AAC
The time series in question provides the amount of transmission capacity rights to be nominated.
A34Capacity rights
The time series in question provides the capacity rights allocated for a given border.
A35Minimum authorised
AACThe time series in question provides the maximum amount of transmission capacity
rights to be nominated.
A36Maximum authorised
A37Installed generation
The time series in question provides the installed generation.
A38Available generation
The time series in question provides the available generation.
A40Interconnection Trade The Time series in question provides the designation of the ITR that may nominate
Responsible the capacity in question. Designation
A41Released AAC
The already allocated capacity (AAC) that has been released for resale.
A42Requested capacity
(with price) The time series in question provides information concerning the requested capacity including price information.
A43Requested capacity
(without price) The time series in question provides information concerning the requested capacity but excludes price information.
A44Compensation
program Compensation of unintentional deviation is performed by exporting to / importing from the interconnected system during the compensation period by means of schedules as calculated during the accounting of unintentional deviations.
A45Schedule activated
reserves The cross border or internal reserves that are to be activated through schedule nomination.
A46System Operator
redispatching The cross border redispatching between System Operators that are to be activated through schedule nomination.
A47Market capacity price The price of the capacity offered on a given market.
A48Market capacity price The difference between the price of capacity in a Market Balance Area receiving the
differential capacity (In Area) and the price of capacity in a Market Balance Area providing the capacity (Out Area), i.e. In Area Price - Out Area price.
A49Inflow
The volume of water that flows into a reservoir in a given interval.
A50Water extraction
The volume of water that can be extracted from a reservoir in a given interval.
A51Turbined water
The volume of water that can be turbined in a plant in a given interval.
A52Water spillage
The volume of water that is not turbined going through the spillway in a given interval.
A53Planned maintenance Maintenance has been planned for the object in question with a forecast ending date.
A54Unplanned outage
An unplanned outage has occurred on the object in question.
A55Use it Or Sell it
(UIOSI) pricing The time series provides information on the capacity resold in the "use it or sell it" process and its corresponding price. – Page 14 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
A56Compensation for
auction cancellation where capacity is for resale The time series provides information on the compensation of the capacity for resale following an auction cancellation.
A57Resale pricing
For each Physical Transmission Rights holder, this document contains the resold capacity and its corresponding price.
A58Curtailed capacity
compensation The time series provides information to compensate a party when curtailment is applied on the capacity obtained in a previous auction, resale or transfer.
A59Use it Or Sell it
The time series provides information on the compensation for the capacity following (UIOSI) compensation an auction cancellation.
A60Minimum possible
The time series provides a schedule of minimum possible values for a Resource Object. The nature of the flow could be defined by the attribute Direction.
A61Maximum available
The time series provides a schedule of maximum available values for a Resource Object. The nature of the flow could be defined by the attribute Direction.
A62Spot price
The time series provides the market spot prices from an auction.
A63Minimum ATC
The Available Transmission Capacity that must be guaranteed because of regulatory constraints.
A64Meter Measurement
data The data as provided for a meter measurement source.
A65Accounting Point
Relevant data The metered data that is to be considered relevant for accounting purposes.
A66Energy flow
Energy flow information.
A67Power plant energy
Schedule Energy flow scheduled for a power plant.
A68Compensation
Requirements for the compensation period The time series provides the compensation requirements for a given compensation period.
A69Market coupling
results The time series provides the results of a market coupling auction.
A70Production,
unavailable Production capacity that normally would be available, but due to maintenance or similar is temporarily unavailable.
A71Supplementary
available generation The supplementary generation that is available.
A72Interruptible
consumption The consumption that may be interrupted on request.
A73Summarised Market
Balance Area Schedule A time series providing the total exchanges based on commercial transactions between two Market Balance Areas.
A74Load Frequency
Control Program Schedule A time series providing the schedule information for the Load Frequency Control Program.
A75Timeframe
A time series providing the total exchanges of Timeframe Independent Schedules Independent Schedule between two System Operators.
A76Consumption
curtailment A time series providing the amount of voluntary consumption curtailed by the energy supplier of an end-consumer. – Page 15 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A77Production,
dispatchable The nature of the business being described is dispatchable production details, i.e. generation output that can be changed by a request (activation order) of the TSO according with the applicable Market Rules.
A78Consumption,
dispatchable The nature of the business being described is dispatchable consumption details, i.e. consumption output that can be changed by a request (activation order) of the TSO according with the applicable Market Rules.
A79Production, nondispatchable
The nature of the business being described is non-dispatchable production details, i.e. generation output that cannot be modified by an activation order.
A80Consumption, nondispatchable
The nature of the business being described is non-dispatchable consumption details, i.e. consumption output that cannot be modified by an activation order.
A81Total Transfer
Capacity (TTC) The Total Transfer Capacity is the maximum exchange program between two areas compatible with operational security standards applicable at each system if future network conditions, generation and load patterns were perfectly known in advance.
A82Mutual Emergency
Assistance Service (MEAS) The cross border Mutual Emergency Assistance Service between System Operators that are to be activated through schedule nomination.
A83Auction cancelation
The time series covers auction cancellation right.
A84Nomination
curtailment The time series covers nomination curtailment rights
A85Internal redispatch
Redispatch to relieve Market Balance Area internal congestion.
A86Control area balance
energy A sum of secondary, tertiary control as well as other energy that was used to balance a control area.
A87Balancing energy
price Price of energy used to balance.
A88Economised
secondary reserve The activated secondary reserve that had been economised due to pooled reserve management.
A89Spinning reserve
The extra generating capacity that is available by increasing the production of generators that are already connected to the power system.
A90Solar
The business being described concerns solar power.
A91positive forecast
margin The business being described concerns a positive forecast margin.
A92Negative forecast
margin The business being described concerns a negative forecast margin.
A93Wind generation
The business being described concerns wind generation.
A94Solar generation
The business being described concerns solar generation.
A95Frequency
containment reserve The business being described concerns frequency containment reserve.
A96Automatic frequency
restoration reserve The business being described concerns automatic frequency restoration reserve.
A97Manual frequency
restoration reserve The business being described concerns manual frequency restoration reserve.
A98Replacement reserve The business being described concerns replacement reserve.
A99Financial information
The business being described concerns financial information.
B01Interconnector
network evolution The business being described concerns interconnector network evolution. – Page 16 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
B02Interconnector
network dismantling The business being described concerns interconnector network dismantling.
B03Counter trade
The business being described concerns counter trades.
B04Congestion costs
The business being described concerns congestion costs.
B05Capacity allocated
(including price) The business being described concerns capacity allocation and includes price information.
B06DC link constraint
The business being described concerns DC link constraints.
B07Auction revenue
The business being described concerns auction revenue.
B08Total nominated
capacity The business being described concerns the total nominated capacity.
B09Net position
The business being described concerns net position.
B10Congestion income
The business being described concerns congestion income.
B11Production unit
The business being described concerns a production unit.
B12Rounded market
coupling results Rounded outputs of the market coupling to be sent to TSOs and Market Participants.
B13Allocation Revenue
The time series provides information on the revenue generated by the allocations.
B14Production deviation
A time series concerning the imbalance energy between the metered production and the schedules calculated by an imbalance settlement responsible.
B15Consumption
deviation A time series concerning the imbalance energy between metered consumption and the forecasted consumption calculated by an imbalance settlement responsible.
B16Transmission asset
The business being described concerns a transmission asset.
B17Consumption unit
The business being described concerns a consumption unit.
B18In-feed ATC
Available Transfer Capacity at the in-feed side of a DC tieline.
B19Out-feed ATC
Available Transfer Capacity at the out -feed side of a DC tieline.
B20Balance up regulation A time series concerning balance regulation market prices for up regulation.
price
B21Balance down
regulation price A time series concerning balance regulation market prices for down regulation.
B22Main direction
A time series concerning the direction of balance regulations.
B23Consumption
imbalance price A time series concerning imbalance prices for consumption.
B24Production sales
imbalance price A time series concerning imbalance prices for production sales.
B25Production purchase
imbalance price A time series concerning imbalance prices for production purchase.
B26Average balance price A time series concerning the average prices between Market Balance Areas.
between MBAs
B27Pumped
A time series concerning the electricity consumption related to pumping.
B28Large installation
consumption A time series concerning consumption from large installation.
B29Metering Grid Area
(MGA) imbalance A time series concerning imbalance between reported consumption, production and exchange in a Metering Grid Area. – Page 17 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B30HVDC Link settings
The time series in question provides HVDC Link settings.
B31Transmission
Reliability Margin (TRM) A time series concerning Transmission Reliability Margin (TRM).
B32Imbalance component This information is used to provide to a pool manager the combined imbalance of all
for a pool the pool participants.
B33Area Control error
(ACE) The sum of the instantaneous difference between the actual and the set -point value of the measured total power value and Control Program including Virtual Tie -Lines for the power interchange of a LFC Area or a LFC Block and the frequency bias given by the product of the K-Factor of the LFC Area or the LFC Block and the Frequency Deviation.
B34Area Control Error
after Imbalance Netting A time series concerning the Area Control Error after applying the imbalance netting energy correction.
B35Implicit and explicit
trade total The sum of cross border schedules based on implicit and explicit trades including long term, yearly, monthly, weekly, daily processes.
B36Production units own
consumption The consumption of one or more production units.
B37Constraint situation
The timeseries describes the constraint situation for a given TimeInterval. A constraint situation can be: - composed of a list of network elements in outage associated for each outage to a list of network elements on which remedial actions have been car ried out accordingly to contingency process - or it can be an external constraint.
B38Initial domain
The timeseries describe the full flow based domain for a given TimeInterval. Critical network elements are displayed in details and their impact on the market is quantified.
B39Flow based domain
The timeseries describe the full flow based domain for a given TimeInterval adjusted adjusted to long term to the latest update of the schedules. schedules Critical network elements are displayed in details and their impact on the market is quantified.
B40Network element
constraint
B41Calculation opposition The timeSeries describes a party who is opposed to the calculation result and
(Red Flag) imposes its transfer capacity value.
B42Base case
proportional shift key The GSK or LSK are proportional to the base case generation or load.
B43Proportional to
participation factors shift key The GSK or LSK are proportional to the participation factors.
B44Proportional to the
remaining capacity shift key The GSK is proportional to the remaining available capacity.
B45Merit order shift key
The GSK is proportional to a merit order list.
B46Wind speed
The TimeSeries provides information on the wind speed.
B47Wind direction
The TimeSeries provides information on the wind direction.
B48Solar irradiance
The TimeSeries provides information on the power per unit area produced by the sun in the form of electromagnetic radiation.
B49Air temperature
The TimeSeries provides information on the air temperature. The timeSeries describes limiting elements which are overloaded. – Page 18 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B50Cloudiness
The TimeSeries provides information on the cloudiness, i.e. the level of coverage of the sky with clouds.
B51Air humidity
The TimeSeries provides information on the level of humidity of the air.
B52Atmospheric pressure The TimeSeries provides information on the atmospheric pressure.
B53Precipitation
B54Network constraint
The TimeSeries describes the network elements, that constraints the market, to be situation that taken into account to simulate a network constraint during the network load flow constraints the market studies. The network situation includes the contingencies, the remedial actions, the monitored network elements and the potential additional constraints.
B55Contingency
The TimeSeries describes the network elements part of the contingency to be simulated for a given TimeInterval.
B56Remedial Action
The TimeSeries describes a set of remedial actions for a given TimeInterval.
B57Monitored Network
Element The TimeSeries describes the network elements to be monitored during the network load flow studies.
B58Busbar
The TimeSeries describes the network elements that composed a busbar.
B59Network Element
The TimeSeries describes network elements.
SPSThe TimeSeries describes the network elements managed by a Special Protection
System (automation).
B61Aggregated netted
external market schedule The aggregated netted external market schedules for a given border.
B62Aggregated netted
external TSO schedule The aggregated netted external TSO schedules for a given border.
B63Aggregated netted
external schedule The aggregated netted external schedules for a given border.
B64Netted area AC
position The AC position for a given area.
B65Netted area position
The netted aggregation of all AC external schedules of an area plus the aggregated External Netted Schedules of related HVDC links of an area.
B66Interconnection shift
key The shift key series describes the amount of power to be shifted from a border area.
B67DC flow with losses
DC flow with losses refers to the values at the importing end of the DC line.
B68DC flow without
losses DC flow without losses refers to the values at the exporting end of the DC line.
B69minimum value of
netted area position That value which a netted area position must not fall below for a given area.
B70maximum value of
netted area position That value which a netted area position must not exceed for a given optimisation area.
B71maximum value of DC That value which a balanced DC flow must not exceed for a given DC line on
flow exporting end. When aligning DC flows CGMA algorithm will respect this constraint.
B72minimum value of DC That value which a balanced DC flow must not fall below for a given DC line on
exporting end. Currently this business type is only included for consistency reasons. flow It is always set to 0. This constraint might, however, be used in future. When aligning DC flows the CGMA algorithm will respect this constraint. The TimeSeries provides information on the amount of rain, snow, etc. that falls on the ground. – Page 19 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B73indicative AC flow
It is the hypothetical flow on the aggregate of all AC tie lines of an electrical border between two optimisation areas. It results from the adjustments to the preliminary netted area positions of all optimisation areas made by the CGMA algorithm. Indicative AC flows are an artefact of the CGMA algorithm, and do not correspond to physical flows
B74Offer
The time series provides an offer to provide reserves.
B75Need
The time series provides a requirement for reserves.
B76Opportunity costs or
benefits The time series describes any opportunity costs or benefits.
B77Financial
compensation or penalties The time series describes any financial compensation or penalties
B78Global radiation
The total short-wave radiation from the Global radiation is the total short -wave radiation from the sky falling onto a horizontal surface on the ground. It includes both the direct solar radiation and the diffuse radiation resulting from reflected or scatt ered sunlight.
B79Diffuse radiation
Radiation resulting from reflected or scattered sunlight.
B80Direct solar radiation
Radiation resulting from direct sunlight
B81Outage (OUT)
Outage process: Element is out of operation due to planned maintenance or due to an unplanned/forced outage. Outage may be used as a synonym for unavailability.
B82Special switching
state (SSS) Outage Process: This state applies to grid elements which are in operation in an exceptional state (e.g. separated nodes operation).
B83Testing (TEST)
Outage process: TESTING means any element status is possible - ON or OUT. This status applies either between first connection and final commissioning of the relevant asset, or directly following maintenance of the relevant asset.
B84Auxiliary busbar
operation Outage process: Element is in operation but connected via auxiliary busbar
B85Automatic reclosing
Outage process: Protection function Automatic reclosing is switched off for electric line
B86Busbar protection
Protection function busbar protection is switched off
B87Phase Shift Angle
The maximum phase shift angle allowed between two network elements.
B88Base Case Network
Situation The TimeSeries describes the network elements to be taken into account to simulate a base case network situation during the network load flow studies, without any contingency.
B89Inter-TSO assistance Cross border assistance schedule between TSOs not interconnected directly.
B90FlexibleNeed
The business type indicates that the need is optional.
B91GLSK Limitation
A constraint related to a GLSK maximum or minimum limitation in the production or/and consumption shift.
B92Capacity ramping
limitation A constraint related to a ramping limitation on the capacity offered at a given border.
B93interconnector
capacity The maximum capacity that can be exchanged on an interconnector, excluding external factor on both ends.
B94Must Run
A time series concerning must run generation.
B95Procured capacity
An accepted offer of balancing capacity.
B96Used capacity
The used cross-zonal balancing capacity. – Page 20 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B97Estimated costs
Estimated costs of the process.
B98Estimated benefits
Estimated benefits of the process.
B99Load Shedding
A time series concerning a load shedding used to avoid failure of the power system. C01 Remaining Capacity A time series concerning the remaining capacity. C02 Indicator of generation capacity adequacy Indicator of adequacy, it indicates if there is final generation remaining capacity after SMTA calculation. C03 Income from price divergence without congestions The time series describes income due to price divergence without congestion between bidding zones. C04 Push-button The cross-border Push-button service between System Operators. C05 Intertripping The cross-border Intertripping service between System Operators. C06 Emergency instruction The cross-border Emergency instruction service between System Operators. C07 Ramp management The schedule resulting from cross-border Ramp management service between System Operators. C08 Profile smoothing The schedule resulting from cross-border Profile smoothing service between System Operators. C09 Emergency reallocation deselection The schedule resulting from cross-border Emergency reallocation deselection service between System Operators. C10 SO-SO-trade The generic cross border trade between System Operators. C11 Production reduction A time series providing the volume of production reduced by an energy provider / producer / supplier. C12 Maximum power exchange The timeseries provides the maximum admissible power flow between two bidding zones respecting operational security limits taking into account N -1 criterion. C13 Maximum power exchange after remedial actions The timeseries provides the maximum admissible power flow between two bidding zones after remedial actions. C14 Network constraint situation that cannot limit the market The TimeSeries describes the network elements, that cannot limit the market, to be taken into account to simulate a network constraint during the network load flow studies. The network situation includes the contingencies, the remedial actions, the monitored network elements and the potential additional constraints. C15 Flat participation for Flat GSK factors of all generators or loads, independently of the size. all generators or loads C16 Proportional to installed capacity of generators Generators participate relative to their maximum (installed) capacity (MW). C17 Market price and total A time series concerning market price and total volume. volume C18 Import price A time series concerning import price (the volume-weighted price average of all accepted bids). C19 Capacity allocated (excluding price) The business being described concerns capacity allocation and excludes price information. C20 Common Grid Model Equipment The timeseries provides equipment related to the Common Grid Model (CGM). – Page 21 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description C21 Exchanged balancing The balancing reserve capacity exchanged between areas. reserve capacity C22 Shared balancing reserve capacity The balancing reserve capacity shared between areas. C23 Share of reserve capacity A time series concerning the share of reserve capacity. C24 Actual reserve capacity A timeseries concerning actual reserve capacity. C25 K-factor K-factor as stated in the SO GL Art. 2 (45). It is also known as Frequency Bias. C26 Frequency FCR-N is a reserve that is automatically activated in both directions around a set Containment Reserve- point when the frequency varies between 50.10 Hz and 49.90 Hz after an imbalance. Normal (FCR-N) FCR-D is a reserve that is automatically activated when the frequency falls below C27 Frequency Containment Reserve- 49.90 Hz or rises above 50.1 Hz after an imbalance. Disturbance (FCR-D) C28 Internal trade difference A time series concerning internal trade difference, within an area, such as a Bidding Zone or Scheduling Area. The internal trade difference is the difference between trades reported from an out party (seller) and an in party (buyer). C29 Small scale production Production from small scale production plants. C30 System price The system price is an unconstrained market clearing reference price. It is calculated without any congestion restrictions by setting capacities to infinity. C31 Wind gust An increase in the speed of the wind lasting for a short period. C32 Area imbalance A time series concerning imbalance between planned consumption, production and exchange in an Area. C33 Unintended energy price A timeseries concerning the price of the unintended cross -border exchange of energy. C34 Frequency containment process energy A timeseries containing the volume of energy resulting from the frequency containment process. C35 Frequency containment process energy price A timeseries containing the energy price from the frequency containment process. C36 Ramping period energy A timeseries containing the volume of energy exchanged as a result of ramping between different ANES values. C37 Ramping period energy price A timeseries containing the price of the energy exchanged as a result of ramping between different ANES values. C38 Frequency deviation A timeseries concerning the difference between the actual and the nominal frequency of a synchronous area. C39 Day-Ahead market price A timeseries concerning Day-Ahead market prices. C40 Conditional bid Standard product bid that is conditional on bids submitted outside of common platform. C41 Thermal limit The current causing a given network element to work outside of the range of safe operating temperatures. C42 Frequency Limit A constraint related to the containment of frequency deviations within a given area. – Page 22 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description C43 Voltage limit The maximum or minimum permissible voltage within normal operation state of a given network element. C44 Current limit The maximum permissible current within normal operation state of a given network element. C45 Short circuit current limit The maximum permissible short-circuit current within normal operation state of a given network element. C46 Dynamic stability limit A maximum permissible load ensuring the control of oscillations in the grid and avoiding the loss of synchronism. C47 Disconnection A timeseries describing disconnection of a TSO from a common platform. C48 Intended energy with positive price A timeseries concerning the amount of intended energy with prices higher than zero (and including zero). C49 Intended energy with negative price A timeseries concerning the amount of intended energy with prices lower than zero (excluding zero). C50 Decopuling A time series describing decoupling of an area. C51 Resource capacity unit A timeseries containing information about resource capacity units. C52 Resource entry capacity data A timeseries containing the resource capacity that can be allocated to an eligible resource capacity operator from another area. C53 Resource capacity obligation data A timeseries containing the resource capacity operator obligation to guarantee delivery. C54 Available energy A timeseries concerning the available energy. C55 Production curtailment A timeseries concerning the curtailment of production. C56 Rounding error A timeseries describing a rounding error. C57 Metered frequency The timeseries provides information about metered frequency. C58 Adjusted TTC to the nominal criteria The exchange program between two areas which guarantees that the Margin Available for Cross-Zonal Trade (MACZT) fulfils the nominal criteria at least on the most limiting Critical Network Element with Contingency (CNEC) which limits the transfer capacity. C59 Adjusted TTC to the nominal criteria with TSOs limitation The exchange program between two areas which allows the Margin Available for Cross-Zonal Trade (MACZT) on, at least, the most limiting Critical Network Element with Contingency (CNEC) to get closer to the nominal criteria fulfilment with a limited impact on the rest of the network. C60 Frequency deviation larger than standard deviation Total time in which the absolute value of the instantaneous frequency deviation was larger than the standard frequency deviation. C61 Frequency deviation larger than maximum deviation Total time in which the absolute value of the instantaneous frequency deviation was larger than the maximum instantaneous frequency deviation. C62 Frequency deviation not returned to 50% Number of events in which the absolute value of the instantaneous frequency deviation of the synchronous area exceeded 200 % of the standard frequency deviation as stated in SO GL (EU) regulation Art 131.1.a.vi. C63 Frequency deviation not returned to restoration range Number of events in which the absolute value of the instantaneous frequency deviation of the synchronous area exceeded 200 % of the standard frequency deviation. C64 Frequency deviation outside recovery range Number of events for which the absolute value of the instantaneous frequency deviation was outside of the frequency recovery range. – Page 23 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description C65 Frequency A time series describing measurement frequency. C66 Mean value A time series describing mean values. C67 Standard deviation A time series describing standard deviation. C68 Percentile A time series describing percentiles. C69 Measured frequency resolution A time series describing the resolution of a measured frequency. C70 Accuracy A time series describing measurement accuracy. C71 FRCE outside level 1 The number of time intervals in which the average value of the FRCE was outside the range Level 1 FRCE range as stated in SO GL. (EU) regulation Art 131.1.b.i. C72 FRCE outside level 2 The number of time intervals in which the average value of the FRCE was outside the range Level 2 FRCE range as stated in SO GL (EU) regulation. Art 131.1.b.i. C73 FRCE exceeded 60% The number of events for which the FRCE exceeded 60 % of the reserve capacity on of FRR capacity FRR as stated in SO GL (EU) regulation Art 131.1.b.ii. C74 FRCE exceeded The number of events for which the absolute value of the FRCE exceeded the steady state deviation maximum steady-state frequency deviation. C75 FRCE calculation and A time series describing how FRCE is calculated and its accuracy. accuracy descriptor C76 Forecasted capacity A time series describing forecasted capacity. C77 Minimum available capacity A time series describing minimum available capacity. C78 Average available capacity A time series describing average available capacity. C79 Maximum available capacity A time series describing maximum available capacity. C80 Frequency and accuracy descriptor A time series describing how system frequency and accuracy are determined. C81 Long-Term internal redispatch A time series describing long-term redispatch to relieve Scheduling Area internal congestion. C82 Other unavailability This is an unplanned unavailability. Not considered by market participants as a planned maintenance. C83 Faster than standard
FATBids that can support a �Full Activation Time� (FAT) that is faster than standard
FAT. Fast activation can be done for bids with activation time shorter than the minimum requirement for the standard product. When circumstances call for it, the TSO can order activation of such bids on a shorter notice. C84 Faster than standard deactivation time Fast deactivation can be done for bids with activation time shorter than the minimum requirement for the standard product. When circumstances call for it, the TSO can order activation of such bids on a shorter notice. C85 Slower than standard Bids that can support a Full Activation Time (FAT) that is slower than standard FAT.
CategoryType
3 codesA01Base
The auction is for a base period.
A02Peak
The auction is for a peak period.
A03Off peak
The auction is for an off peak period.
ClassificationType
1 codesA01Detail type
The Time Series content provides detailed information.
CodingSchemeType
8 codesEICThe coding scheme is the Energy Identification Coding Scheme (EIC), maintained by
ENTSO-E.
CGMThe coding scheme used for Common Grid Model Exchange Standard (CGMES).
A10Coding scheme which The coding schemes maintained by GS1.
are part of GS1 system NAD Andorra National coding scheme The National coding scheme of the country in question. NAL Albania National coding scheme The National coding scheme of the country in question. NAM Armenia National coding scheme The National coding scheme of the country in question. NAT Austria National coding scheme The National coding scheme of the country in question. NAZ Azerbaijan National coding scheme The National coding scheme of the country in question. NBA Bosnia and The National coding scheme of the country in question. Herzegovina National coding scheme NBE Belgium National coding scheme The National coding scheme of the country in question. NBG Bulgaria National coding scheme The National coding scheme of the country in question. NCH Switzerland National coding scheme The National coding scheme of the country in question. NCS Serbia and Montenegro National coding scheme The National coding scheme of the country in question. NCY Cyprus National coding scheme The National coding scheme of the country in question. NCZ Czech Republic National coding scheme The National coding scheme of the country in question. NDE Germany National coding scheme The National coding scheme of the country in question. NDK Denmark National coding scheme The National coding scheme of the country in question. NEE Estonia National coding scheme The National coding scheme of the country in question. – Page 26 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description NES Spain National coding The National coding scheme of the country in question. scheme
NFIFinland National
coding scheme The National coding scheme of the country in question. NFR France National coding scheme The National coding scheme of the country in question. NGB United Kingdom National coding scheme The National coding scheme of the country in question. NGE Georgia National coding scheme The National coding scheme of the country in question.
NGIGibraltar National
coding scheme The National coding scheme of the country in question. NGR Greece National coding scheme The National coding scheme of the country in question. NHR Croatia National coding scheme The National coding scheme of the country in question. NHU Hungary National coding scheme The National coding scheme of the country in question.
NIEIreland National
coding scheme The National coding scheme of the country in question.
NITItaly National coding
scheme The National coding scheme of the country in question. NKG Kyrgyzstan National coding scheme The National coding scheme of the country in question. NKZ Kazakhstan National coding scheme The National coding scheme of the country in question.
NLILiechtenstein National The National coding scheme of the country in question.
coding scheme NLT Lithuania National coding scheme The National coding scheme of the country in question. NLU Luxembourg National The National coding scheme of the country in question. coding scheme NLV Latvia National coding The National coding scheme of the country in question. scheme NMA Morocco National coding scheme The National coding scheme of the country in question. NMD Moldavia National coding scheme The National coding scheme of the country in question. NMK Macedonia National coding scheme The National coding scheme of the country in question. NNL Netherlands National coding scheme The National coding scheme of the country in question. NNN Nordic Regional coding scheme The coding scheme of the Nordic region which covers Denmark, Finland, Norway and Sweden. – Page 27 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description NNO Norway National coding scheme The National coding scheme of the country in question. NPL Poland National coding scheme The National coding scheme of the country in question. NPT Portugal National coding scheme The National coding scheme of the country in question. NRO Romania National coding scheme The National coding scheme of the country in question. NRU Russian Federation National coding scheme The National coding scheme of the country in question. NSE Sweden National coding scheme The National coding scheme of the country in question.
CoordinateSystemType
3 codesA01ED50
ED 50 (European Datum 1950) is a geodetic datum which was defined after World War II for the international connection of geodetic networks.
A02OSGB36
Ordinance Survey Great Britain 1936. The Ordinance Survey (OS) devised the national grid reference system, and it is heavily used in their survey data, and in maps (whether published by the Ordinance Survey or commercial map producers) based on those surveys.
A03WGS84
The World Geodetic System version 1984. for use in cartography, geodesy, and navigation including by GPS. It comprises a standard coordinate system for the earth, a standard spheroidal reference surface (the datum or reference ellipsoid) for raw altitude data, and a gravitational equipotential surface (the geoid) that defines the nominal sea level.
Contract Types
15 codesA01Daily contract
The condition under which capacity is allocated and handled is by daily auction or a daily transmission allocation procedure.
A02Weekly contract
The condition under which capacity is allocated and handled is by weekly auction or a weekly transmission allocation procedure.
A03Monthly contract
The condition under which capacity is allocated and handled is by monthly auction or a monthly transmission allocation procedure.
A04Yearly contract
The condition under which capacity is allocated and handled is by yearly auction or a yearly transmission allocation procedure.
A05Total contract
This is the sum of all capacity contract types for the period covered.
A06Long term contract
The condition under which capacity is allocated and handled is by long term trade agreements according to European regulations (EU Directive 1228/2003).
A07Intraday contract
The condition under which the capacity is allocated and handled is through an intraday auction and allocation process.
A08Quarter yearly
contract The condition under which capacity is allocated and handled is by quarter yearly auction or a quarter yearly transmission allocation procedure.
A09Semestrial contract
The condition under which capacity is allocated and handled is by half yearly auction or a half yearly transmission allocation procedure.
A10Multiple year contract The condition under which capacity is allocated and handled is by multiple year
auctions.
A11Intraday balancing
mechanism contract The condition under which the capacity is allocated and handled is through intraday energy balancing services.
A12Historical contract
A Contract established before the EU directive that are valid until the term of the contract.
A13Hourly contract
The condition under which capacity is allocated and handled is by hourly auctions.
A14First intraday auction The first intraday auction contract (IDA1).
contract
A15Second intraday
auction contract
CurrencyType
1 codesISKThe Legal tender of Iceland.
Icelandic krona LEK Albanian lek The Legal tender of Albania.
CurveType
4 codesA01Sequential fixed size
block The curve is made of successive Intervals of time (Blocks) of constant duration (size), where the size of the Blocks is equal to the Resolution of the Period.
A02Point
The curve is made of successive instants of time (Points). – Page 30 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
A03Variable sized Block
The curve is made of successive Intervals of time (Blocks) of variable duration (size), where the end date and end time of each Block are equal to the start date and start time of the next Interval. For the last Block the end date and end time of the last Interval would be equal to EndDateTime of TimeInterval.
A04Overlapping
breakpoint The curve is made of successive Intervals of time of variable duration (size), where the end date and end time of each interval are equal to the start date and start time of the next Interval.
DirectionType
3 codesUPUp signifies that the available power can be used by the Purchasing area to increase
energy.
DOWNDown signifies that the available power can be used by the Purchasing area to
decrease energy.
A03UP and DOWN
Up and Down signifies that the UP and Down values are equal.
FuelType
54 codesA01Unspecified
Fuel that cannot be associated with any of available fuel codes.
A02Renewable solid
unspecified Fuel produced in a solid form from renewable resources that cannot be associated with any of available renewable solid fuel codes.
A03Renewable solid
municipal waste Solid waste of biological material produced by households, hospitals and the tertiary sector (in general all waste that resembles household waste).
A04Renewable solid
industrial and commercial waste Solid waste generated by businesses, production units, bureaus and offices.
A05Renewable solid wood Solid wood energy resource.
– Page 32 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A06Renewable solid
animal fats Solid animal fats energy resource.
A07Renewable solid
biomass from agriculture Solid by-products and residues from agriculture.
A08Renewable liquid
unspecified Fuel produced in form of liquid from renewable resources that cannot be associated with any of available renewable liquid fuel codes.
A09Renewable liquid
municipal biodegradable waste Liquid municipal waste capable of undergoing anaerobic or aerobic decomposition.
A10Renewable liquid
black liquor Alkaline-spent liquor obtained from the digesters during the production of sulphate or soda pulp.
A11Renewable liquid pure Oil produced from plants, mainly from rapeseed and sunflower crops.
plant oil
A12Renewable liquid
waste plant oil Oil produced from plants that is no longer usable for its originally intended purpose.
A13Renewable liquid
refined vegetable oil Oil produced from plants and transformed into fuel by refining process (hydrocracking or hydrogenation).
A14Renewable gaseous
unspecified Fuel produced in form of gas from renewable resources that cannot be associated with any of available renewable gaseous fuel codes.
A15Renewable gaseous
landfill gas Gas produced by digestion of land filled waste.
A16Renewable gaseous
sewage gas Gas produced from the anaerobic fermentation of sewage sludge.
A17Renewable gaseous
agricultural gas Gas produced from agricultural processes.
A18Renewable gaseous
gas from organic waste digestion Gas produced by anaerobic digestion process from organic waste.
A19Renewable gaseous
process gas Gas produced by an industrial process as a consequence.
A20Renewable gaseous
other biogenic sources Gas produced by form of biogenic resource transformation that cannot be associated with any of available renewable gaseous fuel codes that use biogenic energy resource.
A21Renewable heating
and cooling solar Sunlight energy source.
A22Renewable heating
and cooling geothermal Geothermal energy source.
A23Renewable heating
and cooling aerothermal Thermal energy obtained from air.
A24Renewable heating
and cooling hydrothermal Thermal energy obtained from large body of water.
A25Renewable heating
and cooling process heat Thermal energy obtained from process heat. – Page 33 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A26Renewable
mechanical unspecified Energy from renewable resource transformed into mechanical energy that cannot be associated with any of available renewable mechanical fuel codes.
A27Renewable
mechanical wind Kinetic energy of wind transformed into mechanical energy.
A28Renewable
Falling or flowing water energy or energy derived from tidal movement, wave motion mechanical hydro and or ocean current. marine
A29Fossil unspecified
Unspecified fossil energy source.
A30Fossil solid
unspecified Unspecified fossil solid energy source.
A31Fossil solid hard coal Hard coal solid fossil energy source. This includes Anthracite, Bituminous coal,
Coking coal, Coke-oven coke and Lignite coke.
A32Fossil solid brown
coal Brown coal solid fossil energy source. This includes Sub -bituminous coal, Lignite, Brown coal briquette and Peat briquette.
A33Fossil solid peat
Solid fossil peat energy source.
A34Fossil solid municipal Solid fossil municipal waste energy source.
waste
A35Fossil solid industrial Solid fossil industrial and commercial waste energy source.
and commercial waste
A36Fossil liquid
unspecified
A37Fossil liquid crude oil Liquid crude oil fossil energy source. This includes shale oil or other types.
A38Fossil liquid natural
gas liquids (NGL) Liquid natural gas liquids (NGL) fossil energy source.
A39Fossil liquid
petroleum products Liquid petroleum products energy source. This includes Ethane,Naphtha, Aviation gasoline , Motor gasoline, Aviation turbine fuel,Other kerosene,Gas/diesel oil , Fuel oil, low sulphur ,Fuel oil, high sulphur ,Liquid Petroleum Gas , Orimulsion , Bitumen ,Lubricants ,Petroleum coke , Refinery Feedstock.
A40Fossil gaseous
unspecified Unspecified fossil gaseous energy source.
A41Fossil gaseous
natural gas Fossil gaseous natural gas energy source.
A42Fossil gaseous coalderived gas
Fossil gaseous coal-derived gas energy source. This includes Blast furnace gas,Coke-oven gas or other types.
A43Fossil gaseous
petroleum products Fossil gaseous petroleum products energy source. This includes Propane, Butane, Refinery gas, Chemical waste gas or other types.
A44Fossil gaseous
municipal gas plant Fossil gaseous municipal gas plant energy source.
A45Fossil gaseous
process gas Fossil gaseous process gas energy source. This includes Carbon monoxide, Methane , Hydrogen (fossil sourced) ,Phosphor gas ,Oxy gas and other types.
A46Fossil heat
unspecified Unspecified fossil heat energy source.
A47Fossil heat process
heat Fossil process heat energy source. Unspecified fossil liquid energy source. – Page 34 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A48Nuclear solid
radioactive fuel Solid Nuclear radioactive energy source. This includes UOX, AGR, MOX or other types.
A49Gas synthesis
unspecified Unspecified gas synthesis energy source.
A50Gas synthesis furnace Gas synthesis from furnace gas energy source.
gas
A51Waste heat and cold
unspecified Unspecified Waste heat and cold energy source.
A52Waste heat and cold
By-product in industrial installation Waste heat and cold from by-product in industrial installation energy source.
A53Waste heat and cold
By-product in power generation Waste heat and cold from by-product in power generation energy source.
A54Waste heat and cold
By-product in tertiary sector Waste heat and cold from by-product in tertiary sector energy source.
HVDCModeType
2 codesA01Setpoint schedule
The code for the "power setpoint" mode of operation of the HVDC link.
A02Proportional external
signal The code for the "Proportional external signal" mode of operation of the HVDC link.
IndicatorType
1 codesYESA positive indication.
Document Types
149 codesA01Balance responsible
schedule A schedule which has been prepared by a balance responsible party providing planned schedule information.
A02Allocated capacity
schedule A schedule which has been prepared by a capacity allocator providing allocated capacity.
A03Balance area schedule A schedule that provides the planned schedule information for a balance area.
A04System Operator area
schedule A compilation of all external schedules concerning two System Operator areas or a connector concerning two System Operator of all balance responsible parties.
A05Control block area
schedule A compilation of all the exchange programs of all control areas for one control block with all neighbouring control areas of a neighbouring control block.
A06Coordination center
area schedule A compilation of the exchange programs of all exchange blocks divided into UCTE south and north.
A07Intermediate
confirmation report An intermediate confirmation report that may be produced between final cutoffs.
A08Final confirmation
report A final confirmation report that is produced after a final cutoff.
A09Finalised schedule
A compilation of a set of schedules that have been finalized after a given cutoff.
A10Regulation data report
A compilation of the time series employed on a given day to ensure the balance of the system.
A11Aggregated energy
data report A compilation of the time series of all the meter readings or their equivalent for a given period.
A12Imbalance report
The report containing the complete situation of a given period for a party and including the schedules, regulation data and actual or calculated readings.
A13Interconnection
Capacity Document for cross-border capacity exchanges.
A14Resource Provider
Resource Schedule A document providing the schedules for resource objects submitted by a resource provider.
A15Acquiring System
Operator Reserve Schedule A document providing reserve purchases submitted by an Acquiring System Operator.
A16Anomaly Report
A document providing anomaly information for the receiving party to correct.
A17Acknowledgement
Document A document providing acknowledgement information.
A18Confirmation report
A document providing confirmation information.
A19Capacity for Resale
A document providing information about capacity for resale.
A20Approved Capacity
Transfer A document to approve a capacity transfer. – Page 36 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A21Capacity transfer
notification A document notifying a capacity transfer.
A22Transmission rights
portfolio A document providing the portfolio of the transmission capacity rights of a market participant.
A23Allocations
A document providing the capacity allocations for a border.
A24Bid document
A document providing bid information.
A25Allocation result
document A document providing the allocation results of an auction.
A26Capacity document
A document providing capacity information.
A27Rights document
A document providing transmission capacity rights information.
A28Generation availability
schedule This document contains information related to energy availability.
A30Cross border schedule This document contains the cross border schedules for all the borders of a given
country where energy is exchanged.
A31Agreed capacity
The capacity agreed between parties.
A32Proposed capacity
The capacity proposed for agreement between parties.
A33System vertical load
The sum of all flows out of the transmission grid via directly connected transformers and lines to distribution grids and end consumers as known by the System Operator.
A34Escalation document
A document which requesting the escalation of a situation.
A35Trouble shooting
document A document providing trouble shooting information for the resolution of a problem.
A36Deactivation document A document providing deactivation information.
A37Reserve tender
document The document that is used for the tendering for reserves within the ERRP process.
A38Reserve Allocation
Result Document The document used to provide the results of a Reserve auction.
A39SATCR activation
The document is used to provide the activation of reserves through the SATCR process.
A40DATCR activation
The document is used to provide the activation of reserves through the DATCR process.
A41Activation response
The document is used to provide a response to a request to activate reserves.
A42Tender reduction
The document is used to provide information concerning the reduction of a previously submitted tender.
A43MOL Document
The document is used to provide Merit Order List information.
A44Price Document
The document is used to provide market price information.
A45Measurement Value
Document The document is used to provide measurement information from measurement devices.
A46SOAM Document
The document is used to provide system operator accounting data for matching.
A47SOVA Document
The document is used to provide system operator validated accounting data.
A48CCVA Document
The document is used to provide coordination center validated accounting data.
A49Daily settlement
document The document is used to provide daily settlement information. – Page 37 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A50Weekly settlement
document
A51Capacity Auction
The document is used to provide capacity auction specification information. Specification Document
A52Market Coupling
Results Document The document is used to provide the results of a market coupling auction.
A53Outage publication
Document The document is used to provide the outage information for publication.
A54Forced generation
outage Document A document providing information on forced generation outages.
A55Summarised Market
Schedule A compilation of all external schedules concerning two Market Balance Areas of all balance responsible parties.
A56Compensation Program A schedule that provides the schedule information for the compensation of
Schedule unintended deviation.
A57Load Frequency
Control Program Schedule
A58Timeframe Independent A compilation of all external Timeframe Independent Schedules concerning two
Schedule System Operators.
A59Information request
A60status request for a
A status request concerning the position of an object independently of any ongoing position independently processes. from a specific process
A61Estimated Net Transfer The estimated net transfer capacity for a given border.
Capacity
A62Compensation rights
The capacity rights that have been allocated as compensation.
A63Redispatch notice
A notice to confirm the actions agreed between System Operators to resolve a congestion situation through redispatch.
A64Tender reduction
response A response to a tender reduction request that provides corrections to the initial document.
A65System total load
Total load', including losses without power used for energy storage, is equal to generation deducted with exports, added with imports and deducted with power used for energy storage.
A66Final MOL
A document providing the information concerning the situation of the MOL at the end of an activation period.
A67Resource Provider
A document providing the schedules for production/consumption for resource Schedule for objects submitted by a resource provider. production/consumption
A68Installed generation per A document providing the installed generation per generation type.
type
A69Wind and solar forecast A document providing the forecast of wind and solar generation.
A70Load forecast margin
A document providing the load forecast margin for a period.
A71Generation forecast
A document providing the generation forecast for a period.
A72Reservoir filling
information A document providing information concerning the filling of reservoirs. The document is used to provide weekly settlement information. A schedule that provides the schedule information for the Load Frequency Control Program of a Control Area or a Control Block. An information request being made concerning some specific information. – Page 38 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A73Actual generation
A document providing the actual generation for a period.
A74Wind and solar
generation A document providing the generation of wind and solar energy for a period.
A75Actual generation per
type A document providing the actual generation per generation type for a period.
A76Load unavailability
A document providing the unavailability of units providing load on the network.
A77Production
unavailability A document providing the unavailability of production units providing energy to the network.
A78Transmission
unavailability A document providing the unavailability of transmission capacity on the network.
A79Offshore grid
infrastructure unavailability A document providing the unavailability of an offshore grid infrastructure to the network.
A80Generation
unavailability A document providing the unavailability of generation units providing energy to the network.
A81Contracted reserves
A document providing the reserves contracted for a period.
A82Accepted offers
A document providing the offers of reserves that have been accepted for a period.
A83Activated balancing
quantities A document providing the quantities of reserves that have been activated for balancing.
A84Activated balancing
prices A document providing the prices of the reserves that have been activated for balancing.
A85Imbalance prices
A document providing the prices of reserves due to imbalance for a period.
A86Imbalance volume
A document providing the volume of the imbalance for a period.
A87Financial situation
A document providing the financial situation for reserves.
A88Cross border balancing A document providing the cross border balancing requirements for a period.
A89Contracted reserve
prices A document providing the price of reserves contracted for a period.
A90Interconnection
network expansion A document providing information on the expansion of the interconnection network.
A91Counter trade notice
A document providing information on counter trades for a period.
A92Congestion costs
A document providing the cost of congestion for a period.
A93DC link capacity
A document providing the DC links for a period.
A94Non EU allocations
A document providing allocations made to non EU member states.
A95Configuration document A document providing configuration information.
A96Redispatch activation
document A document enabling the activation of a redispatch notice.
A97Detailed activation
history document A document enabling a detailed history of activations.
A98Aggregated activation
history document A document enabling an aggregated history of activations.
A99HVDC Link constraints A document providing the information concerning the maximum and minimum active
power flow through each link can limited. – Page 39 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B01HVDC Configuration
A document providing the information concerning the power set point. The mode in which the HVDC is managed.
B02HVDC Schedule
A document providing the information for operating DC links.
B03EIC code request
A document providing the information requesting a new EIC code.
B04EIC code information
A document providing EIC information in a central registry exchange or information to an EIC participant.
B05EIC code publication
A document providing EIC publication information in a web site publication of a limited set of information.
B06Critical network
element determination A document providing all the elements necessary for the capacity coordinator to determine the transfer capacity and the associated critical network elements.
B07Critical network
element publication A document providing all the elements necessary for the market information aggregator and TSOs to know the critical network elements which limit the transfer capacity.
B08Flow based domain
A document providing the capacity domain and its limits available for the TSO.
B09Flow based domain
publication A document providing the capacity domain and its limits available for the market.
B10Flow based domain
market impact publication A document providing the capacity domain and its impacts on the market to be published.
B11Anonymized flow based A document providing all the relevant flow based parameters in case of flow based
parameters publication capacity allocation.
B12Critical network
A document providing the critical network elements and its impacts on the market to element market impact be published. publication
B13Weather document
An estimation or prediction in advance of the weather by analysis of meteorological data and the results of what actually happened with the weather.
B14Energy prognosis
document A document to provide the prognosis of energy production/load for a given period.
B15Network constraint
document A document providing the network constraint situations used for the load flow studies. A network constraint situation includes contingencies, monitored elements and remedial actions.
B16Aggregated netted
external market schedule document A document used to report aggregated netted external market schedules for a given border.
B17Aggregated netted
A document used to report aggregated netted external TSO schedules for a given external TSO schedule border. document
B18Reporting status
market document A document used to report the status of aggregated netted external market schedules, aggregated netted external TSO schedules and compensation program schedules on a given border.
B19Reporting information
market document A document used to report the information concerning aggregated netted external schedules, aggregated netted external market schedules, aggregated netted external TSO schedules, compensation program schedules, netted area position schedules and netted area AC position schedules to an interested party.
B20Status request for a
reporting information market document A document requesting the provision of a reporting information document. – Page 40 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B21Reserve need
document Used by a TSO to send its reserve needs.
B22Generation and load
shift keys document A document providing the values of the generation and load shift keys to be used on network model.
B23Offers to be activated
A document containing the outcome of the process, with the list of offers that are to be activated by the TSO concerned and the results for its reserve needs.
B24Clearing price
A document containing the outcome of the process, with the clearing prices for a period.
B25Security analysis report A document providing a report on a performed security analysis.
B26Aggregated netted
external schedule document
B27External TSO schedule A document used to report external TSO schedules for a given border or
interconnector.
B28Move of scheduled
production A document indication a move of scheduled production.
B29PS&LC results
document A document providing Pole Splitting & Loss Calculation results.
B30Notification data market A document used to notify data to any information receiver.
document
B31Additional Constraint
document A document describing additional constraints for a capacity calculation process.
B32Operational state
document A document used for exchanging operational states for grid assets.
B33Published offered
capacity A document providing the most recent values of offered capacity.
B34Market result document Published prices and volumes
B35Area Configuration
document A document containing the definition of areas.
B36Area Composition
document A document containing the relations between areas, i.e which Metering Grid Areas a Bidding Zone composed of.
B37Connected Areas
document A document containing which other areas an area is connected to i.e. which Metering Grid Areas a Metering Grid Area is connected to.
B38Settlement document
A document providing settlement information.
B39Imbalance prognosis
document A document to provide the prognosis of energy imbalances for a given period.
B40Complete set of bids
Submission of complete set of bids. If there are existing bids, they should be replaced.
B41Merged MOL notice
A notice providing information on the MOL merging process.
B42K-factor document
A document providing K-factor values.
B43Settlement coordination A document providing settlement information for coordination between different
document parties.
B44Financial settlement
document A document used to report aggregated netted external schedules for a given border. A document providing financial settlement information. – Page 41 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B45Bid availability
document A document providing the detailed reasons for changing the availability or volume of a bid.
B46Resource capacity unit A document providing information about resource capacity units.
document
B47Other market
information A document providing other market information.
B48Permission document
A document that contains detailed information about permissions.
B49Requested capacity
A document providing requested capacity (e.g. ATC, CZCL) value.
B50Voltage control
activation document A document providing the number of generating units to activate for voltage control, by means of their operation in synchronous condenser mode.
B51Transmission inventory A document providing a transmission inventory.
document
Market Product Types
11 codesA01Standard balancing
product A harmonised balancing product defined by all TSOs for the exchange of balancing services.
A02Specific balancing
product A product different from a standard product.
A03Product from
From the EBGL Article 2 (19), means an iterative process that uses at least integrated scheduling integrated scheduling process bids that contain commercial data, complex technical process data of individual power generating facilities or demand facilities and explicitly includes the start-up characteristics, the latest control area adequacy analysis and the operational security limits as an input to the process.
A04Local balancing
product A balancing product that is neither standard nor specific. This type may be applicable only in the interim period until standard and specific products have been defined within the given scheduling area.
A05Standard mFRR
product eligible for scheduled activation Standard mFRR product eligible for scheduled activation.
A06Standard mFRR
product eligible for direct activation Standard mFRR product eligible for direct activation.
A07Standard mFRR
product eligible for direct and scheduled activation Standard mFRR product eligible for direct as well as scheduled activation.
A08Market wide resource This is a market-wide resource capacity mechanism where all resource capacity
capacity mechanism required to ensure security of supply receives payment. These mechanisms are open for participation to all capacity resources contributing to adequacy. – Page 42 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A09Strategic reserve
resource capacity mechanism This is a market resource capacity mechanism that is kept outside of the electricity market and only used if the market participants do not offer enough generation to meet short-term demand.
A10Other resource
capacity mechanism This is any other kind of market resource capacity mechanism.
A11Fast activation
product The fast activation product shall be considered as a fall -back solution for situations where coordination with all parties is no longer possible due to insufficient time and the regular product could not be properly applied.
ObjectAggregationType
15 codesA01Area
The object being described concerns an area.
A02Metering point
The object being described concerns a metering point.
A03Party
The object being described concerns a party.
A04Agreement
Identification The object being described concerns an agreement identification.
A05Accounting point
The object being described concerns an accounting point.
A06Resource Object
The object being described concerns a resource object.
A07Tieline
The object being described concerns a tieline.
A08Resource type
The object being described concerns a resource type.
A09DC link
The object being described concerns a DC link.
A10AC link
The object being described concerns an AC link.
A11Merchant line
The object being described concerns a merchant line.
A12Bidding zone
The largest geographical area within which market participants are able to exchange energy without capacity allocation.
A13Virtual bidding zone
A non-geographical bidding zone to be able to apply extra constraints to Bidding Zones.
A14Metering grid area
A physical area where consumption, production and exchange can be measured. It is delimited by the placement of meters for continuous measurement for input to, and withdrawal from the area.
A15Scheduling area
An area within which the TSOs' obligations regarding scheduling apply due to operational or organisational needs.
PaymentTermsType
2 codesA01Pay as bid
The amount to be paid shall correspond to the amount bid.
A02Pay as cleared
The amount to be paid shall correspond to the amount calculated for clearing.
PriceCategoryType
7 codesA01Category 1
A category one price calculation is to be applied.
A02Category 2
A category two price calculation is to be applied.
A03Category 3
A category three price calculation is to be applied.
A04Excess balance
The category concerns excess balance.
A05Insufficient balance
A category concerns insufficient balance.
A06Average bid price
The average bid price for a given product.
A07Single marginal bid
price The downwards activated bid price or the upwards activated bid price for activated balancing reserves.
PriceComponentType
2 codesA01Scarcity
A scarcity component to be used in nationally defined scarcity situations.
A02Incentive
An incentive component to be used to fulfil nationally defined boundary conditions.
PriceDirectionType
1 codesA01Expenditure.
Expenditure, i.e. the Impacted Area System Operator pays to the internal Market Parties.
Process Types
74 codesA01Day ahead
The information provided concerns a day ahead process.
A02Intra day incremental The information provided concerns an intra day schedule.
A03Inter-area transit
The information provided concerns an inter area transit schedule. The rules governing this process are market dependent
A04System operation
closure The information provided concerns the closure of a given period of both scheduled and regulation information.
A05Metered data
aggregation The information provided concerns the aggregation process of metered information.
A06Imbalance settlement The information provided concerns the imbalance settlement for a given period for a
balance responsible party or parties.
A07Capacity allocation
A08Central reconciliation The process carried out to finalise the imbalance settlement based on actual metered
values against provisional values from profiled metering points.
A09Released capacity
allocation The process concerns the notification of capacity rights that are being released.
A10Proposed capacity
allocation The process concerns the proposed capacity to be allocated for a given border.
A11Agreed capacity
allocation The process concerns the capacity that has been agreed for allocation for a border.
A12Long term
The process concerns scheduling all schedules except daily and intraday contracts.
A13Post scheduling
adjustment The process concerns the adjustments made to previous schedules after the period of execution.
A14Forecast
The data contained in the document are to be handled in short, medium, long term forecasting process. The information provided concerns the capacity allocation process. – Page 45 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A15Capacity
determination The process of determining the capacity for use.
A16Realised
The process for the treatment of realised data as opposed to forecast data.
A17Schedule day
The process concerns the day ahead, intraday and eventually ex -post scheduling in a single document. The schedule will be transferred within the total position including historic information.
A18Intraday total
This process concerns an intraday schedule which contains the accumulated day ahead and intraday current position.
A19Intraday accumulated This process concerns a single intraday schedule process where only intraday
evolutions occur through version changes.
A20SOMA process
System Operator meter alignment process.
A21SOVM process
System Operator validated measurement process.
A22RGCE accounting
process The document provides ENTSO-E Regional Group Continental Europe accounting process information.
A23CCSR RGCE
Settlement The process concerns the control center settlement report for the whole of the ENTSO-E Regional Group Continental Europe.
A24CBSR Settlement
The process concerns the control block settlement report.
A25CASR Settlement
The process concerns the control area settlement report.
A26Outage information
The process concerns TSO publication of outages on its power system.
A27Reserve resource
process The process being described is for general reserve resources.
A28Primary reserve
process The process being described is for primary reserves.
A29Secondary reserve
process The process being described is for secondary reserves.
A30Tertiary reserve
process The process being described is for tertiary reserves.
A31Week ahead
The process being described is for the week ahead.
A32Month ahead
The process being described is for the month ahead.
A33Year ahead
The process being described is for the year ahead.
A34Contracted
The process being described is for contracted information.
A35Network information
The process being described is for network information.
A36Creation
The process being described is for the creation of information.
A37Modification
The process being described is for the modification of information.
A38Deactivation process
The process being described is for deactivation of information.
A39Synchronisation
process The process being described is for the synchronisation of information.
A40Intraday process
The process being described is for intraday process.
A41Redispatch process
The process being described is for redispatch activation.
A42Activation history
process The process being described is for the provision of an activation history. – Page 46 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
A43Flow based domain
constraint day-ahead The information provided concerns the flow-based process in day ahead.
A44Flow based domain
constraint intraday The information provided concerns the flow-based process in intraday.
A45Two days ahead
Two days ahead.
A46Replacement reserve A process being described is for replacement reserves (RR) to restore or support the
required level of frequency restoration reserves.
A47Manual frequency
restoration reserve A process being described is for manual frequency restoration reserves (mFRR).
A48Day-ahead capacity
determination The process run at the day-ahead timeframe to determine the capacity for use.
A49Intraday capacity
determination The process run at the intraday timeframe to determine the capacity for use.
A50Long term capacity
determination The process run at the long term timeframe to determine the capacity for use.
A51Automatic frequency
restoration reserve A process being described is for automatic frequency restoration reserves (aFRR).
A52Frequency
containment reserve A process being described is for frequency containment reserves (FCR).
A53Common Grid Model
(CGM) merging process The process for merging individual grid models to form the common grid model.
A54Coordinated security
analysis The process being described is used for coordinated security analysis.
A55Exchange of master
data A process for exchanging master data.
A56Frequency restoration The process being described is for general frequency restoration reserve.
reserve
A57FSKAR settlement
The information provided concerns the Financial Settlement of K?f, ACE and ramping period settlement for a given period.
A58mFRR capacity
market Processes related to the Reserve option market to assure that there are enough available reserves for the manual FRR market.
A59Internal trade
reporting The process related to internal trade reporting.
A60Scheduled activation
mFRR mFRR being subject to scheduled activation.
A61Direct activation
mFRR mFRR being subject to direct activation.
A62Registration
A process related to the registration and management of object information.
A63Imbalance Netting
The process described is for imbalance netting.
A64Criteria application for The process describes criteria application for instantaneous frequency.
instantaneous frequency
A65Criteria application for The process describes criteria application for frequency restoration.
frequency restoration – Page 47 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A66Cost sharing
The process describes the cost sharing process for costly remedial actions.
A67Central selection
aFRR aFRR subject to central selection of bids for activation.
A68Local selection aFRR aFRR subject to local selection of bids for activation.
A69Common grid model
alignment The process for aligning bidding zone net positions.
A70Pan-European
verification function The process for verifying bidding zone net positions.
A71Outage planning
coordination The process being described is used for outage planning coordination.
A72Short term adequacy
The process being described is used for short term adequacy calculations.
A73Coordinated capacity The process being described is used for coordinated capacity calculation.
calculation
A74Access to metered
data Access to meter readings of electricity consumption from or electricity feed into the grid.
QualityType
5 codesA01Adjusted
The contents of the object have been adjusted.
A02Not available
The contents of the object are not available.
A03Estimated
The contents of the object are estimated. The code is typically used when measured values are missing and an estimate is made based on historical data.
A04As provided
The contents of the object are as provided.
A05Incomplete
The contents of the object are calculated based on incomplete data.
Reason Codes
160 codesA01Message fully
accepted
A02Message fully rejected No part of the message has been accepted for application processing, e.g. Global
position incomplete.
A03Message contains
errors at the time series level
A04Time interval incorrect The schedule time interval is not within the contractual agreement or the period does
not agree with the schedule time interval.
A05Sender without valid
contract The sender has no current valid contract with the TSO. The message consequently will be fully rejected.
A06Schedule accepted
The schedule of the recipient as presented has been completely accepted.
A07Schedule partially
accepted The schedule of the recipient as presented has been partially accepted. It is necessary to look at the time series level to determine the changes (time series rejected, modified, etc.).
A08Schedule rejected
The schedule of the recipient as presented has been totally rejected. The cause could be the non presentation of a counter part for the involved trades.
A09Time series not
matching Time series mismatches.
A10Credit limit exceeded The contractual credit limit has been exceeded and as such the message has been
rejected.
A20Time series fully
rejected
A21Time series accepted The time series has been accepted but some time interval quantities have been
with specific time rectified or zeroed out. interval errors
A22In party/Out party
invalid There is no contract for the parties indicated or the rules for cross border nominations are not being respected. The time series has been rejected.
A23Area invalid
The area is unknown or not allowed. The time series has been rejected.
A24This code is no longer applicable.
A25This code is no longer applicable.
A26Default time series
applied The time series has been rejected and replaced with a default time series profile. This reason code may not be used in conjunction with A30.
A27Cross border capacity The cross border capacity has been exceeded. The time series has been rejected or
exceeded adjusted.
A28Counterpart time
series missing The message has been fully accepted for application processing. Part of the message contents, i.e. certain time series, has been accepted for application processing. It is necessary to look at the time series level to determine the time series that have been rejected. The time series is excluded from the global position. The time series has been fully rejected. In the case of a confirmation report, this reason code is used in conjunction with either A26 or A30. This provides an indication that the time series has not got a counterpart time series. In the case of an Intermediate Confirmation Report this is advising the recipient that the time series may be rejected at nomination closure if the counterpart time se ries is not received. In the case of a Final Confirmation Report this is informing the recipient that the time series has been rejected because the counterpart time series has not been forthcoming. – Page 49 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A29Counterpart time
series quantity differences The time series has been rejected as it does not match that of the counterpart who is considered by market rules to be correct.
A30Imposed Time series
from nominated party's time series (party identified in reason text) The nominated party's time series has replaced the current time series. This reason code may not be used in conjunction with A26.
A41Resolution
inconsistency The resolution is not coherent with the time interval, or resolution not valid.
A42Quantity
inconsistency The quantity is not coherent. For example a time period with the same version number but different quantities or an non permitted number of digits after the decimal point, etc.
A43Quantity increased
The quantity has been increased in order to satisfy minimum constraints.
A44Quantity decreased
The quantity has been decreased in order to satisfy congestion constraints.
A45Default quantity
applied The default quantity has been applied as the current quantity does not satisfy contractual obligations.
A46Quantities must not
be signed values The quantity proposed is illegal since signed values are only permitted in specific circumstances.
A47This code is no longer applicable.
A48Modification reason
In an intraday transmission, the reason for the modification is as follows (in the reason text).
A49Position inconsistency A position is missing or too many.
A50Senders time series
version conflict
A51Message identification The message identification is already in the receiving system. Or a higher version
or version conflict already exists. Message rejected.
A52Time series missing
from new version of message A time series is not contained in a new version of the message. Message rejected.
A53Receiving party
incorrect The receiving party is incorrect. Message rejected.
A54Global position not in The message does not balance out to zero. Market rules might require that the
balance message is rejected.
A55Time series
identification conflict The identification of the time series is duplicated or incorrect. Time series will be rejected.
A56Corresponding Time
series not netted All corresponding time series must be netted. Time series rejected.
A57Deadline limit
exceeded/Gate not open The deadline for receiving schedule messages has passed. Message or time series rejected.
A58One to one
nomination inconsistency There is a one to one nomination inconstancy with the in/out parties or areas. Time series rejected.
A59Not compliant to local The level in which this is identified is not in compliance with local market rules. The
market rules level in question has been rejected. There is an error in the sender time series version, i.e. it could be superior to the message version or is inconsistent with the existing data. The time series has been rejected. – Page 50 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
A60Inter-area transit
schedule exceeds nominated schedule The inter-area transit schedule exceeds the nominated schedule for the same time interval. The inter-area transit schedule is rejected.
A61Currency invalid
The currency is not in compliance with ISO 4217.
A62Invalid business type
The business type does not belong to the valid set of business types for the process in question.
A63Time Series modified The time series has been modified.
A64Resource Object
Invalid The Resource Object defined in the document is not valid.
A65Reserve object
Technical limits exceeded Reserve objects aggregated values are not within technical/prequalified limits
A66Planned reserves do
not correspond with contractual data Planned reserves do not correspond with contractual data.
A67Limit Data is not
available Limit Data is not available.
A68Reserve Object not
qualified for reserve type Reserve Object is not qualified for reserve type.
A69Mandatory attributes
missing Mandatory attributes missing.
A70Curtailment
The capacity in question has been curtailed.
A71Linked bid rejected
The bid in question has been rejected because an associated bid has been due to associated bid unsuccessful. unsuccessful
A72Original bid divided to The original bid quantity has been divided to enable it to be accepted.
permit acceptance
A73Bid accepted
The bid in question has been accepted.
A74Auction Status
The information in the Reason Text provides auction status information.
A75Right status
information The information in the Reason Text provides status information concerning the transmission rights in question.
A76Agreement
identification inconsistency There is an inconsistency between the contract type and the agreement identification.
A77Dependency matrix
not respected There is an inconsistency between the document contents and the dependency matrix.
A78Sender identification
and/or role invalid The identification of the sender or the sender/role combination is invalid.
A79Process type invalid
The process type does not figure in the list of valid process types for this document.
A80Domain invalid
The domain does not figure in the list of valid domains for this document and process.
A81Matching period
invalid The period is not within the expected limits.
A82In/Out area
inconsistent with domain The in and out area does not figure within the domain specified. – Page 51 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A83Disagree with
matching results
A84Confirmation ignored The report has been ignored since a higher version has been received.
due to higher version already received
A85Confirmation without
adjustment (time series have been matched without change) The report has been successfully matched without any changes.
A86Confirmation with
adjustment (time series have been modified) The report has been matched but required adjustment.
A87For action (only in
The report in question is only for action in an intermediate stage. intermediate confirmation - time series need mutual agreement and action)
A88Time series matched
The time series has been successfully matched.
A89Time series ignored
(note: this can only apply to time series that are set to zero see matching principles) The time series has been ignored and not matched since it does not figure in a counterparty transmission. All are correctly equal to zero.
A90Modification proposal The document is a proposal for change before finalization.
(intermediate confirmation)
A91Expected document
not received
A92Not possible to send The document that is due cannot be transmitted within the required timeframe. An
document on time, but estimated time of transmission is provided. estimated delivery time is provided
A93Not possible to send
document on time, and furthermore no expected time of return to normal situation The document that is due cannot be transmitted within the required timeframe. The time of transmission of the document is unknown.
A94Document cannot be
processed by receiving system The receiving system cannot process that document in question.
A95Complementary
information Additional text is provided in order to further explain a condition, for example to provide details of an outage.
A96Technical constraint
A technical constraint has been applied.
A97Force majeure
curtailment Curtailment due to Force Majeure. A code that enables the identification of the curtailment reason for settlement purposes.
A98Network security
curtailment Curtailment due to network security reasons A code that enables the identification of the curtailment reason for settlement purposes.
A99Auction cancelled
The auction has been cancelled. The matching results provided are not consistent. The document that is expected has not been received within the expected timeframe. – Page 52 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B01Incomplete document The document is incomplete and cannot be processed.
B02Accounting Point (tie- The document is incomplete as a time series for an accounting point is missing.
line) Time Series missing
B03Meter data Time
series missing The document is incomplete as a time series for meter data is missing.
B04Estimated values not
allowed in first transmission The document is in its initial form and estimated values are not allowed.
B05No quantity values
allowed for a quality that is not available No quantity values are allowed for a quality that is not available.
B06Time series accepted Time series accepted.
B07Auction without bids
being entered
B08Data not yet available It is not possible to perform the necessary action since the required data for this
action is not yet available.
B09Bid not accepted
B10Initiator area problem The problem concerns the initiator area.
B11Cooperating area
problem
B12Communication status The status within the system indicates that the communication capability is currently
currently active active.
B13Communication status The status within the system indicates that the communication capability is currently
currently inactive inactive.
B14Communication status The status within the system indicates that the communication capability is currently
currently restricted restricted.
B15Problem associated
with both areas
B16Tender unavailable in A tender that has been requested is no longer available in the MOL.
MOL list
B17Price based on
The price is based on a preliminary exchange rate. preliminary exchange rate
B18Failure
A failure has occurred.
B19Foreseen
maintenance Maintenance is foreseen.
B20Shutdown
A shutdown has occurred.
B21Official exchange rate The official exchange rate has been approved.
approved
B22System regulation
B23Frequency regulation The information provided regards a regulation for frequency purposes.
B24Load flow overload
The auction has terminated without any bids being submitted. The ReasonText may provide the identification of the auction in question. The bid in question has not been accepted. The problem concerns the cooperating area. The problem concerns both areas. The information provided regards a regulation for system purposes. Situation in the grid, where loading of a certain grid element, e.g. overhead line, is above defined technical limits. – Page 53 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B25Voltage level
adjustment A TSO activity to maintain an acceptable voltage profile throughout the network. This is achieved by balancing of the respective reactive power requirements of the network and the customers.
B26Emergency situation
curtailment Curtailment due to emergency situation. A code that enables the identification of the curtailment reason for settlement purposes.
B27Calculation process
failed The calculation has not been performed.
B28No capacity constraint The market position is such as no capacity constraint is applied to limit the cross
impact on the market border exchanges.
B29Special Condition
Special condition need to be fulfilled.
B30Unverified
Missing or not validated data.
B31Verified
Data has successfully passed the verification process.
B32CGM inconsistency
Describes an element which was not found in the CGM.
B33Network dictionary
inconsistency Describes an element which was not found in the network dictionary.
B34Capacity reduced by
TSODescribes a capacity that was reduced by a TSO.
B35Overload
Describes an N-k or N state overload.
B36GLSK limitation
Describes a situation in which there is not enough power adjustment in the GLSK file to cover the capacity.
B37Voltage constraint
Describes an N-k or N state voltage violation.
B38Angle constraint
Describes an N-k or N state angle violation.
B39Stability
Describes a situation in which the dynamic behaviour of the network violated.
B40Loadflow divergence
Describes a network situation in which the provided capacity values are part of a load flow divergence situation.
B41Exclusion for SoS
reasons This is the adjustment applied to the capacity of a branch to have a minimum RAM (Remaining Available Margin) available for commercial exchanges.
B42Constraint by the
market A constraint due to market restrictions.
B43Ordinary
The contingency is ordinary (methodology for coordinating operational security analysis, article 6).
B44Exceptional
The contingency is exceptional (methodology for coordinating operational security analysis, article 6).
B45Out of range
The contingency is out of range (methodology for coordinating operational security analysis, article 6).
B46Internal congestion
A temporary congestion within a bidding zone or scheduling area.
B47Operational security
constraints Operational security constraints identified by TSOs.
B48Estimated value
Describes a situation where a calculation process has failed and extrapolated or interpolated values will be applied.
B49Balancing
Activated for balancing purposes.
B50Values shared
Values of this time series are also valid for counter -party.
B51Outside price limits
The offered price is not within the valid limits. – Page 54 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
B52Previous timeframe
data In case of processing issue, sent data are based on the previous timeframe.
B53MOL merging
succesful The merging of the Merit Order List has been successfully processed.
B54MOL merging failed
The merging of the Merit Order List has failed.
B55Because of
redispatching Because of redispatching according to Article 2(26) of Commission Regulation (EU) 543/2013
B56Because of
countertrading Because of countertrading according to Article 2(13) of Commission Regulation (EU) 543/2013
B57Because of other
remedial action Not available because of any remedial action.
B58Insufficiency of
reserves The reserve capacity is not sufficient.
B59Unavailability of
The unit providing the reserve is subject to technical unavailability. reserve providing unit
B60Unavailability of
automatic protection systems
B61Physical cable or
Limitation due to physical cable or converter restrictions. converter restrictions
B62Constraints in
controller systems Limitation due to constraints in controller systems.
B63Adjusted because of
expected violation of operational security The capacity is adjusted because of an expected violation of operational security limits of physical transmission assets.
B64Adjusted because
already considered remedial actions are assessed as not sufficient The capacity is adjusted because the remedial actions were assessed as not sufficient or ineffective to avoid the expected violation of operational security limit(s).
B65Time series partially
accepted The time series is partially accepted.
B66Demand fully netted
Demand was fully netted against other demand(s).
B67Bid activated in same One or several bids were activated in the same direction within the same
direction uncongested area as the demand.
B68Optimization in
progress
B69Wrong energy market The given energy market timeframe is invalid or wrong.
timeframe
B70Message partially
accepted The detailed transactions of the received document are partially accepted. It is necessary to look at the detailed (transaction) level to determine if the transaction is accepted, rejected etc.
B71(Explicit) Permission
from the customer Based on the regulation (EU) 2016/679 (GDPR) Article 6, Lawfulness of processing: The data subject has given consent to the processing of his or her personal data for one or more specific purposes. Unavailability of tools to detect predetermined system conditions that have a high probability of causing unusual stress on the power system, for which pre -planned remedial action is considered necessary or for which automatic protective actions may be triggered such as special protection schemes or automatic load shedding. The activation optimisation framework is being executed. – Page 55 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists European Network of Transmission System Operators for Electricity Code Title Description
B72In execution of a
contract with the customer (Execution of contract) Based on the regulation (EU) 2016/679 (GDPR) Article 6, Lawfulness of processing: Processing is necessary for the performance of a contract to which the data subject is party or in order to take steps at the request of the data subject prior to entering in to a contract.
B73Legal obligations
Based on the regulation (EU) 2016/679 (GDPR) Article 6, Lawfulness of processing: Processing is necessary for compliance with a legal obligation to which the controller is subject.
B74In protection of vital
interests of the customer Based on the regulation (EU) 2016/679 (GDPR) Article 6, Lawfulness of processing: Processing is necessary in order to protect the vital interests of the data subject or of another natural person.
B75In order to perform a
duty of common (national) interest Based on the regulation (EU) 2016/679 (GDPR) Article 6, Lawfulness of processing: Processing is necessary for the performance of a task carried out in the public interest or in the exercise of official authority vested in the controller.
B76Justified interest of
the dataprocessee Based on the regulation (EU) 2016/679 (GDPR) Article 6, Lawfulness of processing: Processing is necessary for the purposes of the legitimate interests pursued by the controller or by a third party, except where such interests are overridden by the interests or fundamental rights and freedoms of the data subject which require protection of personal data, in particular where the data subject is a child
B77Fulfilment of purpose The purpose of the object or action has been fulfilled.
B78Reach of end
timestamp The object or action has reached its end timestamp.
B79Revocation
Revocation of the action or object.
RightsType
5 codesA01Use It Or Lose It
Any rights not nominated shall be lost.
A02Use It Or Sell It
Any rights that are not nominated shall be sold.
A03Allocation curtailment Rights acquired may be curtailed.
possible
A04Nomination
curtailment possible Rights acquired may be curtailed at nomination.
A05Resale possible
Acquired rights may be resold.
RoleType
58 codesA01Trade responsible
party Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A02Consumption
responsible party Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A03Combined power
exchange (not to be used) This role is no longer in the ENTSO-E Harmonised Role Model Document.
A04System operator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A05Imbalance settlement Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
responsible
A06Production
responsible party
A07Transmission capacity Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
allocator
A08Balance responsible
party Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A09Metered data
aggregator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A10Billing agent
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A11Market operator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A12Energy supplier
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A13Consumer
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A14Control area operator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A15Control block operator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A16Coordination centre
operator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A17Grid access provider
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A18Grid operator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A19Meter administrator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A20Party connected to
grid Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A21Producer
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A22Profile maintenance
party Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A23Meter operator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A24Metered data collector Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A25Metered data
responsible Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A26Metering point
administrator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. – Page 57 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A27Resource Provider
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A28Scheduling
coordinator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A29Capacity Trader
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A30Interconnection Trade Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
Responsible
A31Nomination Validator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document.
A32Market information
aggregator Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. A party that collects information from different sources and assembles it to provide a summary of the market.
A33Information receiver
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. A party, not necessarily a market participant, which receives information about the market.
A34Reserve Allocator
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. A party that informs the market of reserve requirements, receives tenders against the requirements and in compliance with the prequalification criteria, determines what tenders meet requirements and assigns tenders.
A35MOL Responsible
Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. A party that Informs the market of reserve requirements, receives tenders against the requirements and in compliance with the prequalification criteria, determines what tenders meet requirements and assigns tenders.
A36Capacity Coordinator A party, acting on behalf of the SOs involved, responsible for establishing a
coordinated Offered Capacity and/or NTC and/or ATC between several Scheduling Areas.
A37Reconciliation
Accountable Refer to role model definitions in the ENTSO -E Harmonised Role Model Document. A party that is financially accountable for the reconciled volume of energy products for a profiled local metering point.
A38Reconciliation
Responsible A party that is responsible for reconciling, within a metering grid area, the volumes used in the imbalance settlement process for profiled metering points and the actual metered quantities.
A39Data provider
A party that is responsible for providing information to a central authority.
A40Local Issuing Office
(LIO) A party that is responsible for operating a Local Issuing Office (LIO).
A41Central Issuing Office A party that is responsible for operating a Central Issuing Office (CIO).
(CIO)
A42EIC Participant
A party that participates in the EIC environment.
A43Weather analyser
A party that analyses the current and forecast weather situation and establishes a prognosis of its impact on the renewable energy environment as well as the overall load.
A44Regional Security
Coordinator (RSC) The RSC as defined in the System Operation guideline.
A45Energy Service
Company (ESCO) A party offering energy-related services to the Party Connected to Grid, but not directly active in the energy value chain or the physical infrastructure itself. The ESCO may provide insight services as well as energy management services.
A46Balancing Service
Provider A party with reserve-providing units or reserve-providing groups able to provide balancing services to LFC Operators.
A47Energy trader
A party that is selling or buying energy. – Page 58 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description A party that is responsible for the Load Frequency Control of its LFC Area or LFC Block.
A48LFC Operator
A49Transmission System The Transmission System Operator (TSO) is responsible for the transport of
electricity on the extra high-voltage and high-voltage interconnected system. This is a Operator (TSO) market participant and not a role in Harmonised Role Model.
A50Distribution System
Operator (DSO) Distribution System Operator (DSO) is responsible for transport of electricity on high voltage (optionally), medium-voltage and low-voltage distribution systems. This is a market participant and not a role in Harmonised Role Model.
A51Resource Capacity
Mechanism Operator Resource capacity mechanism operator is the party responsible to operate the resource capacity mechanism in a member state. It can either be the TSO or an independent party.
A52Resource aggregator
A party that aggregates resources for usage by a service provider for energy market services.
A53Cost sharing
calculator A party responsible for the mapping of the costs between areas and parties.
A54Settlement
responsible A party responsible for settling the costs.
A55Coordinated Capacity Coordinated Capacity Calculator is the entity or entities with the task of calculating
Calculator transmission capacity, at regional level or above.
A56Flexibility service
provider
A57Data access provider A party responsible for facilitating access to data.
A58Metered data
administrator A party responsible for storing and distributing validated measured data.
StatusType
77 codesA01Intermediate
The document is in a non finalized state.
A02Final
The document is in a definitive state.
A03Deactivated
The object being reported has been deactivated.
A04Reactivated
The object being reported has been reactivated.
A05Active
The object being reported is currently active.
A06Available
The volumes (one or more) are available.
A07Activated
The quantities in the time series have been activated. – Page 59 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A08In process
The quantities in the time series are in the process of activation (an activation request has been made).
A09Cancelled
The tender indicated in the time series has been completely cancelled. In this case the resources are no longer available to all Acquiring System Operators
A10Ordered
The quantities in the time series are to be activated.
A11Unavailable
The volumes (one or more) are unavailable.
A12RGCE agreed
The information has been agreed within the ENTSO-E Regional Group Continental Europe process.
A13Withdrawn
The information or action has been withdrawn by the submitter.
A14Creation
The action requested to be carried out is the creation of a new object.
A15Update
The action requested to be carried out is the update an existing object.
A16Deactivation
The action requested to be carried out is to deactivate an existing object.
A17Reactivation
The action requested to be carried out is to reactivate a previously deactivated object.
A18Preventive
The remedial action is applied to prevent an outage.
A19Curative
The remedial action is applied after an outage has occurred, in order to maintain the operational security.
A20Automatic
The remedial action being described is applied by an automation when an outage occurs.
A21Open
The action being described consists of disconnecting the network element to the transmission network.
A22Close
The action being described consists of connecting the network element to the transmission network.
A23Stop
The action being described consists of stopping the production or consumption connected to a network element.
A24Start
The action being described consists of starting the production or consumption connected to a network element.
A25Relative
The quantity being described is a relative value to an initial state.
A26Absolute
The quantity being described is an absolute value.
A27Curative or preventive The remedial action can be applied to prevent an outage or after an outage has
occurred in order to maintain the operational security.
A28Unshared bid
Used to indicate that the bid cannot be shared.
A29Pre Processed
to be process
A30Substituted
Substituted pre-processing data.
A31Modified
Modified pre-processing data by RSC or CGMA platform.
A32Result
Result
A33Not satisfied
The need described in the time series cannot be satisfied.
A34Rejected
The document rejected by one or more parties.
A35Preliminary
Indicative information only for initial planning purposes.
A36Planned
Is planned. – Page 60 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A37Confirmed
The status is confirmed.
A38Shall Be Used
The object defined in the series shall be used.
A39Could Be Used
The object defined in the series could be used.
A40Proposed
The status of the information is proposed.
A41Individual Network
Data The network data provided in the document or series concerns the the unique TSO area describes by the document or series.
A42Common Network
Data The network data provided in the document or series concerns the whole area describes by the document or series.
A43Setpoint schedule
The code for the power setpoint mode of operation of the HVDC link.
A44Proportional external
signal The code for the proportional external signal mode of operation of the HVDC link.
A45AC emulation
The code for the AC emulation mode of operation of the HVDC link.
A46Importing element
An importing network element in which the flow measurement enters.
A47Exporting element
An exporting network element from which the flow measurement comes out.
A48To be optimized
Describes an element which needs to be optimized by an optimization process.
A49To be monitored
Describes an element which needs to be monitored by an optimization process.
A50To be included in
capacity calculation Describes an element which needs to be taken into account in a capacity calculation process.
A51Relative to previous
point in time The quantity being described is a relative value to a previous point in time.
A52For flow optimization
Describes an element which needs to be optimized by a flow optimization process.
A53For voltage
optimization Describes an element which needs to be optimized by a voltage optimization process.
A54Presolved
Describes an active constraint that limits the exchanges. It is part of the presolved domain.
A55Not available if linked Bid not available if linked bid activated.
bid activated
A56Not available if linked Bid not available if linked bid rejected.
bid rejected
A57Not available for DA if Bid not available for direct activation if linked bid subject to direct activation.
linked bid subject to
A58Not available for DA if Bid not available for direct activation if linked bid subject to scheduled activation.
linked bid subject to
A59Not available if linked Bid not available if linked bid subject to scheduled activation.
bid subject to SA
A60Not available if linked Bid not available if linked bid subject to direct activation.
bid subject to DA
A61Primary market
A value is traded for the first time.
A62Secondary market
A value is traded for the second or next times between two parties.
A63Interesting
Describes an asset which is considered as interesting. – Page 61 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A64Relevant
Describes an asset which is considered as relevant.
A65Conditionally
available Bid available as long as none of the conditions associated with the linked bids materialise.
A66Conditionally
unavailable Bid unavailable as long as none of the conditions associated with the linked bids materialise.
A67Available if linked bid Bid available if linked bid activated.
activated
A68Available if linked bid Bid available if linked bid rejected.
rejected
A69Available if linked bid Bid available if linked bid subject to scheduled activation.
subject to SA
A70Available if linked bid Bid available if linked bid subject to direct activation.
subject to DA
A71Available for DA if
linked bid subject to
DABid available for direct activation if linked bid subject to direct activation.
A72Available for DA if
linked bid subject to
SABid available for direct activation if linked bid subject to scheduled activation.
A73Delta
Describes a status representing a difference between two values.
A74Validated
The object or action was validated.
A75Invalid
The object or action was invalid.
TarifTypeType
6 codesA01Winter HT
Winter HT tariff.
A02Winter HHT
Winter HHT tariff.
A03Winter NT
Winter NT tariff.
A04Summer HT
Summer HT tariff.
A05Summer HHT1
Summer HHT1 tariff.
A06Summer HHT2
Summer HHT2 tariff.
TimeframeType
45 codesA01Real time
The information provided concerns real time timeframe.
A02Intraday
The information provided concerns an intra day timeframe.
A03Hour-1
The information provided concerns 1 hour ahead for given delivery hour.
A04Hour-2
The information provided concerns 2 hours ahead for given delivery hour.
A05Hour-3
The information provided concerns 3 hours ahead for given delivery hour.
A06Hour-4
The information provided concerns 4 hours ahead for given delivery hour.
A07Hour-5
The information provided concerns 5 hours ahead for given delivery hour.
A08Hour-6
The information provided concerns 6 hours ahead for given delivery hour.
A09Hour-7
The information provided concerns 7 hours ahead for given delivery hour.
A10Hour-8
The information provided concerns 8 hours ahead for given delivery hour.
A11Hour-9
The information provided concerns 9 hours ahead for given delivery hour.
A12Hour-10
The information provided concerns 10 hours ahead for given delivery hour.
A13Hour-11
The information provided concerns 11 hours ahead for given delivery hour.
A14Hour-12
The information provided concerns 12 hours ahead for given delivery hour.
A15Hour-13
The information provided concerns 13 hours ahead for given delivery hour.
A16Hour-14
The information provided concerns 14 hours ahead for given delivery hour.
A17Hour-15
The information provided concerns 15 hours ahead for given delivery hour.
A18Hour-16
The information provided concerns 16 hours ahead for given delivery hour.
A19Hour-17
The information provided concerns 17 hours ahead for given delivery hour.
A20Hour-18
The information provided concerns 18 hours ahead for given delivery hour.
A21Hour-19
The information provided concerns 19 hours ahead for given delivery hour.
A22Hour-20
The information provided concerns 20 hours ahead for given delivery hour.
A23Hour-21
The information provided concerns 21 hours ahead for given delivery hour.
A24Hour-22
The information provided concerns 22 hours ahead for given delivery hour.
A25Hour-23
The information provided concerns 23 hours ahead for given delivery hour.
A26Hour-24
The information provided concerns 24 hours ahead for given delivery hour.
A27Hour-25
The information provided concerns 25 hours ahead for given delivery hour.
A28Hour-26
The information provided concerns 26 hours ahead for given delivery hour.
A29Hour-27
The information provided concerns 27 hours ahead for given delivery hour.
A30Hour-28
The information provided concerns 28 hours ahead for given delivery hour. – Page 63 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code European Network of Transmission System Operators for Electricity Title Description
A31Hour-29
The information provided concerns 29 hours ahead for given delivery hour.
A32Hour-30
The information provided concerns 30 hours ahead for given delivery hour.
A33Hour-31
The information provided concerns 31 hours ahead for given delivery hour.
A34Day ahead
The information provided concerns day ahead timeframe.
A35Day-2
The information provided concerns two days ahead timeframe.
A36Day-3
The information provided concerns three days ahead timeframe.
A37Day-4
The information provided concerns four days ahead timeframe.
A38Day-5
The information provided concerns five days ahead timeframe.
A39Day-6
The information provided concerns six days ahead timeframe.
A40Day-7
The information provided concerns seven days ahead timeframe.
A41Week ahead
The information provided concerns next week ahead timeframe.
A42Week-0
The information provided concerns current week timeframe.
A43Week+1
The information provided concerns previous week timeframe.
A44Month ahead
The information provided concerns month ahead timeframe.
A45Year ahead
The information provided concerns year ahead timeframe.
UnitOfMeasureType
5 codesA59OKTA unit
A unit of measurement of the cloudiness expressed in OKTA or OCTA, i.e. A unit of count defining the number of eighth-parts as a measure of the celestial dome cloud coverage.
A90gigawatt
GW unit as per UN/CEFACT recommendation 20. – Page 64 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code
A97European Network of
Transmission System Operators for Electricity Title hectopascal Description A unit of measurement of the pressure expressed in hectopascal. AMP ampere The unit of electrical current in the International system of Units (SI) equivalent to one Coulomb per second. C62 One A unit for dimensionless quantities, also called quantities of dimension one. CEL Celsius A unit of measurement of temperature expressed in degree Celsius. D54 watt per square meter A unit of measurement of the density of heat flow rate expressed in watt per square meter.
DDdegree (unit of angle) A unit of measurement of angles expressed in a 0 to 360 degree gradient.
E08Megawatt per Hertz
A unit of energy expressed as the load change in million watts that will cause a frequency shift of one hertz. GWH gigawatt hour GWh unit as per UN/CEFACT recommendation 20. HMQ cubic hectometres A unit of volume equal to one million cubic metres. HTZ Hertz HTZ unit as per UN/CEFACT recommendation 20. KEL K (Kelvin) Temperature unit refer ISO 80000-5 (Quantities and units, Part 5: Thermodynamics). KMT kilometre km unit as per UN/CEFACT recommendation 20. KVR kilovolt ampere reactive A unit of electrical reactive power represented by a current of one thousand amperes flowing due to a potential difference of one thousand volts where the sine of the phase angle between them is 1. The unity power factor is expressed in thousands of a volt ampere reactive. KVT kilovolt kV unit as per UN/CEFACT recommendation 20. KWH kilowatt hour A total amount of electrical energy transferred or consumed in one hour. KWT kilowatt A unit of bulk power flow, which can be defined as the rate of energy transfer /consumption when a current of 1000 amperes flows due to a potential of 1000 volts at unity power factor expressed in thousands of a watt. MAH megavolt ampere reactive hours Total amount of reactive power across a power system. MAR megavolt ampere reactive A unit of electrical reactive power represented by a current of one thousand amperes flowing due to a potential difference of one thousand volts where the sine of the phase angle between them is 1. MAW megawatt A unit of bulk power flow, which can be defined as the rate of energy transfer /consumption when a current of 1000 amperes flows due to a potential of 1000 volts at unity power factor expressed in millions of a watt. MIN minute A period of time equal to sixty seconds. MMT millimeter A unit of measurement of length expressed in millimeter. MQS cubic metres per second The volume flow rate of cubic metre per second. MTQ cubic metre A Cubic metre. MTR metre The length of a metre. MTS meter per second A unit of measurement of the speed expressed in m/s. MTZ millihertz A unit of frequency equal to 0.001 cycle per second. MVA megavolt-ampere MVA unit as per UN/CEFACT recommendation 20. MWH megawatt hours The total amount of bulk energy transferred or consumed. – Page 65 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e ENTSO-E codelists Code
UnitSymbol
2 codesDDdegree (unit of angle) A unit of measurement of angles expressed in a 0 to 360 degree gradient.
GKH grams per kilowatt hour It represents the mass rate of emissions per unit of work accomplished. HTZ Hertz HTZ unit as per UN/CEFACT recommendation 20 KVT kV The symbol of kV MAR MVAr The symbol of MVAr MAW MW The symbol of MW MVA megavolt-ampere MVA unit as per UN/CEFACT recommendation 20 OHM Ohm The symbol of Ohm Unit
P1A unit of proportion equal to 0.01.
Percent 318 319 2.37 DocumentType enumeration 320 321 The DocumentTypeList is only used in XML instances using deprecated ENTSO -E schema; otherwise for XML instances based CIM, the codelist is MessageTypeList. 322 323 Therefore, you are kindly advised to refer to the MessageType enumeration, which includes the same enumeration codes. – Page 66 of 66 – ENTSO-E | Rue de Spa, 8 | 1000 Brussels | [email protected] | www.entsoe.eu | @entso_e
Disclaimer: This guide is provided for educational purposes only and is not an authoritative source. While we strive for accuracy, some definitions and figures may be simplified or approximate. For professional or regulatory purposes, please cross-check information with official documents from ENTSO-E, national regulators, or academic publications.